WBSProject CategoriesLabor Hrs.Start DateFinish DatesDuration:Comments
DEPARTMENT TOTAL10,10911/15/2412/13/24.:.
6INTERIOR9,49711/15/2412/13/244.2w:
8EXTERIOR61212/02/2412/13/2433.2w:
******** *********************************************************************************
.
Department Job Schedules
WBSJob DescriptionLabor Hrs.Start DateFinish DateDuration:Comments
6INTERIOR9,49711/15/2412/13/244.2w:
601  LOWER GUEST FRAMING68011/18/2412/13/244.2w:
601-09    Carpentry68011/18/2412/13/244.0w:
601-09-01      Joiner Floor40011/18/2412/13/24160.0h:
601-09-01-L        Labor40011/18/2412/13/244.0w:
601-09-01-L 01          Cut floor panels4011/25/2411/29/2440.0h:
601-09-01-L 02          Fabricate sound damping foundation strips12011/18/2411/22/2440.0h:
601-09-01-L 03          Install floor panels foundation strips12012/02/2412/06/2440.0h:
601-09-01-L 04          Install sub-floor panels12012/09/2412/13/2440.0h:
601-09-02      Bulkheads/Cabins28011/26/2412/13/24108.0h:
601-09-02-L        Labor28011/26/2412/13/242.7w:
601-09-02-L 01          Cut all shipside and inner wall panels4012/09/2412/13/2440.0h:
601-09-02-L 02          Cut all AC and window boxes4011/26/2412/03/2440.0h:
601-09-02-L 03          Assemble all shipside and inner wall panels4812/03/2412/06/2424.0h:
601-09-02-L 04          Assemble all AC and window boxes2412/06/2412/09/2412.0h:
601-09-02-L 05          Dry-fit all shipside and inner wall panels onboard3212/10/2412/11/2416.0h:
601-09-02-L 06          Dry-fit all AC and window boxes onboard3212/12/2412/13/2416.0h:
601-09-02-L 07          Install all shipside and inner wall panels onboard3212/10/2412/11/2416.0h:
601-09-02-L 08          Install all AC and window boxes onboard3212/12/2412/13/2416.0h:
602  Guest Stateroom 132312/02/2412/13/242.0w:
602-09    Carpentry32312/02/2412/13/242.0w:
602-09-01      Room Framing4812/04/2412/13/2458.0h:
602-09-01-L        Labor4812/06/2412/13/241.2w:
602-09-01-L 01          Install shipside framing812/06/2412/06/248.0h:
602-09-01-L 02          Install portlight framing812/09/2412/09/248.0h:
602-09-01-L 03          Frame closet sides812/10/2412/10/248.0h:
602-09-01-L 04          Install overhead framing812/11/2412/11/248.0h:
602-09-01-L 05          Rough in window box812/12/2412/12/248.0h:
602-09-01-L 06          Provide accesses to pipes/wiring812/13/2412/13/248.0h:
602-09-02      AC Plenum1612/12/2412/13/2416.0h:
602-09-02-L        Labor1612/12/2412/13/240.4w:
602-09-02-L 01          Fabricate AC plenum412/12/2412/12/244.0h:
602-09-02-L 02          Install AC plenum412/12/2412/12/244.0h:
602-09-02-L 03          Rough in AC ducting412/13/2412/13/244.0h:
602-09-02-L 04          Connect AC ducting412/13/2412/13/244.0h:
602-09-03      Bed1412/12/2412/13/2414.0h:
602-09-03-L        Labor1412/12/2412/13/240.4w:
602-09-03-L 01          Install toe kick412/12/2412/12/244.0h:
602-09-03-L 02          Install base frame212/12/2412/12/242.0h:
602-09-03-L 03          Install side/foot rails412/13/2412/13/244.0h:
602-09-03-L 04          Install upper rail412/13/2412/13/244.0h:
602-09-04      Nightstand1312/12/2412/13/2413.0h:
602-09-04-L        Labor1312/12/2412/13/240.3w:
602-09-04-L 01          Install toe kick212/12/2412/12/242.0h:
602-09-04-L 02          Install base frame212/12/2412/12/242.0h:
602-09-04-L 03          Fabricate upper rail/Countertop212/12/2412/13/242.0h:
602-09-04-L 04          Install filler piece to bed212/13/2412/13/242.0h:
602-09-04-L 05          Install panels/door412/13/2412/13/244.0h:
602-09-04-L 06          Install shelf112/13/2412/13/241.0h:
602-09-05      Wall7812/02/2412/13/2478.0h:
602-09-05-L        Labor7812/02/2412/13/242.0w:
602-09-05-L 01          Install finish walls boxes at FWD nightstand412/02/2412/02/244.0h:
602-09-05-L 02          Install finish walls boxes at AFT nightstand412/02/2412/03/244.0h:
602-09-05-L 03          Clean and prep walls for wall covering1212/03/2412/04/2412.0h:
602-09-05-L 04          Install finish window box panels (sides/top/bottom)1212/04/2412/06/2412.0h:
602-09-05-L 05          Install finish window box pilasters612/06/2412/06/246.0h:
602-09-05-L 06          Install finish window box picture framing412/09/2412/09/244.0h:
602-09-05-L 07          Install simple Base board molding1212/09/2412/10/2412.0h:
602-09-05-L 08          Install portlight panel412/11/2412/11/244.0h:
602-09-05-L 09          Cut in outlets/switches1212/11/2412/12/2412.0h:
602-09-05-L 10          Fab headboard panel812/13/2412/13/248.0h:
602-09-06      Ceiling6012/04/2412/13/2460.0h:
602-09-06-L        Labor6012/04/2412/13/241.5w:
602-09-06-L 01          Install simple perimeter crown molding1212/04/2412/05/2412.0h:
602-09-06-L 02          Install AC grill finish panel412/06/2412/06/244.0h:
602-09-06-L 03          Fabricate ceiling panels4012/06/2412/13/2440.0h:
602-09-06-L 04          Install perimeter AC soffit412/13/2412/13/244.0h:
602-09-07      Doors4812/06/2412/13/2448.0h:
602-09-07-L        Labor4812/06/2412/13/241.2w:
602-09-07-L 01          Prep door opening to receive door jabs1212/06/2412/09/2412.0h:
602-09-07-L 02          Install entry door casing and Jabs (3)2412/09/2412/12/2424.0h:
602-09-07-L 03          Install entry doors (3)1212/12/2412/13/2412.0h:
602-09-08      Closet3612/09/2412/13/2436.0h:
602-09-08-L        Labor3612/09/2412/13/240.9w:
602-09-08-L 01          Install finish paneling2412/09/2412/12/2424.0h:
602-09-08-L 02          Install lower cabinet frame412/12/2412/12/244.0h:
602-09-08-L 03          Install lower cabinet trim/counter top412/13/2412/13/244.0h:
602-09-08-L 04          Install lower cabinet shelves412/13/2412/13/244.0h:
602-09-09      Trim1012/12/2412/13/2410.0h:
602-09-09-L        Labor1012/12/2412/13/240.3w:
602-09-09-L 01          Install upholstered bed trim412/12/2412/13/244.0h:
602-09-09-L 02          Install finished ceiling panels612/13/2412/13/246.0h:
603  Guest Bathroom 114212/06/2412/13/242.4w:
603-09    Carpentry14212/06/2412/13/241.0w:
603-09-01      Room Framing3212/06/2412/13/2441.0h:
603-09-01-L        Labor3212/10/2412/13/240.8w:
603-09-01-L 01          Install cabin side paneling412/10/2412/10/244.0h:
603-09-01-L 02          Frame shower enclousre412/10/2412/10/244.0h:
603-09-01-L 03          Install shower sub-floor412/11/2412/11/244.0h:
603-09-01-L 04          Fabricate shower overhead panel412/11/2412/11/244.0h:
603-09-01-L 05          West system shower enclosure412/12/2412/12/244.0h:
603-09-01-L 06          Install overhead framing412/12/2412/12/244.0h:
603-09-01-L 07          Cut pipe/electric accesses412/13/2412/13/244.0h:
603-09-01-L 08          Rough AC ducting from stateroom412/13/2412/13/244.0h:
603-09-02      Sink Vanity Cabinet1812/11/2412/13/2418.0h:
603-09-02-L        Labor1812/11/2412/13/240.5w:
603-09-02-L 01          Install toe kick412/11/2412/12/244.0h:
603-09-02-L 02          Install base frame412/12/2412/12/244.0h:
603-09-02-L 03          Install side filler pieces212/12/2412/12/242.0h:
603-09-02-L 04          Install finish panels/door412/13/2412/13/244.0h:
603-09-02-L 05          Install shelf212/13/2412/13/242.0h:
603-09-02-L 06          Install sub-countertop for stone212/13/2412/13/242.0h:
603-09-03      Medicine Cabinet1212/12/2412/13/2412.0h:
603-09-03-L        Labor1212/12/2412/13/240.3w:
603-09-03-L 01          Install base frame212/12/2412/12/242.0h:
603-09-03-L 02          Install verical light recesses212/12/2412/12/242.0h:
603-09-03-L 03          Install side filler pieces212/13/2412/13/242.0h:
603-09-03-L 04          Install doors 412/13/2412/13/244.0h:
603-09-03-L 05          Install shelves212/13/2412/13/242.0h:
603-09-04      Walls2412/11/2412/13/2424.0h:
603-09-04-L        Labor2412/11/2412/13/240.6w:
603-09-04-L 01          Install Ship side finish wood panel412/11/2412/11/244.0h:
603-09-04-L 02          Install fwd finish wood panel412/11/2412/11/244.0h:
603-09-04-L 03          Install fwd finish wood panel molding412/12/2412/12/244.0h:
603-09-04-L 04          Install base board412/12/2412/12/244.0h:
603-09-04-L 05          Prep walls for wall coverings412/13/2412/13/244.0h:
603-09-04-L 06          Cut in outlets/switches412/13/2412/13/244.0h:
603-09-05      Ceiling2812/10/2412/13/2428.0h:
603-09-05-L        Labor2812/10/2412/13/240.7w:
603-09-05-L 01          Install simple perimeter crown molding412/10/2412/10/244.0h:
603-09-05-L 02          Install AC grill finish panel412/11/2412/11/244.0h:
603-09-05-L 03          Install perimeter AC soffit412/11/2412/11/244.0h:
603-09-05-L 04          Fab overhead panels1612/12/2412/13/2416.0h:
603-09-06      Flooring1212/12/2412/13/2412.0h:
603-09-06-L        Labor1212/12/2412/13/240.3w:
603-09-06-L 01          Prep flooring for stonework1212/12/2412/13/2412.0h:
603-09-07      Finish Trims1612/12/2412/13/2416.0h:
603-09-07-L        Labor1612/12/2412/13/240.4w:
603-09-07-L 01          Install overhead panels812/12/2412/12/248.0h:
603-09-07-L 02          Install bathroom accessories812/13/2412/13/248.0h:
604  Guest Stateroom 240711/29/2412/13/242.2w:
604-09    Carpentry40711/29/2412/13/242.2w:
604-09-01      Room Framing8811/29/2412/13/2488.0h:
604-09-01-L        Labor8811/29/2412/13/242.2w:
604-09-01-L 01          Install shipside framing1611/29/2412/02/2416.0h:
604-09-01-L 02          Install portlight framing1212/03/2412/04/2412.0h:
604-09-01-L 03          Frame closet sides1612/04/2412/06/2416.0h:
604-09-01-L 04          Install overhead framing2412/06/2412/11/2424.0h:
604-09-01-L 05          Rough in window box1212/11/2412/12/2412.0h:
604-09-01-L 06          Provide accesses to pipes/wiring812/13/2412/13/248.0h:
604-09-02      AC Plenum6012/04/2412/13/2460.0h:
604-09-02-L        Labor6012/04/2412/13/241.5w:
604-09-02-L 01          Fabricate AC plenum3212/04/2412/10/2432.0h:
604-09-02-L 02          Install AC plenum1212/10/2412/11/2412.0h:
604-09-02-L 03          Rough in AC ducting1212/12/2412/13/2412.0h:
604-09-02-L 04          Connect AC ducting412/13/2412/13/244.0h:
604-09-03      Bed1412/12/2412/13/2414.0h:
604-09-03-L        Labor1412/12/2412/13/240.4w:
604-09-03-L 01          Install toe kick412/12/2412/12/244.0h:
604-09-03-L 02          Install base frame212/12/2412/12/242.0h:
604-09-03-L 03          Install side/foot rails412/13/2412/13/244.0h:
604-09-03-L 04          Install upper rail412/13/2412/13/244.0h:
604-09-04      Nightstand1312/12/2412/13/2413.0h:
604-09-04-L        Labor1312/12/2412/13/240.3w:
604-09-04-L 01          Install toe kick212/12/2412/12/242.0h:
604-09-04-L 02          Install base frame212/12/2412/12/242.0h:
604-09-04-L 03          Fabricate upper rail/Countertop212/12/2412/13/242.0h:
604-09-04-L 04          Install filler piece to bed212/13/2412/13/242.0h:
604-09-04-L 05          Install panels/door412/13/2412/13/244.0h:
604-09-04-L 06          Install shelf112/13/2412/13/241.0h:
604-09-05      Wall7812/02/2412/13/2478.0h:
604-09-05-L        Labor7812/02/2412/13/242.0w:
604-09-05-L 01          Install finish walls boxes at FWD nightstand412/02/2412/02/244.0h:
604-09-05-L 02          Install finish walls boxes at AFT nightstand412/02/2412/03/244.0h:
604-09-05-L 03          Clean and prep walls for wall covering1212/03/2412/04/2412.0h:
604-09-05-L 04          Install finish window box panels (sides/top/bottom)1212/04/2412/06/2412.0h:
604-09-05-L 05          Install finish window box pilasters612/06/2412/06/246.0h:
604-09-05-L 06          Install finish window box picture framing412/09/2412/09/244.0h:
604-09-05-L 07          Install simple Base board molding1212/09/2412/10/2412.0h:
604-09-05-L 08          Install portlight panel412/11/2412/11/244.0h:
604-09-05-L 09          Cut in outlets/switches1212/11/2412/12/2412.0h:
604-09-05-L 10          Fab headboard panel812/13/2412/13/248.0h:
604-09-06      Ceiling6012/04/2412/13/2460.0h:
604-09-06-L        Labor6012/04/2412/13/241.5w:
604-09-06-L 01          Install simple perimeter crown molding1212/04/2412/05/2412.0h:
604-09-06-L 02          Install AC grill finish panel412/06/2412/06/244.0h:
604-09-06-L 03          Fabricate ceiling panels4012/06/2412/13/2440.0h:
604-09-06-L 04          Install perimeter AC soffit412/13/2412/13/244.0h:
604-09-07      Doors4812/06/2412/13/2448.0h:
604-09-07-L        Labor4812/06/2412/13/241.2w:
604-09-07-L 01          Prep door opening to receive door jabs1212/06/2412/09/2412.0h:
604-09-07-L 02          Install entry door casing and Jabs (3)2412/09/2412/12/2424.0h:
604-09-07-L 03          Install entry doors (3)1212/12/2412/13/2412.0h:
604-09-08      Closet3612/09/2412/13/2436.0h:
604-09-08-L        Labor3612/09/2412/13/240.9w:
604-09-08-L 01          Install finish paneling2412/09/2412/12/2424.0h:
604-09-08-L 02          Install lower cabinet frame412/12/2412/12/244.0h:
604-09-08-L 03          Install lower cabinet trim/counter top412/13/2412/13/244.0h:
604-09-08-L 04          Install lower cabinet shelves412/13/2412/13/244.0h:
604-09-09      Trim1012/12/2412/13/2410.0h:
604-09-09-L        Labor1012/12/2412/13/240.3w:
604-09-09-L 01          Install upholstered bed trim412/12/2412/13/244.0h:
604-09-09-L 02          Install finished ceiling panels612/13/2412/13/246.0h:
605  Guest Bathroom 217212/04/2412/13/242.4w:
605-09    Carpentry17212/04/2412/13/241.5w:
605-09-01      Room Framing6012/04/2412/13/2460.0h:
605-09-01-L        Labor6012/04/2412/13/241.5w:
605-09-01-L 01          Install cabin side paneling812/04/2412/05/248.0h:
605-09-01-L 02          Frame shower enclousre1212/05/2412/06/2412.0h:
605-09-01-L 03          Install shower sub-floor812/09/2412/09/248.0h:
605-09-01-L 04          Fabricate shower overhead panel812/10/2412/10/248.0h:
605-09-01-L 05          West system shower enclosure812/11/2412/11/248.0h:
605-09-01-L 06          Install overhead framing812/12/2412/12/248.0h:
605-09-01-L 07          Cut pipe/electric accesses412/13/2412/13/244.0h:
605-09-01-L 08          Rough AC ducting from stateroom412/13/2412/13/244.0h:
605-09-02      Sink Vanity Cabinet1612/12/2412/13/2416.0h:
605-09-02-L        Labor1612/12/2412/13/240.4w:
605-09-02-L 01          Install toe kick212/12/2412/12/242.0h:
605-09-02-L 02          Install base frame212/12/2412/12/242.0h:
605-09-02-L 03          Install side filler pieces212/12/2412/12/242.0h:
605-09-02-L 04          Install finish panels/door412/12/2412/13/244.0h:
605-09-02-L 05          Install shelf212/13/2412/13/242.0h:
605-09-02-L 06          Install pipe box around plumbing212/13/2412/13/242.0h:
605-09-02-L 07          Install sub-countertop for stone212/13/2412/13/242.0h:
605-09-03      Medicine Cabinet1012/12/2412/13/2410.0h:
605-09-03-L        Labor1012/12/2412/13/240.3w:
605-09-03-L 01          Install base frame212/12/2412/12/242.0h:
605-09-03-L 02          Install verical light recesses212/13/2412/13/242.0h:
605-09-03-L 03          Install side filler pieces212/13/2412/13/242.0h:
605-09-03-L 04          Install doors 212/13/2412/13/242.0h:
605-09-03-L 05          Install shelves212/13/2412/13/242.0h:
605-09-04      Walls3012/10/2412/13/2430.0h:
605-09-04-M        Labor3012/10/2412/13/240.8w:
605-09-04-M 01          Install Ship side finish wood panel412/10/2412/10/244.0h:
605-09-04-M 02          Install fwd finish wood panel412/10/2412/11/244.0h:
605-09-04-M 03          Install fwd finish wood panel molding412/11/2412/11/244.0h:
605-09-04-M 04          Install base board612/11/2412/12/246.0h:
605-09-04-M 05          Prep walls for wall coverings812/12/2412/13/248.0h:
605-09-04-M 06          Cut in outlets/switches412/13/2412/13/244.0h:
605-09-05      Ceiling2812/10/2412/13/2428.0h:
605-09-05-L        Labor2812/10/2412/13/240.7w:
605-09-05-L 01          Install simple perimeter crown molding412/10/2412/10/244.0h:
605-09-05-L 02          Install AC grill finish panel412/11/2412/11/244.0h:
605-09-05-L 03          Install perimeter AC soffit412/11/2412/11/244.0h:
605-09-05-L 04          Fab overhead panels1612/12/2412/13/2416.0h:
605-09-06      Flooring1212/12/2412/13/2412.0h:
605-09-06-L        Labor1212/12/2412/13/240.3w:
605-09-06-L 01          Prep flooring for stonework1212/12/2412/13/2412.0h:
605-09-07      Finish Trims1612/12/2412/13/2416.0h:
605-09-07-L        Labor1612/12/2412/13/240.4w:
605-09-07-L 01          Install overhead panels812/12/2412/12/248.0h:
605-09-07-L 02          Install bathroom accessories812/13/2412/13/248.0h:
606  Guest Stateroom 359211/25/2412/13/242.9w:
606-09    Carpentry59211/25/2412/13/242.9w:
606-09-02      Room Assembly11611/25/2412/13/24116.0h:
606-09-02-L        Labor11611/25/2412/13/242.9w:
606-09-02-L 01          Install shipside framing3211/25/2411/29/2432.0h:
606-09-02-L 02          Install portlight framing2411/29/2412/04/2424.0h:
606-09-02-L 03          Frame closet sides1612/04/2412/06/2416.0h:
606-09-02-L 04          Install overhead framing2412/06/2412/11/2424.0h:
606-09-02-L 05          Rough in window box1212/11/2412/12/2412.0h:
606-09-02-L 06          Provide accesses to pipes/wiring812/13/2412/13/248.0h:
606-09-05      Bed1412/12/2412/13/2414.0h:
606-09-05-L        Labor1412/12/2412/13/240.4w:
606-09-05-L 01          Install toe kick412/12/2412/12/244.0h:
606-09-05-L 02          Install base frame212/12/2412/12/242.0h:
606-09-05-L 03          Install side/foot rails412/13/2412/13/244.0h:
606-09-05-L 04          Install upper rail412/13/2412/13/244.0h:
606-09-06      Nightstands1412/13/2412/13/248.0h:
606-09-06-L        Labor1412/13/2412/13/240.2w:
606-09-06-L 01          Install toe kick212/13/2412/13/242.0h:
606-09-06-L 02          Install base frame212/13/2412/13/242.0h:
606-09-06-L 03          Install side panels212/13/2412/13/242.0h:
606-09-06-L 04          Install drawers412/13/2412/13/244.0h:
606-09-06-L 05          Install toe kick finish panels212/13/2412/13/242.0h:
606-09-06-L 06          Install countertop finish panels212/13/2412/13/242.0h:
606-09-07      Dresser Cabinet1412/13/2412/13/248.0h:
606-09-07-L        Labor1412/13/2412/13/240.2w:
606-09-07-L 01          Install toe kick212/13/2412/13/242.0h:
606-09-07-L 02          Install base frame212/13/2412/13/242.0h:
606-09-07-L 03          Install side panels212/13/2412/13/242.0h:
606-09-07-L 04          Install drawers412/13/2412/13/244.0h:
606-09-07-L 05          Install toe kick finish panels212/13/2412/13/242.0h:
606-09-07-L 06          Install countertop finish panels212/13/2412/13/242.0h:
606-09-08      Vanity1412/13/2412/13/248.0h:
606-09-08-L        Labor1412/13/2412/13/240.2w:
606-09-08-L 01          Install toe kick212/13/2412/13/242.0h:
606-09-08-L 02          Install base frame212/13/2412/13/242.0h:
606-09-08-L 03          Install side panels212/13/2412/13/242.0h:
606-09-08-L 04          Install drawers412/13/2412/13/244.0h:
606-09-08-L 05          Install toe kick finish panels212/13/2412/13/242.0h:
606-09-08-L 06          Install countertop finish panels212/13/2412/13/242.0h:
606-09-09      TV Cabinet1412/13/2412/13/248.0h:
606-09-09-L        Labor1412/13/2412/13/240.2w:
606-09-09-L 01          Install toe kick212/13/2412/13/242.0h:
606-09-09-L 02          Install base frame212/13/2412/13/242.0h:
606-09-09-L 03          Install side panels212/13/2412/13/242.0h:
606-09-09-L 04          Install drawers412/13/2412/13/244.0h:
606-09-09-L 05          Install toe kick finish panels212/13/2412/13/242.0h:
606-09-09-L 06          Install countertop finish panels212/13/2412/13/242.0h:
606-09-10      AC Plenum 1412/13/2412/13/248.0h:
606-09-10-L        Labor1412/13/2412/13/240.2w:
606-09-10-L 01          Install toe kick212/13/2412/13/242.0h:
606-09-10-L 02          Install base frame212/13/2412/13/242.0h:
606-09-10-L 03          Install side panels212/13/2412/13/242.0h:
606-09-10-L 04          Install drawers412/13/2412/13/244.0h:
606-09-10-L 05          Install toe kick finish panels212/13/2412/13/242.0h:
606-09-10-L 06          Install countertop finish panels212/13/2412/13/242.0h:
606-09-11      Closet1412/13/2412/13/248.0h:
606-09-11-L        Labor1412/13/2412/13/240.2w:
606-09-11-L 01          Install toe kick212/13/2412/13/242.0h:
606-09-11-L 02          Install base frame212/13/2412/13/242.0h:
606-09-11-L 03          Install side panels212/13/2412/13/242.0h:
606-09-11-L 04          Install drawers412/13/2412/13/244.0h:
606-09-11-L 05          Install toe kick finish panels212/13/2412/13/242.0h:
606-09-11-L 06          Install countertop finish panels212/13/2412/13/242.0h:
606-09-12      Window Box1412/13/2412/13/248.0h:
606-09-12-L        Labor1412/13/2412/13/240.2w:
606-09-12-L 01          Install toe kick212/13/2412/13/242.0h:
606-09-12-L 02          Install base frame212/13/2412/13/242.0h:
606-09-12-L 03          Install side panels212/13/2412/13/242.0h:
606-09-12-L 04          Install drawers412/13/2412/13/244.0h:
606-09-12-L 05          Install toe kick finish panels212/13/2412/13/242.0h:
606-09-12-L 06          Install countertop finish panels212/13/2412/13/242.0h:
606-09-13      Panels - Ceiling7812/02/2412/13/2478.0h:
606-09-13-L        Labor7812/02/2412/13/242.0w:
606-09-13-L 01          Install finish walls boxes at FWD nightstand412/02/2412/02/244.0h:
606-09-13-L 02          Install finish walls boxes at AFT nightstand412/02/2412/03/244.0h:
606-09-13-L 03          Clean and prep walls for wall covering1212/03/2412/04/2412.0h:
606-09-13-L 04          Install finish window box panels (sides/top/bottom)1212/04/2412/06/2412.0h:
606-09-13-L 05          Install finish window box pilasters612/06/2412/06/246.0h:
606-09-13-L 06          Install finish window box picture framing412/09/2412/09/244.0h:
606-09-13-L 07          Install simple Base board molding1212/09/2412/10/2412.0h:
606-09-13-L 08          Install portlight panel412/11/2412/11/244.0h:
606-09-13-L 09          Cut in outlets/switches1212/11/2412/12/2412.0h:
606-09-13-L 10          Fab headboard panel812/13/2412/13/248.0h:
606-09-14      Panels - Wall6012/04/2412/13/2460.0h:
606-09-14-L        Labor6012/04/2412/13/241.5w:
606-09-14-L 01          Install simple perimeter crown molding1212/04/2412/05/2412.0h:
606-09-14-L 02          Install AC grill finish panel412/06/2412/06/244.0h:
606-09-14-L 03          Fabricate ceiling panels4012/06/2412/13/2440.0h:
606-09-14-L 04          Install perimeter AC soffit412/13/2412/13/244.0h:
606-09-15      Panels - Headboard6012/04/2412/13/2460.0h:
606-09-15-L        Labor6012/04/2412/13/241.5w:
606-09-15-L 01          Install simple perimeter crown molding1212/04/2412/05/2412.0h:
606-09-15-L 02          Install AC grill finish panel412/06/2412/06/244.0h:
606-09-15-L 03          Fabricate ceiling panels4012/06/2412/13/2440.0h:
606-09-15-L 04          Install perimeter AC soffit412/13/2412/13/244.0h:
606-09-16      Moulding - Ceiling3612/09/2412/13/2436.0h:
606-09-16-L        Labor3612/09/2412/13/240.9w:
606-09-16-L 01          Install finish paneling2412/09/2412/12/2424.0h:
606-09-16-L 02          Install lower cabinet frame412/12/2412/12/244.0h:
606-09-16-L 03          Install lower cabinet trim/counter top412/13/2412/13/244.0h:
606-09-16-L 04          Install lower cabinet shelves412/13/2412/13/244.0h:
606-09-17      Moulding - Crown3612/09/2412/13/2436.0h:
606-09-17-L        Labor3612/09/2412/13/240.9w:
606-09-17-L 01          Install finish paneling2412/09/2412/12/2424.0h:
606-09-17-L 02          Install lower cabinet frame412/12/2412/12/244.0h:
606-09-17-L 03          Install lower cabinet trim/counter top412/13/2412/13/244.0h:
606-09-17-L 04          Install lower cabinet shelves412/13/2412/13/244.0h:
606-09-18      Moulding - Baseboard3612/09/2412/13/2436.0h:
606-09-18-L        Labor3612/09/2412/13/240.9w:
606-09-18-L 01          Install finish paneling2412/09/2412/12/2424.0h:
606-09-18-L 02          Install lower cabinet frame412/12/2412/12/244.0h:
606-09-18-L 03          Install lower cabinet trim/counter top412/13/2412/13/244.0h:
606-09-18-L 04          Install lower cabinet shelves412/13/2412/13/244.0h:
606-09-19      Entry Doors4812/06/2412/13/2448.0h:
606-09-19-L        Labor4812/06/2412/13/241.2w:
606-09-19-L 01          Prep door opening to receive door jabs1212/06/2412/09/2412.0h:
606-09-19-L 02          Install entry door casing and Jabs (3)2412/09/2412/12/2424.0h:
606-09-19-L 03          Install entry doors (3)1212/12/2412/13/2412.0h:
606-09-20      Trim1012/12/2412/13/2410.0h:
606-09-20-L        Labor1012/12/2412/13/240.3w:
606-09-20-L 01          Install upholstered bed trim412/12/2412/13/244.0h:
606-09-20-L 02          Install finished ceiling panels612/13/2412/13/246.0h:
607  Guest Bathroom 318612/02/2412/13/242.4w:
607-09    Carpentry18612/02/2412/13/241.9w:
607-09-01      Room Framing7612/02/2412/13/2476.0h:
607-09-01-L        Labor7612/02/2412/13/241.9w:
607-09-01-L 01          Install cabin side paneling2412/02/2412/05/2424.0h:
607-09-01-L 02          Frame shower enclousre1212/05/2412/06/2412.0h:
607-09-01-L 03          Install shower sub-floor812/09/2412/09/248.0h:
607-09-01-L 04          Fabricate shower overhead panel812/10/2412/10/248.0h:
607-09-01-L 05          West system shower enclosure812/11/2412/11/248.0h:
607-09-01-L 06          Install overhead framing812/12/2412/12/248.0h:
607-09-01-L 07          Cut pipe/electric accesses412/13/2412/13/244.0h:
607-09-01-L 08          Rough AC ducting from stateroom412/13/2412/13/244.0h:
607-09-02      Sink Vanity Cabinet1812/11/2412/13/2418.0h:
607-09-02-L        Labor1812/11/2412/13/240.5w:
607-09-02-L 01          Install toe kick412/11/2412/12/244.0h:
607-09-02-L 02          Install base frame412/12/2412/12/244.0h:
607-09-02-L 03          Install side filler pieces212/12/2412/12/242.0h:
607-09-02-L 04          Install finish panels/door412/13/2412/13/244.0h:
607-09-02-L 05          Install shelf212/13/2412/13/242.0h:
607-09-02-L 06          Install sub-countertop for stone212/13/2412/13/242.0h:
607-09-03      Medicine Cabinet1212/12/2412/13/2412.0h:
607-09-03-L        Labor1212/12/2412/13/240.3w:
607-09-03-L 01          Install base frame212/12/2412/12/242.0h:
607-09-03-L 02          Install verical light recesses212/12/2412/12/242.0h:
607-09-03-L 03          Install side filler pieces212/13/2412/13/242.0h:
607-09-03-L 04          Install doors 412/13/2412/13/244.0h:
607-09-03-L 05          Install shelves212/13/2412/13/242.0h:
607-09-04      Walls2412/11/2412/13/2424.0h:
607-09-04-L        Labor2412/11/2412/13/240.6w:
607-09-04-L 01          Install Ship side finish wood panel412/11/2412/11/244.0h:
607-09-04-L 02          Install fwd finish wood panel412/11/2412/11/244.0h:
607-09-04-L 03          Install fwd finish wood panel molding412/12/2412/12/244.0h:
607-09-04-L 04          Install base board412/12/2412/12/244.0h:
607-09-04-L 05          Prep walls for wall coverings412/13/2412/13/244.0h:
607-09-04-L 06          Cut in outlets/switches412/13/2412/13/244.0h:
607-09-05      Ceiling2812/10/2412/13/2428.0h:
607-09-05-L        Labor2812/10/2412/13/240.7w:
607-09-05-L 01          Install simple perimeter crown molding412/10/2412/10/244.0h:
607-09-05-L 02          Install AC grill finish panel412/11/2412/11/244.0h:
607-09-05-L 03          Install perimeter AC soffit412/11/2412/11/244.0h:
607-09-05-L 04          Fab overhead panels1612/12/2412/13/2416.0h:
607-09-06      Flooring1212/12/2412/13/2412.0h:
607-09-06-L        Labor1212/12/2412/13/240.3w:
607-09-06-L 01          Prep flooring for stonework1212/12/2412/13/2412.0h:
607-09-07      Finish Trims1612/12/2412/13/2416.0h:
607-09-07-L        Labor1612/12/2412/13/240.4w:
607-09-07-L 01          Install overhead panels812/12/2412/12/248.0h:
607-09-07-L 02          Install bathroom accessories812/13/2412/13/248.0h:
608  Guest Stateroom 459211/25/2412/13/242.9w:
608-09    Carpentry59211/25/2412/13/242.9w:
608-09-02      Room Assembly11611/25/2412/13/24116.0h:
608-09-02-L        Labor11611/25/2412/13/242.9w:
608-09-02-L 01          Install shipside framing3211/25/2411/29/2432.0h:
608-09-02-L 02          Install portlight framing2411/29/2412/04/2424.0h:
608-09-02-L 03          Frame closet sides1612/04/2412/06/2416.0h:
608-09-02-L 04          Install overhead framing2412/06/2412/11/2424.0h:
608-09-02-L 05          Rough in window box1212/11/2412/12/2412.0h:
608-09-02-L 06          Provide accesses to pipes/wiring812/13/2412/13/248.0h:
608-09-05      Bed1412/12/2412/13/2414.0h:
608-09-05-L        Labor1412/12/2412/13/240.4w:
608-09-05-L 01          Install toe kick412/12/2412/12/244.0h:
608-09-05-L 02          Install base frame212/12/2412/12/242.0h:
608-09-05-L 03          Install side/foot rails412/13/2412/13/244.0h:
608-09-05-L 04          Install upper rail412/13/2412/13/244.0h:
608-09-06      Nightstands1412/13/2412/13/248.0h:
608-09-06-L        Labor1412/13/2412/13/240.2w:
608-09-06-L 01          Install toe kick212/13/2412/13/242.0h:
608-09-06-L 02          Install base frame212/13/2412/13/242.0h:
608-09-06-L 03          Install side panels212/13/2412/13/242.0h:
608-09-06-L 04          Install drawers412/13/2412/13/244.0h:
608-09-06-L 05          Install toe kick finish panels212/13/2412/13/242.0h:
608-09-06-L 06          Install countertop finish panels212/13/2412/13/242.0h:
608-09-07      Dresser Cabinet1412/13/2412/13/248.0h:
608-09-07-L        Labor1412/13/2412/13/240.2w:
608-09-07-L 01          Install toe kick212/13/2412/13/242.0h:
608-09-07-L 02          Install base frame212/13/2412/13/242.0h:
608-09-07-L 03          Install side panels212/13/2412/13/242.0h:
608-09-07-L 04          Install drawers412/13/2412/13/244.0h:
608-09-07-L 05          Install toe kick finish panels212/13/2412/13/242.0h:
608-09-07-L 06          Install countertop finish panels212/13/2412/13/242.0h:
608-09-08      Vanity1412/13/2412/13/248.0h:
608-09-08-L        Labor1412/13/2412/13/240.2w:
608-09-08-L 01          Install toe kick212/13/2412/13/242.0h:
608-09-08-L 02          Install base frame212/13/2412/13/242.0h:
608-09-08-L 03          Install side panels212/13/2412/13/242.0h:
608-09-08-L 04          Install drawers412/13/2412/13/244.0h:
608-09-08-L 05          Install toe kick finish panels212/13/2412/13/242.0h:
608-09-08-L 06          Install countertop finish panels212/13/2412/13/242.0h:
608-09-09      TV Cabinet1412/13/2412/13/248.0h:
608-09-09-L        Labor1412/13/2412/13/240.2w:
608-09-09-L 01          Install toe kick212/13/2412/13/242.0h:
608-09-09-L 02          Install base frame212/13/2412/13/242.0h:
608-09-09-L 03          Install side panels212/13/2412/13/242.0h:
608-09-09-L 04          Install drawers412/13/2412/13/244.0h:
608-09-09-L 05          Install toe kick finish panels212/13/2412/13/242.0h:
608-09-09-L 06          Install countertop finish panels212/13/2412/13/242.0h:
608-09-10      AC Plenum 1412/13/2412/13/248.0h:
608-09-10-L        Labor1412/13/2412/13/240.2w:
608-09-10-L 01          Install toe kick212/13/2412/13/242.0h:
608-09-10-L 02          Install base frame212/13/2412/13/242.0h:
608-09-10-L 03          Install side panels212/13/2412/13/242.0h:
608-09-10-L 04          Install drawers412/13/2412/13/244.0h:
608-09-10-L 05          Install toe kick finish panels212/13/2412/13/242.0h:
608-09-10-L 06          Install countertop finish panels212/13/2412/13/242.0h:
608-09-11      Closet1412/13/2412/13/248.0h:
608-09-11-L        Labor1412/13/2412/13/240.2w:
608-09-11-L 01          Install toe kick212/13/2412/13/242.0h:
608-09-11-L 02          Install base frame212/13/2412/13/242.0h:
608-09-11-L 03          Install side panels212/13/2412/13/242.0h:
608-09-11-L 04          Install drawers412/13/2412/13/244.0h:
608-09-11-L 05          Install toe kick finish panels212/13/2412/13/242.0h:
608-09-11-L 06          Install countertop finish panels212/13/2412/13/242.0h:
608-09-12      Window Box1412/13/2412/13/248.0h:
608-09-12-L        Labor1412/13/2412/13/240.2w:
608-09-12-L 01          Install toe kick212/13/2412/13/242.0h:
608-09-12-L 02          Install base frame212/13/2412/13/242.0h:
608-09-12-L 03          Install side panels212/13/2412/13/242.0h:
608-09-12-L 04          Install drawers412/13/2412/13/244.0h:
608-09-12-L 05          Install toe kick finish panels212/13/2412/13/242.0h:
608-09-12-L 06          Install countertop finish panels212/13/2412/13/242.0h:
608-09-13      Panels - Ceiling7812/02/2412/13/2478.0h:
608-09-13-L        Labor7812/02/2412/13/242.0w:
608-09-13-L 01          Install finish walls boxes at FWD nightstand412/02/2412/02/244.0h:
608-09-13-L 02          Install finish walls boxes at AFT nightstand412/02/2412/03/244.0h:
608-09-13-L 03          Clean and prep walls for wall covering1212/03/2412/04/2412.0h:
608-09-13-L 04          Install finish window box panels (sides/top/bottom)1212/04/2412/06/2412.0h:
608-09-13-L 05          Install finish window box pilasters612/06/2412/06/246.0h:
608-09-13-L 06          Install finish window box picture framing412/09/2412/09/244.0h:
608-09-13-L 07          Install simple Base board molding1212/09/2412/10/2412.0h:
608-09-13-L 08          Install portlight panel412/11/2412/11/244.0h:
608-09-13-L 09          Cut in outlets/switches1212/11/2412/12/2412.0h:
608-09-13-L 10          Fab headboard panel812/13/2412/13/248.0h:
608-09-14      Panels - Wall6012/04/2412/13/2460.0h:
608-09-14-L        Labor6012/04/2412/13/241.5w:
608-09-14-L 01          Install simple perimeter crown molding1212/04/2412/05/2412.0h:
608-09-14-L 02          Install AC grill finish panel412/06/2412/06/244.0h:
608-09-14-L 03          Fabricate ceiling panels4012/06/2412/13/2440.0h:
608-09-14-L 04          Install perimeter AC soffit412/13/2412/13/244.0h:
608-09-15      Panels - Headboard6012/04/2412/13/2460.0h:
608-09-15-L        Labor6012/04/2412/13/241.5w:
608-09-15-L 01          Install simple perimeter crown molding1212/04/2412/05/2412.0h:
608-09-15-L 02          Install AC grill finish panel412/06/2412/06/244.0h:
608-09-15-L 03          Fabricate ceiling panels4012/06/2412/13/2440.0h:
608-09-15-L 04          Install perimeter AC soffit412/13/2412/13/244.0h:
608-09-16      Moulding - Ceiling3612/09/2412/13/2436.0h:
608-09-16-L        Labor3612/09/2412/13/240.9w:
608-09-16-L 01          Install finish paneling2412/09/2412/12/2424.0h:
608-09-16-L 02          Install lower cabinet frame412/12/2412/12/244.0h:
608-09-16-L 03          Install lower cabinet trim/counter top412/13/2412/13/244.0h:
608-09-16-L 04          Install lower cabinet shelves412/13/2412/13/244.0h:
608-09-17      Moulding - Crown3612/09/2412/13/2436.0h:
608-09-17-L        Labor3612/09/2412/13/240.9w:
608-09-17-L 01          Install finish paneling2412/09/2412/12/2424.0h:
608-09-17-L 02          Install lower cabinet frame412/12/2412/12/244.0h:
608-09-17-L 03          Install lower cabinet trim/counter top412/13/2412/13/244.0h:
608-09-17-L 04          Install lower cabinet shelves412/13/2412/13/244.0h:
608-09-18      Moulding - Baseboard3612/09/2412/13/2436.0h:
608-09-18-L        Labor3612/09/2412/13/240.9w:
608-09-18-L 01          Install finish paneling2412/09/2412/12/2424.0h:
608-09-18-L 02          Install lower cabinet frame412/12/2412/12/244.0h:
608-09-18-L 03          Install lower cabinet trim/counter top412/13/2412/13/244.0h:
608-09-18-L 04          Install lower cabinet shelves412/13/2412/13/244.0h:
608-09-19      Entry Doors4812/06/2412/13/2448.0h:
608-09-19-L        Labor4812/06/2412/13/241.2w:
608-09-19-L 01          Prep door opening to receive door jabs1212/06/2412/09/2412.0h:
608-09-19-L 02          Install entry door casing and Jabs (3)2412/09/2412/12/2424.0h:
608-09-19-L 03          Install entry doors (3)1212/12/2412/13/2412.0h:
608-09-20      Trim1012/12/2412/13/2410.0h:
608-09-20-L        Labor1012/12/2412/13/240.3w:
608-09-20-L 01          Install upholstered bed trim412/12/2412/13/244.0h:
608-09-20-L 02          Install finished ceiling panels612/13/2412/13/246.0h:
609  Guest Bathroom 418612/02/2412/13/242.4w:
609-09    Carpentry18612/02/2412/13/241.9w:
609-09-01      Room Framing7612/02/2412/13/2476.0h:
609-09-01-L        Labor7612/02/2412/13/241.9w:
609-09-01-L 01          Install cabin side paneling2412/02/2412/05/2424.0h:
609-09-01-L 02          Frame shower enclousre1212/05/2412/06/2412.0h:
609-09-01-L 03          Install shower sub-floor812/09/2412/09/248.0h:
609-09-01-L 04          Fabricate shower overhead panel812/10/2412/10/248.0h:
609-09-01-L 05          West system shower enclosure812/11/2412/11/248.0h:
609-09-01-L 06          Install overhead framing812/12/2412/12/248.0h:
609-09-01-L 07          Cut pipe/electric accesses412/13/2412/13/244.0h:
609-09-01-L 08          Rough AC ducting from stateroom412/13/2412/13/244.0h:
609-09-02      Sink Vanity Cabinet1812/11/2412/13/2418.0h:
609-09-02-L        Labor1812/11/2412/13/240.5w:
609-09-02-L 01          Install toe kick412/11/2412/12/244.0h:
609-09-02-L 02          Install base frame412/12/2412/12/244.0h:
609-09-02-L 03          Install side filler pieces212/12/2412/12/242.0h:
609-09-02-L 04          Install finish panels/door412/13/2412/13/244.0h:
609-09-02-L 05          Install shelf212/13/2412/13/242.0h:
609-09-02-L 06          Install sub-countertop for stone212/13/2412/13/242.0h:
609-09-03      Medicine Cabinet1212/12/2412/13/2412.0h:
609-09-03-L        Labor1212/12/2412/13/240.3w:
609-09-03-L 01          Install base frame212/12/2412/12/242.0h:
609-09-03-L 02          Install verical light recesses212/12/2412/12/242.0h:
609-09-03-L 03          Install side filler pieces212/13/2412/13/242.0h:
609-09-03-L 04          Install doors 412/13/2412/13/244.0h:
609-09-03-L 05          Install shelves212/13/2412/13/242.0h:
609-09-04      Walls2412/11/2412/13/2424.0h:
609-09-04-L        Labor2412/11/2412/13/240.6w:
609-09-04-L 01          Install Ship side finish wood panel412/11/2412/11/244.0h:
609-09-04-L 02          Install fwd finish wood panel412/11/2412/11/244.0h:
609-09-04-L 03          Install fwd finish wood panel molding412/12/2412/12/244.0h:
609-09-04-L 04          Install base board412/12/2412/12/244.0h:
609-09-04-L 05          Prep walls for wall coverings412/13/2412/13/244.0h:
609-09-04-L 06          Cut in outlets/switches412/13/2412/13/244.0h:
609-09-05      Ceiling2812/10/2412/13/2428.0h:
609-09-05-L        Labor2812/10/2412/13/240.7w:
609-09-05-L 01          Install simple perimeter crown molding412/10/2412/10/244.0h:
609-09-05-L 02          Install AC grill finish panel412/11/2412/11/244.0h:
609-09-05-L 03          Install perimeter AC soffit412/11/2412/11/244.0h:
609-09-05-L 04          Fab overhead panels1612/12/2412/13/2416.0h:
609-09-06      Flooring1212/12/2412/13/2412.0h:
609-09-06-L        Labor1212/12/2412/13/240.3w:
609-09-06-L 01          Prep flooring for stonework1212/12/2412/13/2412.0h:
609-09-07      Finish Trims1612/12/2412/13/2416.0h:
609-09-07-L        Labor1612/12/2412/13/240.4w:
609-09-07-L 01          Install overhead panels812/12/2412/12/248.0h:
609-09-07-L 02          Install bathroom accessories812/13/2412/13/248.0h:
615  Lower Guest Foyer - STBD14812/05/2412/13/241.3w:
615-09    Carpentry14812/05/2412/13/2452.0h:
615-09-01      Room Framing5212/05/2412/13/2452.0h:
615-09-01-L        Labor5212/05/2412/13/241.3w:
615-09-01-L 01          Install shipside framing812/05/2412/06/248.0h:
615-09-01-L 02          Install portlight framing412/06/2412/06/244.0h:
615-09-01-L 03          Frame closet sides1612/09/2412/10/2416.0h:
615-09-01-L 04          Frame stairway walls812/11/2412/11/248.0h:
615-09-01-L 05          Install stariway steps412/12/2412/12/244.0h:
615-09-01-L 06          Install ceiling head box412/12/2412/12/244.0h:
615-09-01-L 07          Install ceiling box framing412/13/2412/13/244.0h:
615-09-01-L 08          Rough in window box412/13/2412/13/244.0h:
615-09-02      Ship side Cabinet (S)2412/11/2412/13/2424.0h:
615-09-02-L        Labor2412/11/2412/13/240.6w:
615-09-02-L 01          Install toe kick412/11/2412/11/244.0h:
615-09-02-L 02          Install toe kick molding412/11/2412/11/244.0h:
615-09-02-L 03          Install base frame cabinets412/12/2412/12/244.0h:
615-09-02-L 04          Install finish panels412/12/2412/12/244.0h:
615-09-02-L 05          Install cabinet doors412/13/2412/13/244.0h:
615-09-02-L 06          Install countertop212/13/2412/13/242.0h:
615-09-02-L 07          Install countertop edge molding212/13/2412/13/242.0h:
615-09-03      Wall4412/06/2412/13/2444.0h:
615-09-03-L        Labor4412/06/2412/13/241.1w:
615-09-03-L 01          Install wood panels2412/06/2412/11/2424.0h:
615-09-03-L 02          Install column at stairway812/11/2412/12/248.0h:
615-09-03-L 03          Install simple base board molding812/12/2412/13/248.0h:
615-09-03-L 04          Cut in outlets/switches412/13/2412/13/244.0h:
615-09-04      Ceiling2412/11/2412/13/2424.0h:
615-09-04-L        Labor2412/11/2412/13/240.6w:
615-09-04-L 01          Install simple perimeter crown molding812/11/2412/11/248.0h:
615-09-04-L 02          Fab overhead panels1612/12/2412/13/2416.0h:
615-09-05      Finish Trims412/13/2412/13/244.0h:
615-09-05-L        Labor412/13/2412/13/240.1w:
615-09-05-L 01          Install overhead panels412/13/2412/13/244.0h:
619  LOWER CREW FRAMING52011/26/2412/13/244.2w:
619-09    Carpentry52011/26/2412/13/242.7w:
619-09-01      Joiner Floor24011/27/2412/13/24100.0h:
619-09-01-L        Labor24011/28/2412/13/242.4w:
619-09-01-L 01          Cut floor panels2412/03/2412/05/2424.0h:
619-09-01-L 02          Fabricate sound damping foundation strips7211/28/2412/02/2424.0h:
619-09-01-L 03          Install floor panels foundation strips7212/06/2412/10/2424.0h:
619-09-01-L 04          Install sub-floor panels7212/11/2412/13/2424.0h:
619-09-02      Bulkheads/Cabins28011/26/2412/13/24108.0h:
619-09-02-L        Labor28011/26/2412/13/242.7w:
619-09-02-L 01          Cut all shipside and inner wall panels4012/09/2412/13/2440.0h:
619-09-02-L 02          Cut all AC and window boxes4011/26/2412/03/2440.0h:
619-09-02-L 03          Assemble all shipside and inner wall panels4812/03/2412/06/2424.0h:
619-09-02-L 04          Assemble all AC and window boxes2412/06/2412/09/2412.0h:
619-09-02-L 05          Dry-fit all shipside and inner wall panels onboard3212/10/2412/11/2416.0h:
619-09-02-L 06          Dry-fit all AC and window boxes onboard3212/12/2412/13/2416.0h:
619-09-02-L 07          Install all shipside and inner wall panels onboard3212/10/2412/11/2416.0h:
619-09-02-L 08          Install all AC and window boxes onboard3212/12/2412/13/2416.0h:
620  Captain's cabin 143511/25/2412/13/242.9w:
620-09    Carpentry43511/25/2412/13/242.9w:
620-09-01      Room Framing11611/25/2412/13/24116.0h:
620-09-01-L        Labor11611/25/2412/13/242.9w:
620-09-01-L 01          Install shipside framing3211/25/2411/29/2432.0h:
620-09-01-L 02          Install portlight framing2411/29/2412/04/2424.0h:
620-09-01-L 03          Frame closet sides1612/04/2412/06/2416.0h:
620-09-01-L 04          Install overhead framing2412/06/2412/11/2424.0h:
620-09-01-L 05          Rough in window box1212/11/2412/12/2412.0h:
620-09-01-L 06          Provide accesses to pipes/wiring812/13/2412/13/248.0h:
620-09-02      AC Plenum6012/04/2412/13/2460.0h:
620-09-02-L        Labor6012/04/2412/13/241.5w:
620-09-02-L 01          Fabricate AC plenum3212/04/2412/10/2432.0h:
620-09-02-L 02          Install AC plenum1212/10/2412/11/2412.0h:
620-09-02-L 03          Rough in AC ducting1212/12/2412/13/2412.0h:
620-09-02-L 04          Connect AC ducting412/13/2412/13/244.0h:
620-09-03      Bed1412/12/2412/13/2414.0h:
620-09-03-L        Labor1412/12/2412/13/240.4w:
620-09-03-L 01          Install toe kick412/12/2412/12/244.0h:
620-09-03-L 02          Install base frame212/12/2412/12/242.0h:
620-09-03-L 03          Install side/foot rails412/13/2412/13/244.0h:
620-09-03-L 04          Install upper rail412/13/2412/13/244.0h:
620-09-04      Nightstand1312/12/2412/13/2413.0h:
620-09-04-L        Labor1312/12/2412/13/240.3w:
620-09-04-L 01          Install toe kick212/12/2412/12/242.0h:
620-09-04-L 02          Install base frame212/12/2412/12/242.0h:
620-09-04-L 03          Fabricate upper rail/Countertop212/12/2412/13/242.0h:
620-09-04-L 04          Install filler piece to bed212/13/2412/13/242.0h:
620-09-04-L 05          Install panels/door412/13/2412/13/244.0h:
620-09-04-L 06          Install shelf112/13/2412/13/241.0h:
620-09-05      Wall7812/02/2412/13/2478.0h:
620-09-05-L        Labor7812/02/2412/13/242.0w:
620-09-05-L 01          Install finish walls boxes at FWD nightstand412/02/2412/02/244.0h:
620-09-05-L 02          Install finish walls boxes at AFT nightstand412/02/2412/03/244.0h:
620-09-05-L 03          Clean and prep walls for wall covering1212/03/2412/04/2412.0h:
620-09-05-L 04          Install finish window box panels (sides/top/bottom)1212/04/2412/06/2412.0h:
620-09-05-L 05          Install finish window box pilasters612/06/2412/06/246.0h:
620-09-05-L 06          Install finish window box picture framing412/09/2412/09/244.0h:
620-09-05-L 07          Install simple Base board molding1212/09/2412/10/2412.0h:
620-09-05-L 08          Install portlight panel412/11/2412/11/244.0h:
620-09-05-L 09          Cut in outlets/switches1212/11/2412/12/2412.0h:
620-09-05-L 10          Fab headboard panel812/13/2412/13/248.0h:
620-09-06      Ceiling6012/04/2412/13/2460.0h:
620-09-06-L        Labor6012/04/2412/13/241.5w:
620-09-06-L 01          Install simple perimeter crown molding1212/04/2412/05/2412.0h:
620-09-06-L 02          Install AC grill finish panel412/06/2412/06/244.0h:
620-09-06-L 03          Fabricate ceiling panels4012/06/2412/13/2440.0h:
620-09-06-L 04          Install perimeter AC soffit412/13/2412/13/244.0h:
620-09-07      Doors4812/06/2412/13/2448.0h:
620-09-07-L        Labor4812/06/2412/13/241.2w:
620-09-07-L 01          Prep door opening to receive door jabs1212/06/2412/09/2412.0h:
620-09-07-L 02          Install entry door casing and Jabs (3)2412/09/2412/12/2424.0h:
620-09-07-L 03          Install entry doors (3)1212/12/2412/13/2412.0h:
620-09-08      Closet3612/09/2412/13/2436.0h:
620-09-08-L        Labor3612/09/2412/13/240.9w:
620-09-08-L 01          Install finish paneling2412/09/2412/12/2424.0h:
620-09-08-L 02          Install lower cabinet frame412/12/2412/12/244.0h:
620-09-08-L 03          Install lower cabinet trim/counter top412/13/2412/13/244.0h:
620-09-08-L 04          Install lower cabinet shelves412/13/2412/13/244.0h:
620-09-09      Trim1012/12/2412/13/2410.0h:
620-09-09-L        Labor1012/12/2412/13/240.3w:
620-09-09-L 01          Install upholstered bed trim412/12/2412/13/244.0h:
620-09-09-L 02          Install finished ceiling panels612/13/2412/13/246.0h:
621  Captain's Bathroom18612/02/2412/13/241.9w:
621-09    Carpentry18612/02/2412/13/241.9w:
621-09-01      Room Framing7612/02/2412/13/2476.0h:
621-09-01-L        Labor7612/02/2412/13/241.9w:
621-09-01-L 01          Install cabin side paneling2412/02/2412/05/2424.0h:
621-09-01-L 02          Frame shower enclousre1212/05/2412/06/2412.0h:
621-09-01-L 03          Install shower sub-floor812/09/2412/09/248.0h:
621-09-01-L 04          Fabricate shower overhead panel812/10/2412/10/248.0h:
621-09-01-L 05          West system shower enclosure812/11/2412/11/248.0h:
621-09-01-L 06          Install overhead framing812/12/2412/12/248.0h:
621-09-01-L 07          Cut pipe/electric accesses412/13/2412/13/244.0h:
621-09-01-L 08          Rough AC ducting from stateroom412/13/2412/13/244.0h:
621-09-02      Sink Vanity Cabinet1812/11/2412/13/2418.0h:
621-09-02-L        Labor1812/11/2412/13/240.5w:
621-09-02-L 01          Install toe kick412/11/2412/12/244.0h:
621-09-02-L 02          Install base frame412/12/2412/12/244.0h:
621-09-02-L 03          Install side filler pieces212/12/2412/12/242.0h:
621-09-02-L 04          Install finish panels/door412/13/2412/13/244.0h:
621-09-02-L 05          Install shelf212/13/2412/13/242.0h:
621-09-02-L 06          Install sub-countertop for stone212/13/2412/13/242.0h:
621-09-03      Medicine Cabinet1212/12/2412/13/2412.0h:
621-09-03-L        Labor1212/12/2412/13/240.3w:
621-09-03-L 01          Install base frame212/12/2412/12/242.0h:
621-09-03-L 02          Install verical light recesses212/12/2412/12/242.0h:
621-09-03-L 03          Install side filler pieces212/13/2412/13/242.0h:
621-09-03-L 04          Install doors 412/13/2412/13/244.0h:
621-09-03-L 05          Install shelves212/13/2412/13/242.0h:
621-09-04      Walls2412/11/2412/13/2424.0h:
621-09-04-L        Labor2412/11/2412/13/240.6w:
621-09-04-L 01          Install Ship side finish wood panel412/11/2412/11/244.0h:
621-09-04-L 02          Install fwd finish wood panel412/11/2412/11/244.0h:
621-09-04-L 03          Install fwd finish wood panel molding412/12/2412/12/244.0h:
621-09-04-L 04          Install base board412/12/2412/12/244.0h:
621-09-04-L 05          Prep walls for wall coverings412/13/2412/13/244.0h:
621-09-04-L 06          Cut in outlets/switches412/13/2412/13/244.0h:
621-09-05      Ceiling2812/10/2412/13/2428.0h:
621-09-05-L        Labor2812/10/2412/13/240.7w:
621-09-05-L 01          Install simple perimeter crown molding412/10/2412/10/244.0h:
621-09-05-L 02          Install AC grill finish panel412/11/2412/11/244.0h:
621-09-05-L 03          Install perimeter AC soffit412/11/2412/11/244.0h:
621-09-05-L 04          Fab overhead panels1612/12/2412/13/2416.0h:
621-09-06      Flooring1212/12/2412/13/2412.0h:
621-09-06-L        Labor1212/12/2412/13/240.3w:
621-09-06-L 01          Prep flooring for stonework1212/12/2412/13/2412.0h:
621-09-07      Finish Trims1612/12/2412/13/2416.0h:
621-09-07-L        Labor1612/12/2412/13/240.4w:
621-09-07-L 01          Install overhead panels812/12/2412/12/248.0h:
621-09-07-L 02          Install bathroom accessories812/13/2412/13/248.0h:
622  Crew cabin 143511/25/2412/13/242.9w:
622-09    Carpentry43511/25/2412/13/242.9w:
622-09-01      Room Framing11611/25/2412/13/24116.0h:
622-09-01-L        Labor11611/25/2412/13/242.9w:
622-09-01-L 01          Install shipside framing3211/25/2411/29/2432.0h:
622-09-01-L 02          Install portlight framing2411/29/2412/04/2424.0h:
622-09-01-L 03          Frame closet sides1612/04/2412/06/2416.0h:
622-09-01-L 04          Install overhead framing2412/06/2412/11/2424.0h:
622-09-01-L 05          Rough in window box1212/11/2412/12/2412.0h:
622-09-01-L 06          Provide accesses to pipes/wiring812/13/2412/13/248.0h:
622-09-02      AC Plenum6012/04/2412/13/2460.0h:
622-09-02-L        Labor6012/04/2412/13/241.5w:
622-09-02-L 01          Fabricate AC plenum3212/04/2412/10/2432.0h:
622-09-02-L 02          Install AC plenum1212/10/2412/11/2412.0h:
622-09-02-L 03          Rough in AC ducting1212/12/2412/13/2412.0h:
622-09-02-L 04          Connect AC ducting412/13/2412/13/244.0h:
622-09-03      Bed1412/12/2412/13/2414.0h:
622-09-03-L        Labor1412/12/2412/13/240.4w:
622-09-03-L 01          Install toe kick412/12/2412/12/244.0h:
622-09-03-L 02          Install base frame212/12/2412/12/242.0h:
622-09-03-L 03          Install side/foot rails412/13/2412/13/244.0h:
622-09-03-L 04          Install upper rail412/13/2412/13/244.0h:
622-09-04      Nightstand1312/12/2412/13/2413.0h:
622-09-04-L        Labor1312/12/2412/13/240.3w:
622-09-04-L 01          Install toe kick212/12/2412/12/242.0h:
622-09-04-L 02          Install base frame212/12/2412/12/242.0h:
622-09-04-L 03          Fabricate upper rail/Countertop212/12/2412/13/242.0h:
622-09-04-L 04          Install filler piece to bed212/13/2412/13/242.0h:
622-09-04-L 05          Install panels/door412/13/2412/13/244.0h:
622-09-04-L 06          Install shelf112/13/2412/13/241.0h:
622-09-05      Wall7812/02/2412/13/2478.0h:
622-09-05-L        Labor7812/02/2412/13/242.0w:
622-09-05-L 01          Install finish walls boxes at FWD nightstand412/02/2412/02/244.0h:
622-09-05-L 02          Install finish walls boxes at AFT nightstand412/02/2412/03/244.0h:
622-09-05-L 03          Clean and prep walls for wall covering1212/03/2412/04/2412.0h:
622-09-05-L 04          Install finish window box panels (sides/top/bottom)1212/04/2412/06/2412.0h:
622-09-05-L 05          Install finish window box pilasters612/06/2412/06/246.0h:
622-09-05-L 06          Install finish window box picture framing412/09/2412/09/244.0h:
622-09-05-L 07          Install simple Base board molding1212/09/2412/10/2412.0h:
622-09-05-L 08          Install portlight panel412/11/2412/11/244.0h:
622-09-05-L 09          Cut in outlets/switches1212/11/2412/12/2412.0h:
622-09-05-L 10          Fab headboard panel812/13/2412/13/248.0h:
622-09-06      Ceiling6012/04/2412/13/2460.0h:
622-09-06-L        Labor6012/04/2412/13/241.5w:
622-09-06-L 01          Install simple perimeter crown molding1212/04/2412/05/2412.0h:
622-09-06-L 02          Install AC grill finish panel412/06/2412/06/244.0h:
622-09-06-L 03          Fabricate ceiling panels4012/06/2412/13/2440.0h:
622-09-06-L 04          Install perimeter AC soffit412/13/2412/13/244.0h:
622-09-07      Doors4812/06/2412/13/2448.0h:
622-09-07-L        Labor4812/06/2412/13/241.2w:
622-09-07-L 01          Prep door opening to receive door jabs1212/06/2412/09/2412.0h:
622-09-07-L 02          Install entry door casing and Jabs (3)2412/09/2412/12/2424.0h:
622-09-07-L 03          Install entry doors (3)1212/12/2412/13/2412.0h:
622-09-08      Closet3612/09/2412/13/2436.0h:
622-09-08-L        Labor3612/09/2412/13/240.9w:
622-09-08-L 01          Install finish paneling2412/09/2412/12/2424.0h:
622-09-08-L 02          Install lower cabinet frame412/12/2412/12/244.0h:
622-09-08-L 03          Install lower cabinet trim/counter top412/13/2412/13/244.0h:
622-09-08-L 04          Install lower cabinet shelves412/13/2412/13/244.0h:
622-09-09      Trim1012/12/2412/13/2410.0h:
622-09-09-L        Labor1012/12/2412/13/240.3w:
622-09-09-L 01          Install upholstered bed trim412/12/2412/13/244.0h:
622-09-09-L 02          Install finished ceiling panels612/13/2412/13/246.0h:
623  Crew Bathroom 18612/02/2412/13/241.9w:
623-09    Carpentry18612/02/2412/13/241.9w:
623-09-01      Room Framing7612/02/2412/13/2476.0h:
623-09-01-L        Labor7612/02/2412/13/241.9w:
623-09-01-L 01          Install cabin side paneling2412/02/2412/05/2424.0h:
623-09-01-L 02          Frame shower enclousre1212/05/2412/06/2412.0h:
623-09-01-L 03          Install shower sub-floor812/09/2412/09/248.0h:
623-09-01-L 04          Fabricate shower overhead panel812/10/2412/10/248.0h:
623-09-01-L 05          West system shower enclosure812/11/2412/11/248.0h:
623-09-01-L 06          Install overhead framing812/12/2412/12/248.0h:
623-09-01-L 07          Cut pipe/electric accesses412/13/2412/13/244.0h:
623-09-01-L 08          Rough AC ducting from stateroom412/13/2412/13/244.0h:
623-09-02      Sink Vanity Cabinet1812/11/2412/13/2418.0h:
623-09-02-L        Labor1812/11/2412/13/240.5w:
623-09-02-L 01          Install toe kick412/11/2412/12/244.0h:
623-09-02-L 02          Install base frame412/12/2412/12/244.0h:
623-09-02-L 03          Install side filler pieces212/12/2412/12/242.0h:
623-09-02-L 04          Install finish panels/door412/13/2412/13/244.0h:
623-09-02-L 05          Install shelf212/13/2412/13/242.0h:
623-09-02-L 06          Install sub-countertop for stone212/13/2412/13/242.0h:
623-09-03      Medicine Cabinet1212/12/2412/13/2412.0h:
623-09-03-L        Labor1212/12/2412/13/240.3w:
623-09-03-L 01          Install base frame212/12/2412/12/242.0h:
623-09-03-L 02          Install verical light recesses212/12/2412/12/242.0h:
623-09-03-L 03          Install side filler pieces212/13/2412/13/242.0h:
623-09-03-L 04          Install doors 412/13/2412/13/244.0h:
623-09-03-L 05          Install shelves212/13/2412/13/242.0h:
623-09-04      Walls2412/11/2412/13/2424.0h:
623-09-04-L        Labor2412/11/2412/13/240.6w:
623-09-04-L 01          Install Ship side finish wood panel412/11/2412/11/244.0h:
623-09-04-L 02          Install fwd finish wood panel412/11/2412/11/244.0h:
623-09-04-L 03          Install fwd finish wood panel molding412/12/2412/12/244.0h:
623-09-04-L 04          Install base board412/12/2412/12/244.0h:
623-09-04-L 05          Prep walls for wall coverings412/13/2412/13/244.0h:
623-09-04-L 06          Cut in outlets/switches412/13/2412/13/244.0h:
623-09-05      Ceiling2812/10/2412/13/2428.0h:
623-09-05-L        Labor2812/10/2412/13/240.7w:
623-09-05-L 01          Install simple perimeter crown molding412/10/2412/10/244.0h:
623-09-05-L 02          Install AC grill finish panel412/11/2412/11/244.0h:
623-09-05-L 03          Install perimeter AC soffit412/11/2412/11/244.0h:
623-09-05-L 04          Fab overhead panels1612/12/2412/13/2416.0h:
623-09-06      Flooring1212/12/2412/13/2412.0h:
623-09-06-L        Labor1212/12/2412/13/240.3w:
623-09-06-L 01          Prep flooring for stonework1212/12/2412/13/2412.0h:
623-09-07      Finish Trims1612/12/2412/13/2416.0h:
623-09-07-L        Labor1612/12/2412/13/240.4w:
623-09-07-L 01          Install overhead panels812/12/2412/12/248.0h:
623-09-07-L 02          Install bathroom accessories812/13/2412/13/248.0h:
624  Crew cabin 243511/25/2412/13/242.9w:
624-09    Carpentry43511/25/2412/13/242.9w:
624-09-01      Room Framing11611/25/2412/13/24116.0h:
624-09-01-L        Labor11611/25/2412/13/242.9w:
624-09-01-L 01          Install shipside framing3211/25/2411/29/2432.0h:
624-09-01-L 02          Install portlight framing2411/29/2412/04/2424.0h:
624-09-01-L 03          Frame closet sides1612/04/2412/06/2416.0h:
624-09-01-L 04          Install overhead framing2412/06/2412/11/2424.0h:
624-09-01-L 05          Rough in window box1212/11/2412/12/2412.0h:
624-09-01-L 06          Provide accesses to pipes/wiring812/13/2412/13/248.0h:
624-09-02      AC Plenum6012/04/2412/13/2460.0h:
624-09-02-L        Labor6012/04/2412/13/241.5w:
624-09-02-L 01          Fabricate AC plenum3212/04/2412/10/2432.0h:
624-09-02-L 02          Install AC plenum1212/10/2412/11/2412.0h:
624-09-02-L 03          Rough in AC ducting1212/12/2412/13/2412.0h:
624-09-02-L 04          Connect AC ducting412/13/2412/13/244.0h:
624-09-03      Bed1412/12/2412/13/2414.0h:
624-09-03-L        Labor1412/12/2412/13/240.4w:
624-09-03-L 01          Install toe kick412/12/2412/12/244.0h:
624-09-03-L 02          Install base frame212/12/2412/12/242.0h:
624-09-03-L 03          Install side/foot rails412/13/2412/13/244.0h:
624-09-03-L 04          Install upper rail412/13/2412/13/244.0h:
624-09-04      Nightstand1312/12/2412/13/2413.0h:
624-09-04-L        Labor1312/12/2412/13/240.3w:
624-09-04-L 01          Install toe kick212/12/2412/12/242.0h:
624-09-04-L 02          Install base frame212/12/2412/12/242.0h:
624-09-04-L 03          Fabricate upper rail/Countertop212/12/2412/13/242.0h:
624-09-04-L 04          Install filler piece to bed212/13/2412/13/242.0h:
624-09-04-L 05          Install panels/door412/13/2412/13/244.0h:
624-09-04-L 06          Install shelf112/13/2412/13/241.0h:
624-09-05      Wall7812/02/2412/13/2478.0h:
624-09-05-L        Labor7812/02/2412/13/242.0w:
624-09-05-L 01          Install finish walls boxes at FWD nightstand412/02/2412/02/244.0h:
624-09-05-L 02          Install finish walls boxes at AFT nightstand412/02/2412/03/244.0h:
624-09-05-L 03          Clean and prep walls for wall covering1212/03/2412/04/2412.0h:
624-09-05-L 04          Install finish window box panels (sides/top/bottom)1212/04/2412/06/2412.0h:
624-09-05-L 05          Install finish window box pilasters612/06/2412/06/246.0h:
624-09-05-L 06          Install finish window box picture framing412/09/2412/09/244.0h:
624-09-05-L 07          Install simple Base board molding1212/09/2412/10/2412.0h:
624-09-05-L 08          Install portlight panel412/11/2412/11/244.0h:
624-09-05-L 09          Cut in outlets/switches1212/11/2412/12/2412.0h:
624-09-05-L 10          Fab headboard panel812/13/2412/13/248.0h:
624-09-06      Ceiling6012/04/2412/13/2460.0h:
624-09-06-L        Labor6012/04/2412/13/241.5w:
624-09-06-L 01          Install simple perimeter crown molding1212/04/2412/05/2412.0h:
624-09-06-L 02          Install AC grill finish panel412/06/2412/06/244.0h:
624-09-06-L 03          Fabricate ceiling panels4012/06/2412/13/2440.0h:
624-09-06-L 04          Install perimeter AC soffit412/13/2412/13/244.0h:
624-09-07      Doors4812/06/2412/13/2448.0h:
624-09-07-L        Labor4812/06/2412/13/241.2w:
624-09-07-L 01          Prep door opening to receive door jabs1212/06/2412/09/2412.0h:
624-09-07-L 02          Install entry door casing and Jabs (3)2412/09/2412/12/2424.0h:
624-09-07-L 03          Install entry doors (3)1212/12/2412/13/2412.0h:
624-09-08      Closet3612/09/2412/13/2436.0h:
624-09-08-L        Labor3612/09/2412/13/240.9w:
624-09-08-L 01          Install finish paneling2412/09/2412/12/2424.0h:
624-09-08-L 02          Install lower cabinet frame412/12/2412/12/244.0h:
624-09-08-L 03          Install lower cabinet trim/counter top412/13/2412/13/244.0h:
624-09-08-L 04          Install lower cabinet shelves412/13/2412/13/244.0h:
624-09-09      Trim1012/12/2412/13/2410.0h:
624-09-09-L        Labor1012/12/2412/13/240.3w:
624-09-09-L 01          Install upholstered bed trim412/12/2412/13/244.0h:
624-09-09-L 02          Install finished ceiling panels612/13/2412/13/246.0h:
625  Crew Bathroom 218612/02/2412/13/241.9w:
625-09    Carpentry18612/02/2412/13/241.9w:
625-09-01      Room Framing7612/02/2412/13/2476.0h:
625-09-01-L        Labor7612/02/2412/13/241.9w:
625-09-01-L 01          Install cabin side paneling2412/02/2412/05/2424.0h:
625-09-01-L 02          Frame shower enclousre1212/05/2412/06/2412.0h:
625-09-01-L 03          Install shower sub-floor812/09/2412/09/248.0h:
625-09-01-L 04          Fabricate shower overhead panel812/10/2412/10/248.0h:
625-09-01-L 05          West system shower enclosure812/11/2412/11/248.0h:
625-09-01-L 06          Install overhead framing812/12/2412/12/248.0h:
625-09-01-L 07          Cut pipe/electric accesses412/13/2412/13/244.0h:
625-09-01-L 08          Rough AC ducting from stateroom412/13/2412/13/244.0h:
625-09-02      Sink Vanity Cabinet1812/11/2412/13/2418.0h:
625-09-02-L        Labor1812/11/2412/13/240.5w:
625-09-02-L 01          Install toe kick412/11/2412/12/244.0h:
625-09-02-L 02          Install base frame412/12/2412/12/244.0h:
625-09-02-L 03          Install side filler pieces212/12/2412/12/242.0h:
625-09-02-L 04          Install finish panels/door412/13/2412/13/244.0h:
625-09-02-L 05          Install shelf212/13/2412/13/242.0h:
625-09-02-L 06          Install sub-countertop for stone212/13/2412/13/242.0h:
625-09-03      Medicine Cabinet1212/12/2412/13/2412.0h:
625-09-03-L        Labor1212/12/2412/13/240.3w:
625-09-03-L 01          Install base frame212/12/2412/12/242.0h:
625-09-03-L 02          Install verical light recesses212/12/2412/12/242.0h:
625-09-03-L 03          Install side filler pieces212/13/2412/13/242.0h:
625-09-03-L 04          Install doors 412/13/2412/13/244.0h:
625-09-03-L 05          Install shelves212/13/2412/13/242.0h:
625-09-04      Walls2412/11/2412/13/2424.0h:
625-09-04-L        Labor2412/11/2412/13/240.6w:
625-09-04-L 01          Install Ship side finish wood panel412/11/2412/11/244.0h:
625-09-04-L 02          Install fwd finish wood panel412/11/2412/11/244.0h:
625-09-04-L 03          Install fwd finish wood panel molding412/12/2412/12/244.0h:
625-09-04-L 04          Install base board412/12/2412/12/244.0h:
625-09-04-L 05          Prep walls for wall coverings412/13/2412/13/244.0h:
625-09-04-L 06          Cut in outlets/switches412/13/2412/13/244.0h:
625-09-05      Ceiling2812/10/2412/13/2428.0h:
625-09-05-L        Labor2812/10/2412/13/240.7w:
625-09-05-L 01          Install simple perimeter crown molding412/10/2412/10/244.0h:
625-09-05-L 02          Install AC grill finish panel412/11/2412/11/244.0h:
625-09-05-L 03          Install perimeter AC soffit412/11/2412/11/244.0h:
625-09-05-L 04          Fab overhead panels1612/12/2412/13/2416.0h:
625-09-06      Flooring1212/12/2412/13/2412.0h:
625-09-06-L        Labor1212/12/2412/13/240.3w:
625-09-06-L 01          Prep flooring for stonework1212/12/2412/13/2412.0h:
625-09-07      Finish Trims1612/12/2412/13/2416.0h:
625-09-07-L        Labor1612/12/2412/13/240.4w:
625-09-07-L 01          Install overhead panels812/12/2412/12/248.0h:
625-09-07-L 02          Install bathroom accessories812/13/2412/13/248.0h:
635  Laundry14812/05/2412/13/241.3w:
635-09    Carpentry14812/05/2412/13/2452.0h:
635-09-01      Room Framing5212/05/2412/13/2452.0h:
635-09-01-L        Labor5212/05/2412/13/241.3w:
635-09-01-L 01          Install shipside framing812/05/2412/06/248.0h:
635-09-01-L 02          Install portlight framing412/06/2412/06/244.0h:
635-09-01-L 03          Frame closet sides1612/09/2412/10/2416.0h:
635-09-01-L 04          Frame stairway walls812/11/2412/11/248.0h:
635-09-01-L 05          Install stariway steps412/12/2412/12/244.0h:
635-09-01-L 06          Install ceiling head box412/12/2412/12/244.0h:
635-09-01-L 07          Install ceiling box framing412/13/2412/13/244.0h:
635-09-01-L 08          Rough in window box412/13/2412/13/244.0h:
635-09-02      Ship side Cabinet (S)2412/11/2412/13/2424.0h:
635-09-02-L        Labor2412/11/2412/13/240.6w:
635-09-02-L 01          Install toe kick412/11/2412/11/244.0h:
635-09-02-L 02          Install toe kick molding412/11/2412/11/244.0h:
635-09-02-L 03          Install base frame cabinets412/12/2412/12/244.0h:
635-09-02-L 04          Install finish panels412/12/2412/12/244.0h:
635-09-02-L 05          Install cabinet doors412/13/2412/13/244.0h:
635-09-02-L 06          Install countertop212/13/2412/13/242.0h:
635-09-02-L 07          Install countertop edge molding212/13/2412/13/242.0h:
635-09-03      Wall4412/06/2412/13/2444.0h:
635-09-03-L        Labor4412/06/2412/13/241.1w:
635-09-03-L 01          Install wood panels2412/06/2412/11/2424.0h:
635-09-03-L 02          Install column at stairway812/11/2412/12/248.0h:
635-09-03-L 03          Install simple base board molding812/12/2412/13/248.0h:
635-09-03-L 04          Cut in outlets/switches412/13/2412/13/244.0h:
635-09-04      Ceiling2412/11/2412/13/2424.0h:
635-09-04-L        Labor2412/11/2412/13/240.6w:
635-09-04-L 01          Install simple perimeter crown molding812/11/2412/11/248.0h:
635-09-04-L 02          Fab overhead panels1612/12/2412/13/2416.0h:
635-09-05      Finish Trims412/13/2412/13/244.0h:
635-09-05-L        Labor412/13/2412/13/240.1w:
635-09-05-L 01          Install overhead panels412/13/2412/13/244.0h:
636  Crew Lounge area34412/02/2412/13/242.0w:
636-09    Carpentry34412/02/2412/13/242.0w:
636-09-01      Room Framing8012/02/2412/13/2480.0h:
636-09-01-L        Labor8012/02/2412/13/242.0w:
636-09-01-L 01          Install cabin side framing port2412/02/2412/04/2424.0h:
636-09-01-L 02          Install port window boxes1212/05/2412/06/2412.0h:
636-09-01-L 03          Install cabin side paneling port1212/06/2412/09/2412.0h:
636-09-01-L 04          Frame out for refrigerator 1212/10/2412/11/2412.0h:
636-09-01-L 05          Frame out stairway walls1212/11/2412/12/2412.0h:
636-09-01-L 06          Frame out stairway steps 812/13/2412/13/248.0h:
636-09-02      AC Plenums2412/11/2412/13/2424.0h:
636-09-02-L        Labor2412/11/2412/13/240.6w:
636-09-02-L 01          Fabricate AC plenum aft812/11/2412/11/248.0h:
636-09-02-L 02          Install AC plenum aft812/12/2412/12/248.0h:
636-09-02-L 03          Rough in AC ducting port412/13/2412/13/244.0h:
636-09-02-L 04          Connect AC ducting to plenum412/13/2412/13/244.0h:
636-09-03      Sink cabinet2812/10/2412/13/2428.0h:
636-09-03-L        Labor2812/10/2412/13/240.7w:
636-09-03-L 01          Install toe kick412/10/2412/10/244.0h:
636-09-03-L 02          Install base frame cabinets412/11/2412/11/244.0h:
636-09-03-L 03          Install finish panels412/11/2412/11/244.0h:
636-09-03-L 04          Install drawer front panels412/12/2412/12/244.0h:
636-09-03-L 05          Install door panels812/12/2412/13/248.0h:
636-09-03-L 06          Install sub-countertop for stone412/13/2412/13/244.0h:
636-09-04      Lower cabinet2012/11/2412/13/2420.0h:
636-09-04-L        Labor2012/11/2412/13/240.5w:
636-09-04-L 01          Install base frame cabinets412/11/2412/11/244.0h:
636-09-04-L 02          Install toe kick412/12/2412/12/244.0h:
636-09-04-L 03          Install finish panels412/12/2412/12/244.0h:
636-09-04-L 04          Install door panels412/13/2412/13/244.0h:
636-09-04-L 05          Install sub-countertop for stone412/13/2412/13/244.0h:
636-09-05      Upper Cabinet2012/11/2412/13/2420.0h:
636-09-05-L        Labor2012/11/2412/13/240.5w:
636-09-05-L 01          Install base frame412/11/2412/11/244.0h:
636-09-05-L 02          Install lower edge molding412/12/2412/12/244.0h:
636-09-05-L 03          Install shelfs412/12/2412/12/244.0h:
636-09-05-L 04          Install cabinets doors412/13/2412/13/244.0h:
636-09-05-L 05          Install Hardware412/13/2412/13/244.0h:
636-09-06      Pantry2412/11/2412/13/2424.0h:
636-09-06-L        Labor2412/11/2412/13/240.6w:
636-09-06-L 01          Install base frame812/11/2412/11/248.0h:
636-09-06-L 02          Install lower edge molding412/12/2412/12/244.0h:
636-09-06-L 03          Install shelfs412/12/2412/12/244.0h:
636-09-06-L 04          Install cabinets doors412/13/2412/13/244.0h:
636-09-06-L 05          Install Hardware412/13/2412/13/244.0h:
636-09-07      Wall8012/02/2412/13/2480.0h:
636-09-07-L        Labor8012/02/2412/13/242.0w:
636-09-07-L 01          Install fwd bhd storage cabinets1212/02/2412/03/2412.0h:
636-09-07-L 02          Install fwd bhd storage cabinets doors 412/03/2412/03/244.0h:
636-09-07-L 03          Install fwd bulkhead AC grills412/04/2412/04/244.0h:
636-09-07-L 04          Install fwd bulkhead wood panels1612/04/2412/06/2416.0h:
636-09-07-L 05          Install STB shipside wood panels2412/06/2412/11/2424.0h:
636-09-07-L 06          Cut in outlets/switches1212/11/2412/12/2412.0h:
636-09-07-L 07          Install simple Base board812/13/2412/13/248.0h:
636-09-08      Windows2012/11/2412/13/2420.0h:
636-09-08-L        Labor2012/11/2412/13/240.5w:
636-09-08-L 01          Install window boxes412/11/2412/11/244.0h:
636-09-08-L 02          Install window pilasters412/12/2412/12/244.0h:
636-09-08-L 03          Install window sill molding412/12/2412/12/244.0h:
636-09-08-L 04          Install window valances412/13/2412/13/244.0h:
636-09-08-L 05          Install window panel412/13/2412/13/244.0h:
636-09-09      Appliances1612/12/2412/13/2416.0h:
636-09-09-L        Labor1612/12/2412/13/240.4w:
636-09-09-L 01          Install dishwahers412/12/2412/12/244.0h:
636-09-09-L 02          Install double ovens412/12/2412/12/244.0h:
636-09-09-L 03          Install microwave412/13/2412/13/244.0h:
636-09-09-L 04          Install icemaker412/13/2412/13/244.0h:
636-09-10      Ceiling2412/02/2412/13/2475.0h:
636-09-10-L        Labor2412/11/2412/13/240.6w:
636-09-10-L 01          Fab overhead panels2412/11/2412/13/2424.0h:
636-09-11      Trim812/13/2412/13/248.0h:
636-09-11-L        Labor812/13/2412/13/240.2w:
636-09-11-L 01          Install overhead panels812/13/2412/13/248.0h:
640  MAIN DECK FRAMING86411/15/2412/13/244.2w:
640-09    Carpentry86411/15/2412/13/244.2w:
640-09-01      Joiner Floor40011/18/2412/13/24160.0h:
640-09-01-L        Labor40011/18/2412/13/244.0w:
640-09-01-L 01          Cut floor panels4011/25/2411/29/2440.0h:
640-09-01-L 02          Fabricate sound damping foundation strips12011/18/2411/22/2440.0h:
640-09-01-L 03          Install floor panels foundation strips12012/02/2412/06/2440.0h:
640-09-01-L 04          Install sub-floor panels12012/09/2412/13/2440.0h:
640-09-02      Bulkheads/Cabins46411/15/2412/13/24168.0h:
640-09-02-L        Labor46411/15/2412/13/244.2w:
640-09-02-L 01          Cut all shipside and inner wall panels4012/09/2412/13/2440.0h:
640-09-02-L 02          Cut all AC and window boxes4011/15/2411/21/2440.0h:
640-09-02-L 03          Assemble all shipside and inner wall panels6411/22/2411/27/2432.0h:
640-09-02-L 04          Assemble all AC and window boxes6411/28/2412/03/2432.0h:
640-09-02-L 05          Dry-fit all shipside and inner wall panels onboard6412/04/2412/09/2432.0h:
640-09-02-L 06          Dry-fit all AC and window boxes onboard6412/10/2412/13/2432.0h:
640-09-02-L 07          Install all shipside and inner wall panels onboard6412/04/2412/09/2432.0h:
640-09-02-L 08          Install all AC and window boxes onboard6412/10/2412/13/2432.0h:
641  Owners Stateroom44211/29/2412/13/243.2w:
641-09    Carpentry44211/29/2412/13/242.2w:
641-09-01      Room Framing8811/29/2412/13/2488.0h:
641-09-01-L        Labor8811/29/2412/13/242.2w:
641-09-01-L 01          Install shipside framing1611/29/2412/02/2416.0h:
641-09-01-L 02          Install portlight framing1212/03/2412/04/2412.0h:
641-09-01-L 03          Frame closet sides1612/04/2412/06/2416.0h:
641-09-01-L 04          Install overhead framing2412/06/2412/11/2424.0h:
641-09-01-L 05          Rough in window box1212/11/2412/12/2412.0h:
641-09-01-L 06          Provide accesses to pipes/wiring812/13/2412/13/248.0h:
641-09-02      AC Plenum (P)3212/10/2412/13/2432.0h:
641-09-02-L        Labor3212/10/2412/13/240.8w:
641-09-02-L 01          Fabricate AC plenum1612/10/2412/11/2416.0h:
641-09-02-L 02          Install AC plenum812/12/2412/12/248.0h:
641-09-02-L 03          Rough in AC ducting412/13/2412/13/244.0h:
641-09-02-L 04          Connect AC ducting412/13/2412/13/244.0h:
641-09-03      AC Plenum (S)3212/10/2412/13/2432.0h:
641-09-03-L        Labor3212/10/2412/13/240.8w:
641-09-03-L 01          Fabricate AC plenum1612/10/2412/11/2416.0h:
641-09-03-L 02          Install AC plenum812/12/2412/12/248.0h:
641-09-03-L 03          Rough in AC ducting412/13/2412/13/244.0h:
641-09-03-L 04          Connect AC ducting412/13/2412/13/244.0h:
641-09-04      Bed812/13/2412/13/248.0h:
641-09-04-L        Labor812/13/2412/13/240.2w:
641-09-04-L 01          Install toe kick212/13/2412/13/242.0h:
641-09-04-L 02          Install base frame212/13/2412/13/242.0h:
641-09-04-L 03          Install side/foot rails212/13/2412/13/242.0h:
641-09-04-L 04          Install upper rail212/13/2412/13/242.0h:
641-09-05      Nightstand1212/12/2412/13/2412.0h:
641-09-05-L        Labor1212/12/2412/13/240.3w:
641-09-05-L 01          Install toe kick212/12/2412/12/242.0h:
641-09-05-L 02          Install base frame212/12/2412/12/242.0h:
641-09-05-L 03          Fabricate upper rail/Countertop212/13/2412/13/242.0h:
641-09-05-L 04          Install filler piece to bed212/13/2412/13/242.0h:
641-09-05-L 05          Install panels/door212/13/2412/13/242.0h:
641-09-05-L 06          Install shelf212/13/2412/13/242.0h:
641-09-06      Dresser Cabinet (P)1212/12/2412/13/2412.0h:
641-09-06-L        Labor1212/12/2412/13/240.3w:
641-09-06-L 01          Install toe kick212/12/2412/12/242.0h:
641-09-06-L 02          Install base frame212/12/2412/12/242.0h:
641-09-06-L 03          Fabricate upper rail/Countertop212/13/2412/13/242.0h:
641-09-06-L 04          Install filler piece to bed212/13/2412/13/242.0h:
641-09-06-L 05          Install panels/door212/13/2412/13/242.0h:
641-09-06-L 06          Install shelf212/13/2412/13/242.0h:
641-09-07      Dresser Cabinet (S)1212/12/2412/13/2412.0h:
641-09-07-L        Labor1212/12/2412/13/240.3w:
641-09-07-L 01          Install toe kick212/12/2412/12/242.0h:
641-09-07-L 02          Install base frame212/12/2412/12/242.0h:
641-09-07-L 03          Fabricate upper rail/Countertop212/13/2412/13/242.0h:
641-09-07-L 04          Install filler piece to bed212/13/2412/13/242.0h:
641-09-07-L 05          Install panels/door212/13/2412/13/242.0h:
641-09-07-L 06          Install shelf212/13/2412/13/242.0h:
641-09-08      TV Cabinet1212/12/2412/13/2412.0h:
641-09-08-L        Labor1212/12/2412/13/240.3w:
641-09-08-L 01          Install toe kick212/12/2412/12/242.0h:
641-09-08-L 02          Install base frame212/12/2412/12/242.0h:
641-09-08-L 03          Fabricate upper rail/Countertop212/13/2412/13/242.0h:
641-09-08-L 04          Install filler piece to bed212/13/2412/13/242.0h:
641-09-08-L 05          Install panels/door212/13/2412/13/242.0h:
641-09-08-L 06          Install shelf212/13/2412/13/242.0h:
641-09-09      Wall5212/05/2412/13/2452.0h:
641-09-09-L        Labor5212/05/2412/13/241.3w:
641-09-09-L 04          Install finish walls boxes at FWD nightstand412/05/2412/05/244.0h:
641-09-09-L 05          Install finish walls boxes at AFT nightstand412/06/2412/06/244.0h:
641-09-09-L 06          Clean and prep walls for wall covering1212/06/2412/09/2412.0h:
641-09-09-L 07          Install simple Base board molding1212/10/2412/11/2412.0h:
641-09-09-L 08          Cut in outlets/switches1212/11/2412/12/2412.0h:
641-09-09-L 09          Fab headboard panel812/13/2412/13/248.0h:
641-09-10      Ceiling5212/05/2412/13/2452.0h:
641-09-10-L        Labor5212/05/2412/13/241.3w:
641-09-10-L 01          Install simple perimeter crown molding1212/05/2412/06/2412.0h:
641-09-10-L 02          Install AC grill finish panel412/09/2412/09/244.0h:
641-09-10-L 03          Fabricate ceiling panels3212/09/2412/13/2432.0h:
641-09-10-L 04          Install perimeter AC soffit412/13/2412/13/244.0h:
641-09-11      Doors1612/12/2412/13/2416.0h:
641-09-11-L        Labor1612/12/2412/13/240.4w:
641-09-11-L 01          Prep door opening to receive door jabs812/12/2412/12/248.0h:
641-09-11-L 02          Install entry door casing and Jabs (3)412/13/2412/13/244.0h:
641-09-11-L 03          Install entry doors (3)412/13/2412/13/244.0h:
641-09-12      Windows (P)3212/10/2412/13/2432.0h:
641-09-12-L        Labor3212/10/2412/13/240.8w:
641-09-12-L 01          Install window boxes (Port)812/10/2412/10/248.0h:
641-09-12-L 02          Install window pilasters (Port)812/11/2412/11/248.0h:
641-09-12-L 03          Install window sill molding (Port)812/12/2412/12/248.0h:
641-09-12-L 04          Install window valances (Port)812/13/2412/13/248.0h:
641-09-13      Windows (S)3212/10/2412/13/2432.0h:
641-09-13-L        Labor3212/10/2412/13/240.8w:
641-09-13-L 01          Install window boxes (STB)812/10/2412/10/248.0h:
641-09-13-L 02          Install window pilasters (STB)812/11/2412/11/248.0h:
641-09-13-L 03          Install window sill molding (STB)812/12/2412/12/248.0h:
641-09-13-L 04          Install window valances (STB)812/13/2412/13/248.0h:
641-09-14      Aft Windows4012/09/2412/13/2440.0h:
641-09-14-L        Labor4012/09/2412/13/241.0w:
641-09-14-L 01          Install fwd window boxes812/09/2412/09/248.0h:
641-09-14-L 02          Install fwd window mullion boxes812/10/2412/10/248.0h:
641-09-14-L 03          Install fwd window panels812/11/2412/11/248.0h:
641-09-14-L 04          Install fwd window sill molding812/12/2412/12/248.0h:
641-09-14-L 05          Install window upper valance812/13/2412/13/248.0h:
641-09-15      Trim1012/12/2412/13/2410.0h:
641-09-15-L        Labor1012/12/2412/13/240.3w:
641-09-15-L 01          Install upholstered bed trim412/12/2412/13/244.0h:
641-09-15-L 02          Install finished ceiling panels612/13/2412/13/246.0h:
642  Owners Closet17212/04/2412/13/241.5w:
642-09    Carpentry17212/04/2412/13/241.5w:
642-09-01      Room Framing5212/04/2412/13/2460.0h:
642-09-01-L        Labor5212/05/2412/13/241.3w:
642-09-01-L 01          Install shipside framing812/05/2412/06/248.0h:
642-09-01-L 02          Install portlight framing412/06/2412/06/244.0h:
642-09-01-L 03          Frame closet sides1612/09/2412/10/2416.0h:
642-09-01-L 04          Frame stairway walls812/11/2412/11/248.0h:
642-09-01-L 05          Install stariway steps412/12/2412/12/244.0h:
642-09-01-L 06          Install ceiling head box412/12/2412/12/244.0h:
642-09-01-L 07          Install ceiling box framing412/13/2412/13/244.0h:
642-09-01-L 08          Rough in window box412/13/2412/13/244.0h:
642-09-02      Doors 3212/10/2412/13/2432.0h:
642-09-02-L        Labor3212/10/2412/13/240.8w:
642-09-02-L 01          Prep door opening to receive door jabs (P)412/10/2412/10/244.0h:
642-09-02-L 02          Install entry door casing and Jabs (P)812/10/2412/11/248.0h:
642-09-02-L 03          Install entry doors (P)412/11/2412/11/244.0h:
642-09-02-L 04          Prep door opening to receive door jabs (S)412/12/2412/12/244.0h:
642-09-02-L 05          Install entry door casing and Jabs (S)812/12/2412/13/248.0h:
642-09-02-L 06          Install entry doors (S)412/13/2412/13/244.0h:
642-09-03      Windows1612/12/2412/13/2416.0h:
642-09-03-L        Labor1612/12/2412/13/240.4w:
642-09-03-L 01          Install window boxes (Port)812/12/2412/12/248.0h:
642-09-03-L 02          Install window sill molding (Port)412/13/2412/13/244.0h:
642-09-03-L 03          Install window valances (Port)412/13/2412/13/244.0h:
642-09-04      Closet3612/09/2412/13/2436.0h:
642-09-04-L        Labor3612/09/2412/13/240.9w:
642-09-04-L 01          Install finish paneling2412/09/2412/12/2424.0h:
642-09-04-L 02          Install lower cabinet frame412/12/2412/12/244.0h:
642-09-04-L 03          Install lower cabinet trim/counter top412/13/2412/13/244.0h:
642-09-04-L 04          Install lower cabinet shelves412/13/2412/13/244.0h:
642-09-05      Closet3612/09/2412/13/2436.0h:
642-09-05-L        Labor3612/09/2412/13/240.9w:
642-09-05-L 01          Install finish paneling2412/09/2412/12/2424.0h:
642-09-05-L 02          Install lower cabinet frame412/12/2412/12/244.0h:
642-09-05-L 03          Install lower cabinet trim/counter top412/13/2412/13/244.0h:
642-09-05-L 04          Install lower cabinet shelves412/13/2412/13/244.0h:
643  Owners Bathroom15412/06/2412/13/243.8w:
643-09    Carpentry15412/06/2412/13/241.2w:
643-09-01      Room Framing 4812/06/2412/13/2448.0h:
643-09-01-L        Labor4812/06/2412/13/241.2w:
643-09-01-L 01          Install cabin side paneling812/06/2412/06/248.0h:
643-09-01-L 02          Frame shower enclousre1212/09/2412/10/2412.0h:
643-09-01-L 03          Install shower sub-floor412/10/2412/10/244.0h:
643-09-01-L 04          Fabricate shower overhead panel412/11/2412/11/244.0h:
643-09-01-L 05          West system shower enclosure812/11/2412/12/248.0h:
643-09-01-L 06          Install overhead framing812/12/2412/13/248.0h:
643-09-01-L 07          Cut pipe/electric accesses212/13/2412/13/242.0h:
643-09-01-L 08          Rough AC ducting from stateroom212/13/2412/13/242.0h:
643-09-02      Sink Vanity Cabinet1612/12/2412/13/2416.0h:
643-09-02-L        Labor1612/12/2412/13/240.4w:
643-09-02-L 01          Install toe kick212/12/2412/12/242.0h:
643-09-02-L 02          Install base frame212/12/2412/12/242.0h:
643-09-02-L 03          Install side filler pieces212/12/2412/12/242.0h:
643-09-02-L 04          Install finish panels/door412/12/2412/13/244.0h:
643-09-02-L 05          Install shelf212/13/2412/13/242.0h:
643-09-02-L 06          Install pipe box around plumbing212/13/2412/13/242.0h:
643-09-02-L 07          Install sub-countertop for stone212/13/2412/13/242.0h:
643-09-03      Medicine Cabinet1212/12/2412/13/2412.0h:
643-09-03-L        Labor1212/12/2412/13/240.3w:
643-09-03-L 01          Install base frame412/12/2412/12/244.0h:
643-09-03-L 02          Install verical light recesses212/13/2412/13/242.0h:
643-09-03-L 03          Install side filler pieces212/13/2412/13/242.0h:
643-09-03-L 04          Install doors 212/13/2412/13/242.0h:
643-09-03-L 05          Install shelves212/13/2412/13/242.0h:
643-09-04      Walls3012/10/2412/13/2430.0h:
643-09-04-L        Labor3012/10/2412/13/240.8w:
643-09-04-L 01          Install Ship side finish wood panel412/10/2412/10/244.0h:
643-09-04-L 02          Install fwd finish wood panel412/10/2412/11/244.0h:
643-09-04-L 03          Install fwd finish wood panel molding412/11/2412/11/244.0h:
643-09-04-L 04          Install base board612/11/2412/12/246.0h:
643-09-04-L 05          Prep walls for wall coverings812/12/2412/13/248.0h:
643-09-04-L 06          Cut in outlets/switches412/13/2412/13/244.0h:
643-09-05      Ceiling 3612/09/2412/13/2436.0h:
643-09-05-L        Labor3612/09/2412/13/240.9w:
643-09-05-L 01          Install simple perimeter crown molding612/09/2412/10/246.0h:
643-09-05-L 02          Install AC grill finish panel212/10/2412/10/242.0h:
643-09-05-L 03          Install perimeter AC soffit412/10/2412/10/244.0h:
643-09-05-L 04          Fab overhead panels2412/11/2412/13/2424.0h:
643-09-07      Finish Trims 1212/12/2412/13/2412.0h:
643-09-07-L        Labor1212/12/2412/13/240.3w:
643-09-07-L 01          Install overhead panels412/12/2412/12/244.0h:
643-09-07-L 02          Install bathroom accessories812/13/2412/13/248.0h:
645  Galley40812/02/2412/13/242.0w:
645-09    Carpentry40812/02/2412/13/242.0w:
645-09-01      Room Framing8012/02/2412/13/2480.0h:
645-09-01-L        Labor8012/02/2412/13/242.0w:
645-09-01-L 01          Install cabin side framing port2412/02/2412/04/2424.0h:
645-09-01-L 02          Install port window boxes1212/05/2412/06/2412.0h:
645-09-01-L 03          Install cabin side paneling port1212/06/2412/09/2412.0h:
645-09-01-L 04          Frame out for refrigerator 1212/10/2412/11/2412.0h:
645-09-01-L 05          Frame out stairway walls1212/11/2412/12/2412.0h:
645-09-01-L 06          Frame out stairway steps 812/13/2412/13/248.0h:
645-09-02      AC Plenums2412/11/2412/13/2424.0h:
645-09-02-L        Labor2412/11/2412/13/240.6w:
645-09-02-L 01          Fabricate AC plenum aft812/11/2412/11/248.0h:
645-09-02-L 02          Install AC plenum aft812/12/2412/12/248.0h:
645-09-02-L 03          Rough in AC ducting port412/13/2412/13/244.0h:
645-09-02-L 04          Connect AC ducting to plenum412/13/2412/13/244.0h:
645-09-03      Breakfast Bar2412/11/2412/13/2424.0h:
645-09-03-L        Labor2412/11/2412/13/240.6w:
645-09-03-L 01          Install toe kick412/11/2412/11/244.0h:
645-09-03-L 02          Install base frame cabinets412/11/2412/11/244.0h:
645-09-03-L 03          Install finish panels412/12/2412/12/244.0h:
645-09-03-L 04          Install drawer front panels412/12/2412/12/244.0h:
645-09-03-L 05          Install door panels412/13/2412/13/244.0h:
645-09-03-L 06          Install sub-countertop for stone412/13/2412/13/244.0h:
645-09-04      Sink cabinet2812/10/2412/13/2428.0h:
645-09-04-L        Labor2812/10/2412/13/240.7w:
645-09-04-L 01          Install toe kick412/10/2412/10/244.0h:
645-09-04-L 02          Install base frame cabinets412/11/2412/11/244.0h:
645-09-04-L 03          Install finish panels412/11/2412/11/244.0h:
645-09-04-L 04          Install drawer front panels412/12/2412/12/244.0h:
645-09-04-L 05          Install door panels812/12/2412/13/248.0h:
645-09-04-L 06          Install sub-countertop for stone412/13/2412/13/244.0h:
645-09-05      Cook top lower cabinet2012/11/2412/13/2420.0h:
645-09-05-L        Labor2012/11/2412/13/240.5w:
645-09-05-L 01          Install base frame cabinets412/11/2412/11/244.0h:
645-09-05-L 02          Install toe kick412/12/2412/12/244.0h:
645-09-05-L 03          Install finish panels412/12/2412/12/244.0h:
645-09-05-L 04          Install door panels412/13/2412/13/244.0h:
645-09-05-L 05          Install sub-countertop for stone412/13/2412/13/244.0h:
645-09-06      Oven Cabinet2012/11/2412/13/2420.0h:
645-09-06-L        Labor2012/11/2412/13/240.5w:
645-09-06-L 01          Install base frame cabinets412/11/2412/11/244.0h:
645-09-06-L 02          Install toe kick412/12/2412/12/244.0h:
645-09-06-L 03          Install finish panels412/12/2412/12/244.0h:
645-09-06-L 04          Install door panels412/13/2412/13/244.0h:
645-09-06-L 05          Install sub-countertop for stone412/13/2412/13/244.0h:
645-09-07      Cook top Upper Cabinet2012/11/2412/13/2420.0h:
645-09-07-L        Labor2012/11/2412/13/240.5w:
645-09-07-L 01          Install base frame412/11/2412/11/244.0h:
645-09-07-L 02          Install lower edge molding412/12/2412/12/244.0h:
645-09-07-L 03          Install shelfs412/12/2412/12/244.0h:
645-09-07-L 04          Install cabinets doors412/13/2412/13/244.0h:
645-09-07-L 05          Install Hardware412/13/2412/13/244.0h:
645-09-08      Breakfast Bar Upper Cabinet2012/11/2412/13/2420.0h:
645-09-08-L        Labor2012/11/2412/13/240.5w:
645-09-08-L 01          Install base frame412/11/2412/11/244.0h:
645-09-08-L 02          Install lower edge molding412/12/2412/12/244.0h:
645-09-08-L 03          Install shelfs412/12/2412/12/244.0h:
645-09-08-L 04          Install cabinets doors412/13/2412/13/244.0h:
645-09-08-L 05          Install Hardware412/13/2412/13/244.0h:
645-09-09      Pantry2412/11/2412/13/2424.0h:
645-09-09-L        Labor2412/11/2412/13/240.6w:
645-09-09-L 01          Install base frame812/11/2412/11/248.0h:
645-09-09-L 02          Install lower edge molding412/12/2412/12/244.0h:
645-09-09-L 03          Install shelfs412/12/2412/12/244.0h:
645-09-09-L 04          Install cabinets doors412/13/2412/13/244.0h:
645-09-09-L 05          Install Hardware412/13/2412/13/244.0h:
645-09-10      Wall8012/02/2412/13/2480.0h:
645-09-10-L        Labor8012/02/2412/13/242.0w:
645-09-10-L 01          Install fwd bhd storage cabinets1212/02/2412/03/2412.0h:
645-09-10-L 02          Install fwd bhd storage cabinets doors 412/03/2412/03/244.0h:
645-09-10-L 03          Install fwd bulkhead AC grills412/04/2412/04/244.0h:
645-09-10-L 04          Install fwd bulkhead wood panels1612/04/2412/06/2416.0h:
645-09-10-L 05          Install STB shipside wood panels2412/06/2412/11/2424.0h:
645-09-10-L 06          Cut in outlets/switches1212/11/2412/12/2412.0h:
645-09-10-L 07          Install simple Base board812/13/2412/13/248.0h:
645-09-11      Windows2012/11/2412/13/2420.0h:
645-09-11-L        Labor2012/11/2412/13/240.5w:
645-09-11-L 01          Install window boxes412/11/2412/11/244.0h:
645-09-11-L 02          Install window pilasters412/12/2412/12/244.0h:
645-09-11-L 03          Install window sill molding412/12/2412/12/244.0h:
645-09-11-L 04          Install window valances412/13/2412/13/244.0h:
645-09-11-L 05          Install window panel412/13/2412/13/244.0h:
645-09-12      Appliances1612/12/2412/13/2416.0h:
645-09-12-L        Labor1612/12/2412/13/240.4w:
645-09-12-L 01          Install dishwahers412/12/2412/12/244.0h:
645-09-12-L 02          Install double ovens412/12/2412/12/244.0h:
645-09-12-L 03          Install microwave412/13/2412/13/244.0h:
645-09-12-L 04          Install icemaker412/13/2412/13/244.0h:
645-09-13      Ceiling2412/02/2412/13/2475.0h:
645-09-13-L        Labor2412/11/2412/13/240.6w:
645-09-13-L 01          Fab overhead panels2412/11/2412/13/2424.0h:
645-09-15      Trim812/13/2412/13/248.0h:
645-09-15-L        Labor812/13/2412/13/240.2w:
645-09-15-L 01          Install overhead panels812/13/2412/13/248.0h:
647  Powder room18612/02/2412/13/241.9w:
647-09    Carpentry18612/02/2412/13/241.9w:
647-09-01      Room Framing7612/02/2412/13/2476.0h:
647-09-01-L        Labor7612/02/2412/13/241.9w:
647-09-01-L 01          Install cabin side paneling2412/02/2412/05/2424.0h:
647-09-01-L 02          Frame shower enclousre1212/05/2412/06/2412.0h:
647-09-01-L 03          Install shower sub-floor812/09/2412/09/248.0h:
647-09-01-L 04          Fabricate shower overhead panel812/10/2412/10/248.0h:
647-09-01-L 05          West system shower enclosure812/11/2412/11/248.0h:
647-09-01-L 06          Install overhead framing812/12/2412/12/248.0h:
647-09-01-L 07          Cut pipe/electric accesses412/13/2412/13/244.0h:
647-09-01-L 08          Rough AC ducting from stateroom412/13/2412/13/244.0h:
647-09-02      Sink Vanity Cabinet1812/11/2412/13/2418.0h:
647-09-02-L        Labor1812/11/2412/13/240.5w:
647-09-02-L 01          Install toe kick412/11/2412/12/244.0h:
647-09-02-L 02          Install base frame412/12/2412/12/244.0h:
647-09-02-L 03          Install side filler pieces212/12/2412/12/242.0h:
647-09-02-L 04          Install finish panels/door412/13/2412/13/244.0h:
647-09-02-L 05          Install shelf212/13/2412/13/242.0h:
647-09-02-L 06          Install sub-countertop for stone212/13/2412/13/242.0h:
647-09-03      Medicine Cabinet1212/12/2412/13/2412.0h:
647-09-03-L        Labor1212/12/2412/13/240.3w:
647-09-03-L 01          Install base frame212/12/2412/12/242.0h:
647-09-03-L 02          Install verical light recesses212/12/2412/12/242.0h:
647-09-03-L 03          Install side filler pieces212/13/2412/13/242.0h:
647-09-03-L 04          Install doors 412/13/2412/13/244.0h:
647-09-03-L 05          Install shelves212/13/2412/13/242.0h:
647-09-04      Walls2412/11/2412/13/2424.0h:
647-09-04-L        Labor2412/11/2412/13/240.6w:
647-09-04-L 01          Install Ship side finish wood panel412/11/2412/11/244.0h:
647-09-04-L 02          Install fwd finish wood panel412/11/2412/11/244.0h:
647-09-04-L 03          Install fwd finish wood panel molding412/12/2412/12/244.0h:
647-09-04-L 04          Install base board412/12/2412/12/244.0h:
647-09-04-L 05          Prep walls for wall coverings412/13/2412/13/244.0h:
647-09-04-L 06          Cut in outlets/switches412/13/2412/13/244.0h:
647-09-05      Ceiling2812/10/2412/13/2428.0h:
647-09-05-L        Labor2812/10/2412/13/240.7w:
647-09-05-L 01          Install simple perimeter crown molding412/10/2412/10/244.0h:
647-09-05-L 02          Install AC grill finish panel412/11/2412/11/244.0h:
647-09-05-L 03          Install perimeter AC soffit412/11/2412/11/244.0h:
647-09-05-L 04          Fab overhead panels1612/12/2412/13/2416.0h:
647-09-06      Flooring1212/12/2412/13/2412.0h:
647-09-06-L        Labor1212/12/2412/13/240.3w:
647-09-06-L 01          Prep flooring for stonework1212/12/2412/13/2412.0h:
647-09-07      Finish Trims1612/12/2412/13/2416.0h:
647-09-07-L        Labor1612/12/2412/13/240.4w:
647-09-07-L 01          Install overhead panels812/12/2412/12/248.0h:
647-09-07-L 02          Install bathroom accessories812/13/2412/13/248.0h:
648  Port Main Foyer10412/09/2412/13/241.7w:
648-09    Carpentry10412/09/2412/13/2440.0h:
648-09-01      Wall (P)4012/09/2412/13/2440.0h:
648-09-01-L        Labor4012/09/2412/13/241.0w:
648-09-01-L 01          Install wood panels (S)2412/09/2412/11/2424.0h:
648-09-01-L 02          Install simple base board molding1212/12/2412/13/2412.0h:
648-09-01-L 03          Cut in outlets/switches412/13/2412/13/244.0h:
648-09-02      Wall (S)4012/09/2412/13/2440.0h:
648-09-02-L        Labor4012/09/2412/13/241.0w:
648-09-02-L 01          Install wood panels (S)2412/09/2412/11/2424.0h:
648-09-02-L 02          Install simple base board molding1212/12/2412/13/2412.0h:
648-09-02-L 03          Cut in outlets/switches412/13/2412/13/244.0h:
648-09-03      Flooring (P)1212/11/2412/13/2418.0h:
648-09-03-L        Labor1212/12/2412/13/240.3w:
648-09-03-L 01          Install perimeter molding1212/12/2412/13/2412.0h:
648-09-04      Flooring (S)1212/11/2412/13/2418.0h:
648-09-04-L        Labor1212/12/2412/13/240.3w:
648-09-04-L 01          Install perimeter molding1212/12/2412/13/2412.0h:
649  STBD Main Foyer10412/09/2412/13/241.7w:
649-09    Carpentry10412/09/2412/13/2440.0h:
649-09-01      Wall (P)4012/09/2412/13/2440.0h:
649-09-01-L        Labor4012/09/2412/13/241.0w:
649-09-01-L 01          Install wood panels (S)2412/09/2412/11/2424.0h:
649-09-01-L 02          Install simple base board molding1212/12/2412/13/2412.0h:
649-09-01-L 03          Cut in outlets/switches412/13/2412/13/244.0h:
649-09-02      Wall (S)4012/09/2412/13/2440.0h:
649-09-02-L        Labor4012/09/2412/13/241.0w:
649-09-02-L 01          Install wood panels (S)2412/09/2412/11/2424.0h:
649-09-02-L 02          Install simple base board molding1212/12/2412/13/2412.0h:
649-09-02-L 03          Cut in outlets/switches412/13/2412/13/244.0h:
649-09-03      Flooring (P)1212/11/2412/13/2418.0h:
649-09-03-L        Labor1212/12/2412/13/240.3w:
649-09-03-L 01          Install perimeter molding1212/12/2412/13/2412.0h:
649-09-04      Flooring (S)1212/11/2412/13/2418.0h:
649-09-04-L        Labor1212/12/2412/13/240.3w:
649-09-04-L 01          Install perimeter molding1212/12/2412/13/2412.0h:
652  Main Salon39211/21/2412/13/243.3w:
652-09    Carpentry39211/21/2412/13/243.3w:
652-09-01      Room Framing6412/04/2412/13/2464.0h:
652-09-01-L        Labor6412/04/2412/13/241.6w:
652-09-01-L 01          Install cabin side framing (P)812/04/2412/04/248.0h:
652-09-01-L 02          Install port window boxes (P)812/05/2412/05/248.0h:
652-09-01-L 03          Frame out pilasters (P)812/06/2412/06/248.0h:
652-09-01-L 04          Install cabin side paneling (P)812/09/2412/09/248.0h:
652-09-01-L 05          Install cabin side framing (S)812/10/2412/10/248.0h:
652-09-01-L 06          Install window boxes (S)812/11/2412/11/248.0h:
652-09-01-L 07          Frame out pilasters (S)812/12/2412/12/248.0h:
652-09-01-L 08          Install cabin side paneling (S)812/13/2412/13/248.0h:
652-09-02      AC Plenum4012/09/2412/13/2440.0h:
652-09-02-L        Labor4012/09/2412/13/241.0w:
652-09-02-L 01          Fabricate AC plenum (P)812/09/2412/09/248.0h:
652-09-02-L 02          Rough in AC ducting (P)412/10/2412/10/244.0h:
652-09-02-L 03          Install AC plenum (P)412/10/2412/10/244.0h:
652-09-02-L 04          Install AC valances (P)412/11/2412/11/244.0h:
652-09-02-L 05          Fabricate AC plenum (S)812/11/2412/12/248.0h:
652-09-02-L 06          Rough in AC ducting (S)412/12/2412/12/244.0h:
652-09-02-L 07          Install AC plenum (S)412/13/2412/13/244.0h:
652-09-02-L 08          Install AC valances (S)412/13/2412/13/244.0h:
652-09-03      Ship side fwd Cabinet (S)3612/09/2412/13/2436.0h:
652-09-03-L        Labor3612/09/2412/13/240.9w:
652-09-03-L 01          Install toe kick412/09/2412/09/244.0h:
652-09-03-L 02          Install toe kick molding412/10/2412/10/244.0h:
652-09-03-L 03          Install base frame cabinets412/10/2412/10/244.0h:
652-09-03-L 04          Install finish panels412/11/2412/11/244.0h:
652-09-03-L 05          Install cabinet doors412/11/2412/11/244.0h:
652-09-03-L 06          Install countertop812/12/2412/12/248.0h:
652-09-03-L 07          Install countertop edge molding812/13/2412/13/248.0h:
652-09-04      Ship side aft Cabinet (S)3612/09/2412/13/2436.0h:
652-09-04-L        Labor3612/09/2412/13/240.9w:
652-09-04-L 01          Install toe kick412/09/2412/09/244.0h:
652-09-04-L 02          Install toe kick molding412/10/2412/10/244.0h:
652-09-04-L 03          Install base frame cabinets412/10/2412/10/244.0h:
652-09-04-L 04          Install finish panels412/11/2412/11/244.0h:
652-09-04-L 05          Install cabinet doors412/11/2412/11/244.0h:
652-09-04-L 06          Install countertop812/12/2412/12/248.0h:
652-09-04-L 07          Install countertop edge molding812/13/2412/13/248.0h:
652-09-07      TV Cabinet (Ceiling)1612/12/2412/13/2416.0h:
652-09-07-L        Labor1612/12/2412/13/240.4w:
652-09-07-L 01          Install base frame412/12/2412/12/244.0h:
652-09-07-L 02          Install pop-down enclosure412/12/2412/12/244.0h:
652-09-07-L 03          Install cabinet door panels412/13/2412/13/244.0h:
652-09-07-L 04          Install components/ install hardware412/13/2412/13/244.0h:
652-09-08      Wall7212/03/2412/13/2472.0h:
652-09-08-L        Labor7212/03/2412/13/241.8w:
652-09-08-L 01          Install shipside aft panels (Port)1212/03/2412/04/2412.0h:
652-09-08-L 02          Install shipside aft panels (STB)1212/04/2412/05/2412.0h:
652-09-08-L 03          Install main salon fwd bulkhead812/06/2412/06/248.0h:
652-09-08-L 04          Install main salon fwd walls812/09/2412/09/248.0h:
652-09-08-L 05          Install stairway panels812/10/2412/10/248.0h:
652-09-08-L 06          Install aft bhd panels412/11/2412/11/244.0h:
652-09-08-L 07          Install aft door molding412/11/2412/11/244.0h:
652-09-08-L 08          Install archway moldings412/12/2412/12/244.0h:
652-09-08-L 09          Install simple Base board1212/12/2412/13/2412.0h:
652-09-09      Windows3212/10/2412/13/2432.0h:
652-09-09-L        Labor3212/10/2412/13/240.8w:
652-09-09-L 01          Install window boxes (Port)412/10/2412/10/244.0h:
652-09-09-L 02          Install window pilasters (Port)412/10/2412/10/244.0h:
652-09-09-L 03          Install window sill molding (Port)412/11/2412/11/244.0h:
652-09-09-L 04          Install window valances (Port)412/11/2412/11/244.0h:
652-09-09-L 05          Install window boxes (STB)412/12/2412/12/244.0h:
652-09-09-L 06          Install window pilasters (STB)412/12/2412/12/244.0h:
652-09-09-L 07          Install window sill molding (STB)412/13/2412/13/244.0h:
652-09-09-L 08          Install window valances (STB)412/13/2412/13/244.0h:
652-09-10      Aft Windows2012/11/2412/13/2420.0h:
652-09-10-L        Labor2012/11/2412/13/240.5w:
652-09-10-L 01          Install fwd window boxes412/11/2412/11/244.0h:
652-09-10-L 02          Install fwd window mullion boxes412/12/2412/12/244.0h:
652-09-10-L 03          Install fwd window panels412/12/2412/12/244.0h:
652-09-10-L 04          Install fwd window sill molding412/13/2412/13/244.0h:
652-09-10-L 05          Install window upper valance412/13/2412/13/244.0h:
652-09-11      Ceiling7211/21/2412/13/24130.0h:
652-09-11-L        Labor7212/03/2412/13/241.8w:
652-09-11-L 01          Install overhead framing2412/03/2412/05/2424.0h:
652-09-11-L 02          Finish perimeter crown molding1612/06/2412/09/2416.0h:
652-09-11-L 03          Fab overhead panels2412/10/2412/12/2424.0h:
652-09-11-L 04          Finish AC grill finish panel812/13/2412/13/248.0h:
652-09-12      Trim412/13/2412/13/244.0h:
652-09-12-L        Labor412/13/2412/13/240.1w:
652-09-12-L 01          Connect AC ducting412/13/2412/13/244.0h:
661  Pilothouse36812/02/2412/13/242.0w:
661-09    Carpentry36812/02/2412/13/242.0w:
661-09-01      Room Framing8012/02/2412/13/2480.0h:
661-09-01-L        Labor8012/02/2412/13/242.0w:
661-09-01-L 01          Install cabin side framing port2412/02/2412/04/2424.0h:
661-09-01-L 02          Install port window boxes1212/05/2412/06/2412.0h:
661-09-01-L 03          Install cabin side paneling port1212/06/2412/09/2412.0h:
661-09-01-L 04          Frame out for refrigerator 1212/10/2412/11/2412.0h:
661-09-01-L 05          Frame out stairway walls1212/11/2412/12/2412.0h:
661-09-01-L 06          Frame out stairway steps 812/13/2412/13/248.0h:
661-09-02      AC Plenums2412/11/2412/13/2424.0h:
661-09-02-L        Labor2412/11/2412/13/240.6w:
661-09-02-L 01          Fabricate AC plenum aft812/11/2412/11/248.0h:
661-09-02-L 02          Install AC plenum aft812/12/2412/12/248.0h:
661-09-02-L 03          Rough in AC ducting port412/13/2412/13/244.0h:
661-09-02-L 04          Connect AC ducting to plenum412/13/2412/13/244.0h:
661-09-03      Lower console2412/11/2412/13/2424.0h:
661-09-03-L        Labor2412/11/2412/13/240.6w:
661-09-03-L 01          Install toe kick412/11/2412/11/244.0h:
661-09-03-L 02          Install base frame cabinets412/11/2412/11/244.0h:
661-09-03-L 03          Install finish panels412/12/2412/12/244.0h:
661-09-03-L 04          Install drawer front panels412/12/2412/12/244.0h:
661-09-03-L 05          Install door panels412/13/2412/13/244.0h:
661-09-03-L 06          Install sub-countertop for stone412/13/2412/13/244.0h:
661-09-04      Upper console2812/10/2412/13/2428.0h:
661-09-04-L        Labor2812/10/2412/13/240.7w:
661-09-04-L 01          Install toe kick412/10/2412/10/244.0h:
661-09-04-L 02          Install base frame cabinets412/11/2412/11/244.0h:
661-09-04-L 03          Install finish panels412/11/2412/11/244.0h:
661-09-04-L 04          Install drawer front panels412/12/2412/12/244.0h:
661-09-04-L 05          Install door panels812/12/2412/13/248.0h:
661-09-04-L 06          Install sub-countertop for stone412/13/2412/13/244.0h:
661-09-05      Chart table2012/11/2412/13/2420.0h:
661-09-05-L        Labor2012/11/2412/13/240.5w:
661-09-05-L 01          Install base frame cabinets412/11/2412/11/244.0h:
661-09-05-L 02          Install toe kick412/12/2412/12/244.0h:
661-09-05-L 03          Install finish panels412/12/2412/12/244.0h:
661-09-05-L 04          Install door panels412/13/2412/13/244.0h:
661-09-05-L 05          Install sub-countertop for stone412/13/2412/13/244.0h:
661-09-06      Bench seat2012/11/2412/13/2420.0h:
661-09-06-L        Labor2012/11/2412/13/240.5w:
661-09-06-L 01          Install base frame cabinets412/11/2412/11/244.0h:
661-09-06-L 02          Install toe kick412/12/2412/12/244.0h:
661-09-06-L 03          Install finish panels412/12/2412/12/244.0h:
661-09-06-L 04          Install door panels412/13/2412/13/244.0h:
661-09-06-L 05          Install sub-countertop for stone412/13/2412/13/244.0h:
661-09-07      Seat step2012/11/2412/13/2420.0h:
661-09-07-L        Labor2012/11/2412/13/240.5w:
661-09-07-L 01          Install base frame412/11/2412/11/244.0h:
661-09-07-L 02          Install lower edge molding412/12/2412/12/244.0h:
661-09-07-L 03          Install shelfs412/12/2412/12/244.0h:
661-09-07-L 04          Install cabinets doors412/13/2412/13/244.0h:
661-09-07-L 05          Install Hardware412/13/2412/13/244.0h:
661-09-08      Seat Upper Storage cabinet2012/11/2412/13/2420.0h:
661-09-08-L        Labor2012/11/2412/13/240.5w:
661-09-08-L 01          Install base frame412/11/2412/11/244.0h:
661-09-08-L 02          Install lower edge molding412/12/2412/12/244.0h:
661-09-08-L 03          Install shelfs412/12/2412/12/244.0h:
661-09-08-L 04          Install cabinets doors412/13/2412/13/244.0h:
661-09-08-L 05          Install Hardware412/13/2412/13/244.0h:
661-09-09      Wall8012/02/2412/13/2480.0h:
661-09-09-L        Labor8012/02/2412/13/242.0w:
661-09-09-L 01          Install fwd bhd storage cabinets1212/02/2412/03/2412.0h:
661-09-09-L 02          Install fwd bhd storage cabinets doors 412/03/2412/03/244.0h:
661-09-09-L 03          Install fwd bulkhead AC grills412/04/2412/04/244.0h:
661-09-09-L 04          Install fwd bulkhead wood panels1612/04/2412/06/2416.0h:
661-09-09-L 05          Install STB shipside wood panels2412/06/2412/11/2424.0h:
661-09-09-L 06          Cut in outlets/switches1212/11/2412/12/2412.0h:
661-09-09-L 07          Install simple Base board812/13/2412/13/248.0h:
661-09-10      Windows2012/11/2412/13/2420.0h:
661-09-10-L        Labor2012/11/2412/13/240.5w:
661-09-10-L 01          Install window boxes412/11/2412/11/244.0h:
661-09-10-L 02          Install window pilasters412/12/2412/12/244.0h:
661-09-10-L 03          Install window sill molding412/12/2412/12/244.0h:
661-09-10-L 04          Install window valances412/13/2412/13/244.0h:
661-09-10-L 05          Install window panel412/13/2412/13/244.0h:
661-09-11      Ceiling2412/02/2412/13/2475.0h:
661-09-11-L        Labor2412/11/2412/13/240.6w:
661-09-11-L 01          Fab overhead panels2412/11/2412/13/2424.0h:
661-09-12      Trim812/13/2412/13/248.0h:
661-09-12-L        Labor812/13/2412/13/240.2w:
661-09-12-L 01          Install overhead panels812/13/2412/13/248.0h:
8EXTERIOR61212/02/2412/13/2433.2w:
803  Main deck Walkway - Port14012/03/2412/13/241.7w:
803-09    Carpentry14012/03/2412/13/2468.0h:
803-09-01      Entry door8812/12/2412/13/2416.0h:
803-09-01-L        Labor8812/12/2412/13/240.4w:
803-09-01-L 01          Template deck area1612/13/2412/13/248.0h:
803-09-01-L 02          Prepare teak for jointing2412/12/2412/13/2412.0h:
803-09-01-L 03          Join teak panels3212/12/2412/13/2416.0h:
803-09-01-L 04          Cut teak panels to templates1612/13/2412/13/248.0h:
803-09-02      Overhead5212/03/2412/13/2468.0h:
803-09-02-L        Labor5212/09/2412/13/240.9w:
803-09-02-L 01          Install overhead framing1612/12/2412/13/2416.0h:
803-09-02-L 02          Install overhead lighta nd speaker blocking1212/09/2412/10/2412.0h:
803-09-02-L 03          Fabriacate overhead panels2412/11/2412/13/2424.0h:
804  Main deck Walkway - STBD14012/03/2412/13/241.7w:
804-09    Carpentry14012/03/2412/13/2468.0h:
804-09-01      Entry door8812/12/2412/13/2416.0h:
804-09-01-L        Labor8812/12/2412/13/240.4w:
804-09-01-L 01          Template deck area1612/13/2412/13/248.0h:
804-09-01-L 02          Prepare teak for jointing2412/12/2412/13/2412.0h:
804-09-01-L 03          Join teak panels3212/12/2412/13/2416.0h:
804-09-01-L 04          Cut teak panels to templates1612/13/2412/13/248.0h:
804-09-02      Overhead5212/03/2412/13/2468.0h:
804-09-02-L        Labor5212/09/2412/13/240.9w:
804-09-02-L 01          Install overhead framing1612/12/2412/13/2416.0h:
804-09-02-L 02          Install overhead lighta nd speaker blocking1212/09/2412/10/2412.0h:
804-09-02-L 03          Fabriacate overhead panels2412/11/2412/13/2424.0h:
805  Main deck - Aft5212/03/2412/13/244.0w:
805-09    Carpentry5212/03/2412/13/24100.0h:
805-09-01      Overhead5212/03/2412/13/2468.0h:
805-09-01-L        Labor5212/09/2412/13/240.9w:
805-09-01-L 01          Install overhead framing1612/12/2412/13/2416.0h:
805-09-01-L 02          Install overhead lighta nd speaker blocking1212/09/2412/10/2412.0h:
805-09-01-L 03          Fabriacate overhead panels2412/11/2412/13/2424.0h:
806  Transom10012/02/2412/13/242.5w:
806-09    Carpentry10012/02/2412/13/24100.0h:
806-09-01      Room Framing8012/02/2412/13/2480.0h:
806-09-01-L        Labor8012/02/2412/13/242.0w:
806-09-01-L 01          Install cabin side framing port2412/02/2412/04/2424.0h:
806-09-01-L 02          Install port window boxes1212/05/2412/06/2412.0h:
806-09-01-L 03          Install cabin side paneling port1212/06/2412/09/2412.0h:
806-09-01-L 04          Frame out for refrigerator 1212/10/2412/11/2412.0h:
806-09-01-L 05          Frame out stairway walls1212/11/2412/12/2412.0h:
806-09-01-L 06          Frame out stairway steps 812/13/2412/13/248.0h:
806-09-02      Lower cabinet2012/11/2412/13/2420.0h:
806-09-02-L        Labor2012/11/2412/13/240.5w:
806-09-02-L 01          Install base frame cabinets412/11/2412/11/244.0h:
806-09-02-L 02          Install toe kick412/12/2412/12/244.0h:
806-09-02-L 03          Install finish panels412/12/2412/12/244.0h:
806-09-02-L 04          Install door panels412/13/2412/13/244.0h:
806-09-02-L 05          Install sub-countertop for stone412/13/2412/13/244.0h:
815  Flybridge deck14012/02/2412/13/246.3w:
815-09    Carpentry14012/02/2412/13/24250.0h:
815-09-02      Overhead12012/02/2412/13/2480.0h:
815-09-02-L        Labor12012/02/2412/13/242.0w:
815-09-02-L 01          Install overhead framing4012/09/2412/13/2440.0h:
815-09-02-L 02          Install overhead lighta nd speaker blocking4012/02/2412/06/2440.0h:
815-09-02-L 03          Fabriacate overhead panels4012/09/2412/13/2440.0h:
815-09-04      Cabinets2012/11/2412/13/2420.0h:
815-09-04-L        Labor2012/11/2412/13/240.5w:
815-09-04-L 01          Fabricatel cabinet doors1612/11/2412/13/2416.0h:
815-09-04-L 02          Install cabinet doors412/13/2412/13/244.0h:
816  Hardtop4012/03/2412/13/242.8w:
816-09    Carpentry4012/03/2412/13/2472.0h:
816-09-01      Overhead4012/03/2412/13/2472.0h:
816-09-01-L        Labor4012/09/2412/13/241.0w:
816-09-01-L 01          Install overhead framing/blocking1612/09/2412/10/2416.0h:
816-09-01-L 02          Fab/remove overhead panels2412/11/2412/13/2424.0h:
******** *********************************************************************************