1.2 Department Schedules
012. Electrical
.
Department Catagory Schedules
WBSProject CategoriesLabor Hrs.Start DateFinish DatesDuration:Comments
DEPARTMENT TOTAL8,39211/04/2412/13/24.:.
3MECHANICAL SYSTEMS77612/06/2412/13/2467.2w:
4ENGINE ROOM90011/28/2412/13/2413.7w:
5ELECTRICAL3,66011/04/2412/13/246.0w:
6INTERIOR1,98411/22/2412/13/244.2w:
7MECHANICAL SPACES39212/02/2412/13/243.0w:
8EXTERIOR68012/04/2412/13/2433.2w:
******** *********************************************************************************
.
Department Job Schedules
WBSJob DescriptionLabor Hrs.Start DateFinish DateDuration:Comments
3MECHANICAL SYSTEMS77612/06/2412/13/2467.2w:
301  Freshwater7212/09/2412/13/243.5w:
301-12    Electrical7212/09/2412/13/241.0w:
301-12-01      Rough-in circuits3212/10/2412/13/2432.0h:
301-12-01-L        Labor3212/10/2412/13/240.8w:
301-12-01-L 01          Install pump circuit1212/10/2412/11/2412.0h:
301-12-01-L 02          Install water heater circuit812/11/2412/12/248.0h:
301-12-01-L 03          Install tank monitoring wiring812/12/2412/13/248.0h:
301-12-01-L 04          Install pump monitoring wiring412/13/2412/13/244.0h:
301-12-02      Install/Connect4012/09/2412/13/2440.0h:
301-12-02-L        Labor4012/09/2412/13/241.0w:
301-12-02-L 01          Connect pumps812/09/2412/09/248.0h:
301-12-02-L 02          Connect waterheaters812/10/2412/10/248.0h:
301-12-02-L 03          Connect pump monitoring1212/11/2412/12/2412.0h:
301-12-02-L 04          Connect tank monitoring1212/12/2412/13/2412.0h:
302  Graywater system4012/11/2412/13/244.0w:
302-12    Electrical4012/11/2412/13/240.6w:
302-12-01      Rough-in circuits1612/12/2412/13/2416.0h:
302-12-01-L        Labor1612/12/2412/13/240.4w:
302-12-01-L 01          Install pump circuit812/12/2412/12/248.0h:
302-12-01-L 02          Install tank monitoring wiring412/13/2412/13/244.0h:
302-12-01-L 03          Install pump monitoring wiring412/13/2412/13/244.0h:
302-12-02      Install/Connect2412/11/2412/13/2424.0h:
302-12-02-L        Labor2412/11/2412/13/240.6w:
302-12-02-L 01          Connect pumps812/11/2412/11/248.0h:
302-12-02-L 02          Connect pump monitoring812/12/2412/12/248.0h:
302-12-02-L 03          Connect tank monitoring812/13/2412/13/248.0h:
303  Blackwater4812/10/2412/13/244.5w:
303-12    Electrical4812/10/2412/13/240.7w:
303-12-01      Rough-in circuits2812/10/2412/13/2428.0h:
303-12-01-L        Labor2812/10/2412/13/240.7w:
303-12-01-L 01          Install AC pump wiring812/10/2412/11/248.0h:
303-12-01-L 02          Install tank monitoring wiring812/11/2412/12/248.0h:
303-12-01-L 03          Install pump monitoring wiring1212/12/2412/13/2412.0h:
303-12-02      Install/Connect2012/11/2412/13/2420.0h:
303-12-02-L        Labor2012/11/2412/13/240.5w:
303-12-02-L 01          Connect pumps812/11/2412/12/248.0h:
303-12-02-L 02          Connect monitoring1212/12/2412/13/2412.0h:
304  Air Conditioning6412/10/2412/13/245.1w:
304-12    Electrical6412/10/2412/13/240.8w:
310  Compressed air system4012/11/2412/13/243.0w:
310-12    Electrical4012/11/2412/13/240.6w:
310-12-01      Rough-in circuits2412/11/2412/13/2424.0h:
310-12-01-L        Labor2412/11/2412/13/240.6w:
310-12-01-L 01          Rough-in air compression circuit1212/11/2412/12/2412.0h:
310-12-01-L 02          Rough-in horn soleniod circuit1212/12/2412/13/2412.0h:
310-12-02      Install/Connect1612/12/2412/13/2416.0h:
310-12-02-L        Labor1612/12/2412/13/240.4w:
310-12-02-L 01          Connect air compressor 812/12/2412/12/248.0h:
310-12-02-L 02          Connect horn soleniod812/13/2412/13/248.0h:
312  Bilge system9612/06/2412/13/244.0w:
312-12    Electrical9612/06/2412/13/241.1w:
312-12-01      Rough-in circuits - P3612/09/2412/13/2436.0h:
312-12-01-L        Labor3612/09/2412/13/240.9w:
312-12-01-L 01          Install DC pump wiring (1)412/09/2412/09/244.0h:
312-12-01-L 02          Install DC pump wiring (2)412/10/2412/10/244.0h:
312-12-01-L 03          Install DC pump wiring (3)412/10/2412/10/244.0h:
312-12-01-L 04          Install DC pump wiring (4)412/11/2412/11/244.0h:
312-12-01-L 05          Install high level switch wiring (1)412/11/2412/11/244.0h:
312-12-01-L 06          Install high level switch wiring (2)412/12/2412/12/244.0h:
312-12-01-L 07          Install high level switch wiring (3)412/12/2412/12/244.0h:
312-12-01-L 08          Install high level switch wiring (4)412/13/2412/13/244.0h:
312-12-01-L 09          Install float switches412/13/2412/13/244.0h:
312-12-02      Install/Connect - P6012/06/2412/13/2444.0h:
312-12-02-L        Labor6012/06/2412/13/241.1w:
312-12-02-L 01          Connect float switches812/06/2412/09/248.0h:
312-12-02-L 02          Connect AC pumps412/09/2412/09/244.0h:
312-12-02-L 03          Connect DC pumps (1)412/10/2412/10/244.0h:
312-12-02-L 04          Connect DC pumps (2)412/10/2412/10/244.0h:
312-12-02-L 05          Connect DC pumps (3)412/11/2412/11/244.0h:
312-12-02-L 06          Connect DC pumps (4)412/11/2412/11/244.0h:
312-12-02-L 07          Connect high level switch wiring (1)412/12/2412/12/244.0h:
312-12-02-L 08          Connect high level switch wiring (2)412/12/2412/12/244.0h:
312-12-02-L 09          Connect high level switch wiring (3)412/13/2412/13/244.0h:
312-12-02-L 10          Connect high level switch wiring (4)412/13/2412/13/244.0h:
312-12-02-L 11          Connect pump monitoring1612/12/2412/13/2416.0h:
314  Fuel oil7612/10/2412/13/242.9w:
314-12    Electrical7612/10/2412/13/240.7w:
314-12-01      Rough-in circuits5612/10/2412/13/2428.0h:
314-12-01-L        Labor5612/10/2412/13/240.7w:
314-12-01-L 01          Install AC pump wiring3212/10/2412/12/2416.0h:
314-12-01-L 02          Install monitoring wiring2412/12/2412/13/2412.0h:
314-12-02      Install/Connect2012/11/2412/13/2420.0h:
314-12-02-L        Labor2012/11/2412/13/240.5w:
314-12-02-L 01          Connect pumps812/11/2412/12/248.0h:
314-12-02-L 02          Connect monitoring1212/12/2412/13/2412.0h:
321  Bowthruster system7212/09/2412/13/241.0w:
321-12    Electrical7212/09/2412/13/2440.0h:
321-12-01      Rough-in circuits3212/10/2412/13/2432.0h:
321-12-01-L        Labor3212/10/2412/13/240.8w:
321-12-01-L 01          Rough in wiring to windlass 812/10/2412/10/248.0h:
321-12-01-L 02          Rough in wiring to windlass switches812/11/2412/11/248.0h:
321-12-01-L 03          Rough in wiring to control unit812/12/2412/12/248.0h:
321-12-01-L 04          Rough in monitor wiring812/13/2412/13/248.0h:
321-12-02      Install/Connect4012/09/2412/13/2440.0h:
321-12-02-L        Labor4012/09/2412/13/241.0w:
321-12-02-L 01          Connect control unit812/09/2412/09/248.0h:
321-12-02-L 02          Connect anchor windlass 812/10/2412/10/248.0h:
321-12-02-L 03          Connect anchor switches812/11/2412/11/248.0h:
321-12-02-L 04          Connect control panels812/12/2412/12/248.0h:
321-12-02-L 05          Connect monitor wiring812/13/2412/13/248.0h:
322  Stabilizers7212/09/2412/13/2467.2w:
322-12    Electrical7212/09/2412/13/241.0w:
322-12-01      Rough-in circuits3212/10/2412/13/2432.0h:
322-12-01-L        Labor3212/10/2412/13/240.8w:
322-12-01-L 01          Rough in wiring to windlass 812/10/2412/10/248.0h:
322-12-01-L 02          Rough in wiring to windlass switches812/11/2412/11/248.0h:
322-12-01-L 03          Rough in wiring to control unit812/12/2412/12/248.0h:
322-12-01-L 04          Rough in monitor wiring812/13/2412/13/248.0h:
322-12-02      Install/Connect4012/09/2412/13/2440.0h:
322-12-02-L        Labor4012/09/2412/13/241.0w:
322-12-02-L 01          Connect control unit812/09/2412/09/248.0h:
322-12-02-L 02          Connect anchor windlass 812/10/2412/10/248.0h:
322-12-02-L 03          Connect anchor switches812/11/2412/11/248.0h:
322-12-02-L 04          Connect control panels812/12/2412/12/248.0h:
322-12-02-L 05          Connect monitor wiring812/13/2412/13/248.0h:
323  Anchor7212/09/2412/13/2410.0w:
323-12    Electrical7212/09/2412/13/241.0w:
323-12-01      Rough-in circuits3212/10/2412/13/2432.0h:
323-12-01-L        Labor3212/10/2412/13/240.8w:
323-12-01-L 01          Rough in wiring to windlass 812/10/2412/10/248.0h:
323-12-01-L 02          Rough in wiring to windlass switches812/11/2412/11/248.0h:
323-12-01-L 03          Rough in wiring to control unit812/12/2412/12/248.0h:
323-12-01-L 04          Rough in monitor wiring812/13/2412/13/248.0h:
323-12-02      Install/Connect4012/09/2412/13/2440.0h:
323-12-02-L        Labor4012/09/2412/13/241.0w:
323-12-02-L 01          Connect control unit812/09/2412/09/248.0h:
323-12-02-L 02          Connect anchor windlass 812/10/2412/10/248.0h:
323-12-02-L 03          Connect anchor switches812/11/2412/11/248.0h:
323-12-02-L 04          Connect control panels812/12/2412/12/248.0h:
323-12-02-L 05          Connect monitor wiring812/13/2412/13/248.0h:
324  Capstans2412/12/2412/13/243.1w:
324-12    Electrical2412/12/2412/13/240.3w:
324-12-01      Rough-in circuits1212/12/2412/13/2412.0h:
324-12-01-L        Labor1212/12/2412/13/240.3w:
324-12-01-L 01          Install control system wiring412/12/2412/12/244.0h:
324-12-01-L 02          Install foot switch wiring (P)412/13/2412/13/244.0h:
324-12-01-L 03          Install foot switch wiring (S)412/13/2412/13/244.0h:
324-12-02      Install/Connect1212/12/2412/13/2412.0h:
324-12-02-L        Labor1212/12/2412/13/240.3w:
324-12-02-L 01          Connect control panels412/12/2412/12/244.0h:
324-12-02-L 02          Connect foot switch (P)412/13/2412/13/244.0h:
324-12-02-L 03          Connect foot switch (S)412/13/2412/13/244.0h:
325  Steering7212/09/2412/13/241.0w:
325-12    Electrical7212/09/2412/13/241.0w:
325-12-01      Rough-in circuits3212/10/2412/13/2432.0h:
325-12-01-L        Labor3212/10/2412/13/240.8w:
325-12-01-L 01          Rough in wiring to windlass 812/10/2412/10/248.0h:
325-12-01-L 02          Rough in wiring to windlass switches812/11/2412/11/248.0h:
325-12-01-L 03          Rough in wiring to control unit812/12/2412/12/248.0h:
325-12-01-L 04          Rough in monitor wiring812/13/2412/13/248.0h:
325-12-02      Install/Connect4012/09/2412/13/2440.0h:
325-12-02-L        Labor4012/09/2412/13/241.0w:
325-12-02-L 01          Connect control unit812/09/2412/09/248.0h:
325-12-02-L 02          Connect anchor windlass 812/10/2412/10/248.0h:
325-12-02-L 03          Connect anchor switches812/11/2412/11/248.0h:
325-12-02-L 04          Connect control panels812/12/2412/12/248.0h:
325-12-02-L 05          Connect monitor wiring812/13/2412/13/248.0h:
330  Watermakers2812/12/2412/13/241.5w:
330-12    Electrical2812/12/2412/13/2416.0h:
330-12-01      Rough-in circuits1612/12/2412/13/2416.0h:
330-12-01-L        Labor1612/12/2412/13/240.4w:
330-12-01-L 01          Install system wiring and circuit1612/12/2412/13/2416.0h:
330-12-02      Install/Connect1212/12/2412/13/2412.0h:
330-12-02-L        Labor1212/12/2412/13/240.3w:
330-12-02-L 01          Connect control panel & pumps1212/12/2412/13/2412.0h:
4ENGINE ROOM90011/28/2412/13/2413.7w:
401  Insulation9212/04/2412/13/242.0w:
401-12    Electrical9212/04/2412/13/2460.0h:
401-12-01      Rough-in circuits6012/04/2412/13/2460.0h:
401-12-01-L        Labor6012/04/2412/13/241.5w:
401-12-01-L 01          Install overhead lighting circuit1612/04/2412/06/2416.0h:
401-12-01-L 02          Install strobe lighting circuit1212/06/2412/09/2412.0h:
401-12-01-L 03          Install emergency lighting circuit812/10/2412/10/248.0h:
401-12-01-L 04          Install outlet circuits812/11/2412/11/248.0h:
401-12-01-L 05          Install phone/Cat 5 cables812/12/2412/12/248.0h:
401-12-01-L 06          Install fire monitoring cable812/13/2412/13/248.0h:
401-12-02      Install/Connect3212/10/2412/13/2432.0h:
401-12-02-L        Labor3212/10/2412/13/240.8w:
401-12-02-L 01          Install/connect overhead lighting812/10/2412/10/248.0h:
401-12-02-L 02          Install/connect strobe lighting412/11/2412/11/244.0h:
401-12-02-L 03          Install/connect emergency lighting412/11/2412/11/244.0h:
401-12-02-L 04          Install/connect outlet812/12/2412/12/248.0h:
401-12-02-L 05          Install/connect phone/Cat 5 outlets412/13/2412/13/244.0h:
401-12-02-L 06          Install/connect fire monitoring sensor412/13/2412/13/244.0h:
405  Main engine Installation26411/29/2412/13/2413.7w:
405-12    Electrical26411/29/2412/13/242.2w:
405-12-01      Rough-in Circuits8811/29/2412/13/2488.0h:
405-12-01-L        Labor8811/29/2412/13/242.2w:
405-12-01-L 01          Install engine room control module (P)1211/29/2412/02/2412.0h:
405-12-01-L 02          Install engine room control module (S)1212/02/2412/03/2412.0h:
405-12-01-L 03          Install engine room interface module (P)1212/04/2412/05/2412.0h:
405-12-01-L 04          Install engine room interface module (S)1212/05/2412/06/2412.0h:
405-12-01-L 05          Connect engine control module cables (P)812/09/2412/09/248.0h:
405-12-01-L 06          Connect engine control module cables (S)812/10/2412/10/248.0h:
405-12-01-L 07          Connect power supply panels2412/11/2412/13/2424.0h:
405-12-02      Port Generator Connection8811/29/2412/13/2488.0h:
405-12-02-L        Labor8811/29/2412/13/242.2w:
405-12-02-L 01          Install engine room control module (P)1211/29/2412/02/2412.0h:
405-12-02-L 02          Install engine room control module (S)1212/02/2412/03/2412.0h:
405-12-02-L 03          Install engine room interface module (P)1212/04/2412/05/2412.0h:
405-12-02-L 04          Install engine room interface module (S)1212/05/2412/06/2412.0h:
405-12-02-L 05          Connect engine control module cables (P)812/09/2412/09/248.0h:
405-12-02-L 06          Connect engine control module cables (S)812/10/2412/10/248.0h:
405-12-02-L 07          Connect power supply panels2412/11/2412/13/2424.0h:
405-12-03      STBD Generator Connection8811/29/2412/13/2488.0h:
405-12-03-L        Labor8811/29/2412/13/242.2w:
405-12-03-L 01          Install engine room control module (P)1211/29/2412/02/2412.0h:
405-12-03-L 02          Install engine room control module (S)1212/02/2412/03/2412.0h:
405-12-03-L 03          Install engine room interface module (P)1212/04/2412/05/2412.0h:
405-12-03-L 04          Install engine room interface module (S)1212/05/2412/06/2412.0h:
405-12-03-L 05          Connect engine control module cables (P)812/09/2412/09/248.0h:
405-12-03-L 06          Connect engine control module cables (S)812/10/2412/10/248.0h:
405-12-03-L 07          Connect power supply panels2412/11/2412/13/2424.0h:
410  Generators34411/28/2412/13/242.4w:
410-12    Electrical34411/28/2412/13/242.4w:
410-12-01      Brackets/Foundations2412/11/2412/13/2424.0h:
410-12-01-L        Labor2412/11/2412/13/240.6w:
410-12-01-L 01          Install wire trays/brackets2412/11/2412/13/2424.0h:
410-12-02      Rough-in Circuits19211/28/2412/13/2496.0h:
410-12-02-L        Labor19211/28/2412/13/242.4w:
410-12-02-L 01          Install supply cable to main panel (P)4811/28/2412/02/2424.0h:
410-12-02-L 02          Install supply cable to main panel (S)4812/03/2412/05/2424.0h:
410-12-02-L 03          Install remote panel cables (P)2412/06/2412/09/2412.0h:
410-12-02-L 04          Install remote panel cables (S)2412/09/2412/10/2412.0h:
410-12-02-L 05          Install remote stop starts circuits4812/11/2412/13/2424.0h:
410-12-03      Port Generator Connection6412/04/2412/13/2464.0h:
410-12-03-L        Labor6412/04/2412/13/241.6w:
410-12-03-L 01          Connect main feed cables to generator (P)1612/04/2412/05/2416.0h:
410-12-03-L 02          Connect main feed cables to generator (S)1612/06/2412/09/2416.0h:
410-12-03-L 03          Connect remote panel cables1612/10/2412/11/2416.0h:
410-12-03-L 04          Connect starting cables1612/12/2412/13/2416.0h:
410-12-04      STBD Generator Connection6412/04/2412/13/2464.0h:
410-12-04-L        Labor6412/04/2412/13/241.6w:
410-12-04-L 01          Connect main feed cables to generator (P)1612/04/2412/05/2416.0h:
410-12-04-L 02          Connect main feed cables to generator (S)1612/06/2412/09/2416.0h:
410-12-04-L 03          Connect remote panel cables1612/10/2412/11/2416.0h:
410-12-04-L 04          Connect starting cables1612/12/2412/13/2416.0h:
420  Lube oil2012/12/2412/13/242.2w:
420-12    Electrical2012/12/2412/13/240.3w:
420-12-01      Rough-in circuits1212/12/2412/13/2412.0h:
420-12-01-L        Labor1212/12/2412/13/240.3w:
420-12-01-L 01          Install system wiring and circuit1212/12/2412/13/2412.0h:
420-12-02      Install/Connect812/13/2412/13/248.0h:
420-12-02-L        Labor812/13/2412/13/240.2w:
420-12-02-L 01          Connect pumps812/13/2412/13/248.0h:
421  Fire suppression4812/11/2412/13/241.5w:
421-12    Electrical4812/11/2412/13/240.6w:
421-12-01      Rough-in Circuits2412/11/2412/13/2424.0h:
421-12-01-L        Labor2412/11/2412/13/240.6w:
421-12-01-L 01          Install circuits to control panels2412/11/2412/13/2424.0h:
421-12-02      Install/Connect2412/11/2412/13/2424.0h:
421-12-02-A        Labor2412/11/2412/13/240.6w:
421-12-02-A 01          Connect control panels2412/11/2412/13/2424.0h:
422  Engine ventilation13212/06/2412/13/241.7w:
422-12    Electrical13212/06/2412/13/241.1w:
422-12-01      Rough-in Circuits4412/06/2412/13/2444.0h:
422-12-01-L        Labor4412/06/2412/13/241.1w:
422-12-01-L 01          Install circuit to fan (P)1212/06/2412/09/2412.0h:
422-12-01-L 02          Install circuit to fan (S)1212/10/2412/11/2412.0h:
422-12-01-L 03          Install power supply to modules812/11/2412/12/248.0h:
422-12-01-L 04          Install sensor cables1212/12/2412/13/2412.0h:
422-12-02      Port Fan Connection4412/06/2412/13/2444.0h:
422-12-02-L        Labor4412/06/2412/13/241.1w:
422-12-02-L 01          Connect control system1612/06/2412/10/2416.0h:
422-12-02-L 02          Connect intake fan812/10/2412/11/248.0h:
422-12-02-L 03          Connect exhaust fan812/11/2412/12/248.0h:
422-12-02-L 04          Connect all sensors1212/12/2412/13/2412.0h:
422-12-03      STBD Fan Connection4412/06/2412/13/2444.0h:
422-12-03-L        Labor4412/06/2412/13/241.1w:
422-12-03-L 01          Connect control system1612/06/2412/10/2416.0h:
422-12-03-L 02          Connect intake fan812/10/2412/11/248.0h:
422-12-03-L 03          Connect exhaust fan812/11/2412/12/248.0h:
422-12-03-L 04          Connect all sensors1212/12/2412/13/2412.0h:
5ELECTRICAL3,66011/04/2412/13/246.0w:
501  Cable Prepatations36811/18/2412/13/244.0w:
501-12    Electrical36811/18/2412/13/244.0w:
501-12-01      Cable Trays32011/18/2412/13/24160.0h:
501-12-01-L        Labor32011/18/2412/13/244.0w:
501-12-01-L 01          Lower deck cable trays12011/18/2411/27/2460.0h:
501-12-01-L 02          Engine room deck cable trays8011/27/2412/04/2440.0h:
501-12-01-L 03          Main deck cable trays12012/04/2412/13/2460.0h:
501-12-16      WT penetrations4812/11/2412/13/2424.0h:
501-12-16-L        Labor4812/11/2412/13/240.6w:
501-12-16-L 01          Install WT penetrations4812/11/2412/13/2424.0h:
502  Cable Routing52811/04/2412/13/246.0w:
502-12    Electrical52811/04/2412/13/246.0w:
502-12-23      Rough-in circuits48011/04/2412/13/24240.0h:
502-12-23-L        Labor48011/04/2412/13/246.0w:
502-12-23-L 01          Rough-in feed to lower Guest sub panel16011/04/2411/15/2480.0h:
502-12-23-L 02          Rough-in feed to galley sub panel16011/18/2411/29/2480.0h:
502-12-23-L 03          Rough-in feed to main deck sub panel16012/02/2412/13/2480.0h:
502-12-24      WT penetrations4812/11/2412/13/2424.0h:
502-12-24-L        Labor4812/11/2412/13/240.6w:
502-12-24-L 01          Install WT penetrations4812/11/2412/13/2424.0h:
505  AC Main Distribution panel20811/08/2412/13/245.2w:
505-12    Electrical20811/08/2412/13/24208.0h:
505-12-02      Connect20811/08/2412/13/24208.0h:
505-12-02-L        Labor20811/08/2412/13/245.2w:
505-12-02-L 01          Connect Gen 1 supply to main panel1611/08/2411/11/2416.0h:
505-12-02-L 02          Connect Gen 2 supply to main panel1611/12/2411/13/2416.0h:
505-12-02-L 03          Connect shorepower supply to main panel1611/14/2411/15/2416.0h:
505-12-02-L 04          Connect all main distribution wiring16011/18/2412/13/24160.0h:
506  AC Sub panels14412/03/2412/13/241.8w:
506-12    Electrical14412/03/2412/13/2472.0h:
506-12-01      Install2412/11/2412/13/2424.0h:
506-12-01-L        Labor2412/11/2412/13/240.6w:
506-12-01-L 01          Install AC sub panel 1812/11/2412/11/248.0h:
506-12-01-L 02          Install AC sub panel 2812/12/2412/12/248.0h:
506-12-01-L 03          Install AC sub panel 3812/13/2412/13/248.0h:
506-12-02      Connect12012/03/2412/13/2472.0h:
506-12-02-L        Labor12012/03/2412/13/241.8w:
506-12-02-L 01          Connect AC sub panel 12412/03/2412/05/2424.0h:
506-12-02-L 02          Connect AC sub panel 22412/06/2412/10/2424.0h:
506-12-02-L 03          Connect AC sub panel 32412/11/2412/13/2424.0h:
506-12-02-L 04          Connect AC sub panel 42412/11/2412/13/2424.0h:
506-12-02-L 05          Connect AC sub panel 52412/11/2412/13/2424.0h:
507  DC Distribution panels8412/04/2412/13/241.5w:
507-12    Electrical8412/04/2412/13/2460.0h:
507-12-01      Assembly2412/11/2412/13/2424.0h:
507-12-01-L        Labor2412/11/2412/13/240.6w:
507-12-01-L 01          Assemble DC sub panel 11212/11/2412/12/2412.0h:
507-12-01-L 02          Assemble DC sub panel 21212/12/2412/13/2412.0h:
507-12-02      Install/Connect6012/04/2412/13/2460.0h:
507-12-02-L        Labor6012/04/2412/13/241.5w:
507-12-02-L 01          Install all DC sub panels1212/04/2412/05/2412.0h:
507-12-02-L 02          Connect DC sub panel 12412/06/2412/10/2424.0h:
507-12-02-L 03          Connect DC sub panel 22412/11/2412/13/2424.0h:
510  Shore power11211/27/2412/13/242.5w:
510-12    Electrical11211/27/2412/13/24100.0h:
510-12-01      Rough-in circuits - P3212/11/2412/13/2421.0h:
510-12-01-L        Labor3212/12/2412/13/240.4w:
510-12-01-L 01          Install power cables to shore 13212/12/2412/13/2416.0h:
510-12-03      Rough-in circuits - S3212/11/2412/13/2421.0h:
510-12-03-L        Labor3212/12/2412/13/240.4w:
510-12-03-L 01          Install power cables to shore 13212/12/2412/13/2416.0h:
510-12-02      Install/Connect - P 2411/27/2412/13/24100.0h:
510-12-02-L        Labor2412/11/2412/13/240.6w:
510-12-02-L 01          Install/connect shore power outlets2412/11/2412/13/2424.0h:
510-12-04      Install/Connect - S 2411/27/2412/13/24100.0h:
510-12-04-L        Labor2412/11/2412/13/240.6w:
510-12-04-L 01          Install/connect shore power outlets2412/11/2412/13/2424.0h:
511  Batteries16012/06/2412/13/241.2w:
511-12    Electrical16012/06/2412/13/2448.0h:
511-12-02      Rough-in circuits5612/09/2412/13/2440.0h:
511-12-02-L        Labor5612/09/2412/13/241.0w:
511-12-02-L 01          Rough-in house battery cable2412/09/2412/11/2424.0h:
511-12-02-L 02          Rough-in Port generator battery cable1612/12/2412/13/2416.0h:
511-12-02-L 03          Rough-in Port ME battery cable1612/12/2412/13/2416.0h:
511-12-03      Install equipment3212/10/2412/13/2432.0h:
511-12-03-L        Labor3212/10/2412/13/240.8w:
511-12-03-L 01          Install battery boxes1612/10/2412/11/2416.0h:
511-12-03-L 02          Install/connect Switches/Isolators1612/12/2412/13/2416.0h:
511-12-04      Connect7212/06/2412/13/2448.0h:
511-12-04-L        Labor7212/06/2412/13/241.2w:
511-12-04-L 01          Connect house batteries2412/06/2412/10/2424.0h:
511-12-04-L 02          Connect Port generator batteries2412/11/2412/13/2424.0h:
511-12-04-L 03          Connect Port ME batteries2412/11/2412/13/2424.0h:
512  Battery management16012/04/2412/13/241.6w:
512-12    Electrical16012/04/2412/13/2464.0h:
512-12-01      Equipment - P6412/04/2412/13/2464.0h:
512-12-01-L        Labor6412/04/2412/13/241.6w:
512-12-01-L 01          Install power supply cables3212/04/2412/09/2432.0h:
512-12-01-L 02          Install battery supply cables3212/10/2412/13/2432.0h:
512-12-03      Equipment - S6412/04/2412/13/2464.0h:
512-12-03-L        Labor6412/04/2412/13/241.6w:
512-12-03-L 01          Install power supply cables3212/04/2412/09/2432.0h:
512-12-03-L 02          Install battery supply cables3212/10/2412/13/2432.0h:
512-12-02      Install/Connect - P 1612/12/2412/13/2416.0h:
512-12-02-L        Labor1612/12/2412/13/240.4w:
512-12-02-L 01          Install/connect battery chargers1612/12/2412/13/2416.0h:
512-12-04      Install/Connect - S1612/12/2412/13/2416.0h:
512-12-04-L        Labor1612/12/2412/13/240.4w:
512-12-04-L 01          Install/connect battery chargers1612/12/2412/13/2416.0h:
514  Solar System8012/04/2412/13/241.6w:
514-12    Electrical8012/04/2412/13/2464.0h:
514-12-01      Equipment6412/04/2412/13/2464.0h:
514-12-01-L        Labor6412/04/2412/13/241.6w:
514-12-01-L 01          Install power supply cables3212/04/2412/09/2432.0h:
514-12-01-L 02          Install battery supply cables3212/10/2412/13/2432.0h:
514-12-02      Install/Connect1612/12/2412/13/2416.0h:
514-12-02-L        Labor1612/12/2412/13/240.4w:
514-12-02-L 01          Install/connect battery chargers1612/12/2412/13/2416.0h:
515  Grounding3612/11/2412/13/240.6w:
515-12    Electrical3612/11/2412/13/2424.0h:
515-12-01      Rough-in circuits2412/11/2412/13/2424.0h:
515-12-01-L        Labor2412/11/2412/13/240.6w:
515-12-01-L 01          Install supply cables to k-pac2412/11/2412/13/2424.0h:
515-12-02      Install/Connect1212/12/2412/13/2412.0h:
515-12-02-L        Labor1212/12/2412/13/240.3w:
515-12-02-L 01          Install/connect K-pac monitor1212/12/2412/13/2412.0h:
516  Corrosion monitor3612/11/2412/13/240.6w:
516-12    Electrical3612/11/2412/13/2424.0h:
516-12-01      Rough-in circuits2412/11/2412/13/2424.0h:
516-12-01-L        Labor2412/11/2412/13/240.6w:
516-12-01-L 01          Install supply cables to k-pac2412/11/2412/13/2424.0h:
516-12-02      Install/Connect1212/12/2412/13/2412.0h:
516-12-02-L        Labor1212/12/2412/13/240.3w:
516-12-02-L 01          Install/connect K-pac monitor1212/12/2412/13/2412.0h:
520  Lighting - Interior20811/18/2412/13/244.0w:
520-12    Electrical20811/18/2412/13/24160.0h:
520-12-01      Rough-in circuits16011/18/2412/13/24160.0h:
520-12-01-L        Labor16011/18/2412/13/244.0w:
520-12-01-L 01          Install lower deck light circuits4011/18/2411/22/2440.0h:
520-12-01-L 02          Install main deck light circuits4011/25/2411/29/2440.0h:
520-12-01-L 03          Install upper deck light circuits4012/02/2412/06/2440.0h:
520-12-01-L 04          Install wiring to control system4012/09/2412/13/2440.0h:
520-12-02      Install/Connect4812/06/2412/13/2448.0h:
520-12-02-L        Labor4812/06/2412/13/241.2w:
520-12-02-L 01          Connect charger unit812/06/2412/06/248.0h:
520-12-02-L 02          Connect control system1612/09/2412/10/2416.0h:
520-12-02-L 03          Install all down light connectors2412/11/2412/13/2424.0h:
521  Lighting - Exterior 22411/19/2412/13/243.8w:
521-12    Electrical22411/19/2412/13/24152.0h:
521-12-01      Rough-in circuits15211/19/2412/13/24152.0h:
521-12-01-L        Labor15211/19/2412/13/243.8w:
521-12-01-L 01          Install flood light circuits2411/19/2411/21/2424.0h:
521-12-01-L 02          Install search light circuits2411/22/2411/26/2424.0h:
521-12-01-L 03          Install Navigation light circuits2411/27/2411/29/2424.0h:
521-12-01-L 04          Install main deck light/outlet circuits4012/02/2412/06/2440.0h:
521-12-01-L 05          Install flybridge deck light/outlet circuits4012/09/2412/13/2440.0h:
521-12-02      Install/Connect7212/03/2412/13/2472.0h:
521-12-02-L        Labor7212/03/2412/13/241.8w:
521-12-02-L 01          Install all down light connectors1612/03/2412/04/2416.0h:
521-12-02-L 02          Install flood lights1612/05/2412/06/2416.0h:
521-12-02-L 03          Install search light1212/09/2412/10/2412.0h:
521-12-02-L 04          Install navigation lights1612/10/2412/12/2416.0h:
521-12-02-L 05          Install all lights/outlets1212/12/2412/13/2412.0h:
525  Monitoring system24811/25/2412/13/243.0w:
525-12    Electrical24811/25/2412/13/24120.0h:
525-12-01      Rough-in circuits12011/25/2412/13/24120.0h:
525-12-01-L        Labor12011/25/2412/13/243.0w:
525-12-01-L 01          Rough-in all wiring 12011/25/2412/13/24120.0h:
525-12-02      Install/Connect8811/29/2412/13/2488.0h:
525-12-02-L        Labor8811/29/2412/13/242.2w:
525-12-02-L 01          Install control modules811/29/2411/29/248.0h:
525-12-02-L 02          Install all sensors812/02/2412/02/248.0h:
525-12-02-L 03          Connect control modules4012/03/2412/09/2440.0h:
525-12-02-L 04          Connect all sensors3212/10/2412/13/2432.0h:
525-12-03      Finishes4012/09/2412/13/2440.0h:
525-12-03-L        Labor4012/09/2412/13/241.0w:
525-12-03-L 01          calibrate equipment4012/09/2412/13/2440.0h:
526  Fire system18811/25/2412/13/243.0w:
526-12    Electrical18811/25/2412/13/24120.0h:
526-12-01      Rough-in circuits3612/09/2412/13/2436.0h:
526-12-01-L        Labor3612/09/2412/13/240.9w:
526-12-01-L 01          Install lower guest wiring 2412/09/2412/12/2424.0h:
526-12-01-L 02          Install main deck wiring 1212/12/2412/13/2412.0h:
526-12-02      Install/Connect12011/25/2412/13/24120.0h:
526-12-02-L        Labor12011/25/2412/13/243.0w:
526-12-02-L 01          Install/connect control modules2411/25/2411/27/2424.0h:
526-12-02-L 02          Install/connect all sensors4811/28/2412/05/2448.0h:
526-12-02-L 03          Connect to C-Zone4812/06/2412/13/2448.0h:
526-12-03      Finishes3212/10/2412/13/2432.0h:
526-12-03-L        Labor3212/10/2412/13/240.8w:
526-12-03-L 01          Calibrate/test equipment3212/10/2412/13/2432.0h:
527  Safety system18811/25/2412/13/243.0w:
527-12    Electrical18811/25/2412/13/24120.0h:
527-12-01      Rough-in circuits3612/09/2412/13/2436.0h:
527-12-01-L        Labor3612/09/2412/13/240.9w:
527-12-01-L 01          Install lower guest wiring 2412/09/2412/12/2424.0h:
527-12-01-L 02          Install main deck wiring 1212/12/2412/13/2412.0h:
527-12-02      Install/Connect12011/25/2412/13/24120.0h:
527-12-02-L        Labor12011/25/2412/13/243.0w:
527-12-02-L 01          Install/connect control modules2411/25/2411/27/2424.0h:
527-12-02-L 02          Install/connect all sensors4811/28/2412/05/2448.0h:
527-12-02-L 03          Connect to C-Zone4812/06/2412/13/2448.0h:
527-12-03      Finishes3212/10/2412/13/2432.0h:
527-12-03-L        Labor3212/10/2412/13/240.8w:
527-12-03-L 01          Calibrate/test equipment3212/10/2412/13/2432.0h:
528  Security system11212/10/2412/13/240.8w:
528-12    Electrical11212/10/2412/13/2432.0h:
528-12-01      Rough-in circuits4812/10/2412/13/2432.0h:
528-12-01-L        Labor4812/10/2412/13/240.8w:
528-12-01-L 01          Install cables3212/10/2412/13/2432.0h:
528-12-01-L 02          Connect cables1612/12/2412/13/2416.0h:
528-12-02      Install/Connect4812/11/2412/13/2424.0h:
528-12-02-L        Labor4812/11/2412/13/240.6w:
528-12-02-L 01          Install main deck door sensor (Aft)812/13/2412/13/248.0h:
528-12-02-L 02          Install upper deck door sensor (Aft)812/13/2412/13/248.0h:
528-12-02-L 03          Connect main deck door sensor (Aft)812/13/2412/13/248.0h:
528-12-02-L 04          Connect upper deck door sensor (Aft)812/11/2412/11/248.0h:
528-12-02-L 05          Connect sensor to control box1612/12/2412/13/2416.0h:
528-12-03      Finishes1612/12/2412/13/2416.0h:
528-12-03-L        Labor1612/12/2412/13/240.4w:
528-12-03-L 01          Connect sensor to control box1612/12/2412/13/2416.0h:
531  Radar4812/06/2412/13/241.2w:
531-12    Electrical4812/06/2412/13/241.2w:
531-12-01      Radar scanner4812/06/2412/13/2448.0h:
531-12-01-L        Labor4812/06/2412/13/241.2w:
531-12-01-L 01          Install cables3212/06/2412/11/2432.0h:
531-12-01-L 02          Connect cables1612/12/2412/13/2416.0h:
532  Sonar4812/06/2412/13/241.2w:
532-12    Electrical4812/06/2412/13/241.2w:
532-12-01      Depth Sounder4812/06/2412/13/2448.0h:
532-12-01-L        Labor4812/06/2412/13/241.2w:
532-12-01-L 01          Install cables3212/06/2412/11/2432.0h:
532-12-01-L 02          Connect cables1612/12/2412/13/2416.0h:
533  Navigation Sytstems4812/06/2412/13/241.2w:
533-12    Electrical4812/06/2412/13/241.2w:
533-12-01      Navigation/Charts4812/06/2412/13/2448.0h:
533-12-01-L        Labor4812/06/2412/13/241.2w:
533-12-01-L 01          Install cables3212/06/2412/11/2432.0h:
533-12-01-L 02          Connect cables1612/12/2412/13/2416.0h:
534  Instruments9612/06/2412/13/241.2w:
534-12    Electrical9612/06/2412/13/241.2w:
534-12-01      Speed, Depth, Wind4812/06/2412/13/2448.0h:
534-12-01-L        Labor4812/06/2412/13/241.2w:
534-12-01-L 01          Install cables3212/06/2412/11/2432.0h:
534-12-01-L 02          Connect cables1612/12/2412/13/2416.0h:
534-12-02      Displays4812/06/2412/13/2448.0h:
534-12-02-L        Labor4812/06/2412/13/241.2w:
534-12-02-L 01          Install cables3212/06/2412/11/2432.0h:
534-12-02-L 02          Connect cables1612/12/2412/13/2416.0h:
535  Autopilot/compass4812/06/2412/13/241.2w:
535-12    Electrical4812/06/2412/13/241.2w:
535-12-01      Autopilot4812/06/2412/13/2448.0h:
535-12-01-L        Labor4812/06/2412/13/241.2w:
535-12-01-L 01          Install cables3212/06/2412/11/2432.0h:
535-12-01-L 02          Connect cables1612/12/2412/13/2416.0h:
536  AIS4812/06/2412/13/241.2w:
536-12    Electrical4812/06/2412/13/241.2w:
536-12-01      AIS Unit4812/06/2412/13/2448.0h:
536-12-01-L        Labor4812/06/2412/13/241.2w:
536-12-01-L 01          Install cables3212/06/2412/11/2432.0h:
536-12-01-L 02          Connect cables1612/12/2412/13/2416.0h:
538  Communications/Wifi9612/06/2412/13/241.2w:
538-12    Electrical9612/06/2412/13/241.2w:
538-12-01      VHF Radions4812/06/2412/13/2448.0h:
538-12-01-L        Labor4812/06/2412/13/241.2w:
538-12-01-L 01          Install cables3212/06/2412/11/2432.0h:
538-12-01-L 02          Connect cables1612/12/2412/13/2416.0h:
538-12-02      WiFi4812/06/2412/13/2448.0h:
538-12-02-L        Labor4812/06/2412/13/241.2w:
538-12-02-L 01          Install cables3212/06/2412/11/2432.0h:
538-12-02-L 02          Connect cables1612/12/2412/13/2416.0h:
539  Surveilance system4812/06/2412/13/241.2w:
539-12    Electrical4812/06/2412/13/2448.0h:
539-12-01      CCTV4812/06/2412/13/2448.0h:
539-12-01-L        Labor4812/06/2412/13/241.2w:
539-12-01-L 01          Install cables3212/06/2412/11/2432.0h:
539-12-01-L 02          Connect cables1612/12/2412/13/2416.0h:
546  TV/Audio Central Distribution9612/06/2412/13/241.2w:
546-12    Electrical9612/06/2412/13/241.2w:
546-12-01      VHF Radions4812/06/2412/13/2448.0h:
546-12-01-L        Labor4812/06/2412/13/241.2w:
546-12-01-L 01          Install cables3212/06/2412/11/2432.0h:
546-12-01-L 02          Connect cables1612/12/2412/13/2416.0h:
546-12-02      WiFi4812/06/2412/13/2448.0h:
546-12-02-L        Labor4812/06/2412/13/241.2w:
546-12-02-L 01          Install cables3212/06/2412/11/2432.0h:
546-12-02-L 02          Connect cables1612/12/2412/13/2416.0h:
6INTERIOR1,98411/22/2412/13/244.2w:
602  Guest Stateroom 110012/10/2412/13/242.0w:
602-12    Electrical10012/10/2412/13/240.8w:
602-12-01      Rough in3212/10/2412/13/2432.0h:
602-12-01-L        Labor3212/10/2412/13/240.8w:
602-12-01-L 01          Install overhead lighting circuit412/10/2412/10/244.0h:
602-12-01-L 02          Install wall lighting circuit412/10/2412/10/244.0h:
602-12-01-L 03          Install rope lighting circuit412/11/2412/11/244.0h:
602-12-01-L 04          Install emergency lighting circuit412/11/2412/11/244.0h:
602-12-01-L 05          Install outlet circuits412/12/2412/12/244.0h:
602-12-01-L 06          Install AC supply circuit412/12/2412/12/244.0h:
602-12-01-L 07          Install AC Keypad cable412/13/2412/13/244.0h:
602-12-01-L 08          Install fire monitoring cable412/13/2412/13/244.0h:
602-12-02      Intsall/ Connect3212/10/2412/13/2432.0h:
602-12-02-E        Electrical412/13/2412/13/2424.0h:
602-12-02-E 01          Lights/Switches412/13/2412/13/2424.0h:
602-12-02-E 01-7            Install/connect fire monitoring sensor412/13/2412/13/244.0h:
602-12-02-L        Labor2812/10/2412/13/240.7w:
602-12-02-L 01          Connect AC supply412/10/2412/10/244.0h:
602-12-02-L 02          Connect AC keypad412/10/2412/10/244.0h:
602-12-02-L 03          Install/connect overhead lighting412/11/2412/11/244.0h:
602-12-02-L 04          Install/connect wall lighting412/11/2412/11/244.0h:
602-12-02-L 05          Install/connect rope lighting412/12/2412/12/244.0h:
602-12-02-L 06          Install/connect emergency lighting412/12/2412/12/244.0h:
602-12-02-L 07          Install/connect outlet412/13/2412/13/244.0h:
602-12-03      TV/Audio3212/12/2412/13/2416.0h:
602-12-03-L        Labor3212/12/2412/13/240.4w:
602-12-03-L 01          Install TV power supply412/12/2412/12/244.0h:
602-12-03-L 02          Install stereo power supply412/12/2412/12/244.0h:
602-12-03-L 03          Install TV signal cable412/13/2412/13/244.0h:
602-12-03-L 04          Install speaker cables412/13/2412/13/244.0h:
602-12-03-L 05          Connect TV power supply412/12/2412/12/244.0h:
602-12-03-L 06          Connect stereo power supply412/12/2412/12/244.0h:
602-12-03-L 07          Connect TV signal cable412/13/2412/13/244.0h:
602-12-03-L 08          Connect speaker cables412/13/2412/13/244.0h:
602-12-04      Finish trims412/13/2412/13/244.0h:
602-12-04-L        Labor412/13/2412/13/240.1w:
602-12-04-L 01          Install finish trim412/13/2412/13/244.0h:
603  Guest Bathroom 14012/11/2412/13/242.4w:
603-12    Electrical4012/11/2412/13/240.6w:
603-12-01      Rough in circuits2412/11/2412/13/2424.0h:
603-12-01-L        Labor2412/11/2412/13/240.6w:
603-12-01-L 01          Install overhead lighting circuit412/11/2412/11/244.0h:
603-12-01-L 02          Install wall lighting circuit412/11/2412/11/244.0h:
603-12-01-L 03          Install rope lighting circuit412/12/2412/12/244.0h:
603-12-01-L 04          Install vent fan circuits412/12/2412/12/244.0h:
603-12-01-L 05          Install outlet circuits412/13/2412/13/244.0h:
603-12-01-L 06          Install toilet soleniod cable412/13/2412/13/244.0h:
603-12-02      Install/Connect1212/12/2412/13/2412.0h:
603-12-02-L        Labor1212/12/2412/13/240.3w:
603-12-02-L 01          Install/connect overhead lighting212/12/2412/12/242.0h:
603-12-02-L 02          Install/connect wall lighting212/12/2412/12/242.0h:
603-12-02-L 03          Install/connect rope lighting212/13/2412/13/242.0h:
603-12-02-L 04          Install/connect vent fan212/13/2412/13/242.0h:
603-12-02-L 05          Install/connect outlet212/13/2412/13/242.0h:
603-12-02-L 06          Install/connect toilet soleniod cable212/13/2412/13/242.0h:
603-12-03      Finish trims412/13/2412/13/244.0h:
603-12-03-L        Labor412/13/2412/13/240.1w:
603-12-03-L 01          Install finish trim412/13/2412/13/244.0h:
604  Guest Stateroom 210812/09/2412/13/242.2w:
604-12    Electrical10812/09/2412/13/240.9w:
604-12-01      Rough in3612/09/2412/13/2436.0h:
604-12-01-L        Labor3612/09/2412/13/240.9w:
604-12-01-L 01          Install overhead lighting circuit412/09/2412/09/244.0h:
604-12-01-L 02          Install wall lighting circuit412/10/2412/10/244.0h:
604-12-01-L 03          Install rope lighting circuit412/10/2412/10/244.0h:
604-12-01-L 04          Install emergency lighting circuit412/11/2412/11/244.0h:
604-12-01-L 05          Install outlet circuits412/11/2412/11/244.0h:
604-12-01-L 06          Install AC supply circuit412/12/2412/12/244.0h:
604-12-01-L 07          Install AC Keypad cable412/12/2412/12/244.0h:
604-12-01-L 08          Install DC charging staion412/13/2412/13/244.0h:
604-12-01-L 09          Install fire monitoring cable412/13/2412/13/244.0h:
604-12-02      Intsall/ Connect3612/09/2412/13/2436.0h:
604-12-02-L        Labor3612/09/2412/13/240.9w:
604-12-02-L 01          Connect AC supply412/09/2412/09/244.0h:
604-12-02-L 02          Connect AC keypad412/10/2412/10/244.0h:
604-12-02-L 03          Install/connect overhead lighting412/10/2412/10/244.0h:
604-12-02-L 04          Install/connect wall lighting412/11/2412/11/244.0h:
604-12-02-L 05          Install/connect rope lighting412/11/2412/11/244.0h:
604-12-02-L 06          Install/connect emergency lighting412/12/2412/12/244.0h:
604-12-02-L 07          Install/connect outlet412/12/2412/12/244.0h:
604-12-02-L 08          Install/connect DC charging staion412/13/2412/13/244.0h:
604-12-02-L 09          Install/connect fire monitoring sensor412/13/2412/13/244.0h:
604-12-03      TV/Audio3212/12/2412/13/2416.0h:
604-12-03-L        Labor3212/12/2412/13/240.4w:
604-12-03-L 01          Install TV power supply412/12/2412/12/244.0h:
604-12-03-L 02          Install stereo power supply412/12/2412/12/244.0h:
604-12-03-L 03          Install TV signal cable412/13/2412/13/244.0h:
604-12-03-L 04          Install speaker cables412/13/2412/13/244.0h:
604-12-03-L 05          Connect TV power supply412/12/2412/12/244.0h:
604-12-03-L 06          Connect stereo power supply412/12/2412/12/244.0h:
604-12-03-L 07          Connect TV signal cable412/13/2412/13/244.0h:
604-12-03-L 08          Connect speaker cables412/13/2412/13/244.0h:
604-12-04      Finish trims412/13/2412/13/244.0h:
604-12-04-L        Labor412/13/2412/13/240.1w:
604-12-04-L 01          Install finish trim412/13/2412/13/244.0h:
605  Guest Bathroom 24012/11/2412/13/242.4w:
605-12    Electrical4012/11/2412/13/240.6w:
605-12-01      Rough in circuits2412/11/2412/13/2424.0h:
605-12-01-L        Labor2412/11/2412/13/240.6w:
605-12-01-L 01          Install overhead lighting circuit412/11/2412/11/244.0h:
605-12-01-L 02          Install wall lighting circuit412/11/2412/11/244.0h:
605-12-01-L 03          Install rope lighting circuit412/12/2412/12/244.0h:
605-12-01-L 04          Install vent fan circuits412/12/2412/12/244.0h:
605-12-01-L 05          Install outlet circuits412/13/2412/13/244.0h:
605-12-01-L 06          Install toilet soleniod cable412/13/2412/13/244.0h:
605-12-02      Install/Connect1212/12/2412/13/2412.0h:
605-12-02-L        Labor1212/12/2412/13/240.3w:
605-12-02-L 01          Install/connect overhead lighting212/12/2412/12/242.0h:
605-12-02-L 02          Install/connect wall lighting212/12/2412/12/242.0h:
605-12-02-L 03          Install/connect rope lighting212/13/2412/13/242.0h:
605-12-02-L 04          Install/connect vent fan212/13/2412/13/242.0h:
605-12-02-L 05          Install/connect outlet212/13/2412/13/242.0h:
605-12-02-L 06          Install/connect toilet soleniod cable212/13/2412/13/242.0h:
605-12-03      Finish trims412/13/2412/13/244.0h:
605-12-03-L        Labor412/13/2412/13/240.1w:
605-12-03-L 01          Install finish trim412/13/2412/13/244.0h:
606  Guest Stateroom 310012/10/2412/13/242.9w:
606-12    Electrical10012/10/2412/13/240.8w:
606-12-01      Rough in3212/10/2412/13/2432.0h:
606-12-01-L        Labor3212/10/2412/13/240.8w:
606-12-01-L 01          Install overhead lighting circuit412/10/2412/10/244.0h:
606-12-01-L 02          Install wall lighting circuit412/10/2412/10/244.0h:
606-12-01-L 03          Install rope lighting circuit412/11/2412/11/244.0h:
606-12-01-L 04          Install emergency lighting circuit412/11/2412/11/244.0h:
606-12-01-L 05          Install outlet circuits412/12/2412/12/244.0h:
606-12-01-L 06          Install AC supply circuit412/12/2412/12/244.0h:
606-12-01-L 07          Install AC Keypad cable412/13/2412/13/244.0h:
606-12-01-L 08          Install fire monitoring cable412/13/2412/13/244.0h:
606-12-02      Intsall/ Connect3212/10/2412/13/2432.0h:
606-12-02-L        Labor3212/10/2412/13/240.8w:
606-12-02-L 01          Connect AC supply412/10/2412/10/244.0h:
606-12-02-L 02          Connect AC keypad412/10/2412/10/244.0h:
606-12-02-L 03          Install/connect overhead lighting412/11/2412/11/244.0h:
606-12-02-L 04          Install/connect wall lighting412/11/2412/11/244.0h:
606-12-02-L 05          Install/connect rope lighting412/12/2412/12/244.0h:
606-12-02-L 06          Install/connect emergency lighting412/12/2412/12/244.0h:
606-12-02-L 07          Install/connect outlet412/13/2412/13/244.0h:
606-12-02-L 08          Install/connect fire monitoring sensor412/13/2412/13/244.0h:
606-12-03      TV/Audio3212/12/2412/13/2416.0h:
606-12-03-L        Labor3212/12/2412/13/240.4w:
606-12-03-L 01          Install TV power supply412/12/2412/12/244.0h:
606-12-03-L 02          Install stereo power supply412/12/2412/12/244.0h:
606-12-03-L 03          Install TV signal cable412/13/2412/13/244.0h:
606-12-03-L 04          Install speaker cables412/13/2412/13/244.0h:
606-12-03-L 05          Connect TV power supply412/12/2412/12/244.0h:
606-12-03-L 06          Connect stereo power supply412/12/2412/12/244.0h:
606-12-03-L 07          Connect TV signal cable412/13/2412/13/244.0h:
606-12-03-L 08          Connect speaker cables412/13/2412/13/244.0h:
606-12-04      Finish trims412/13/2412/13/244.0h:
606-12-04-L        Labor412/13/2412/13/240.1w:
606-12-04-L 01          Install finish trim412/13/2412/13/244.0h:
607  Guest Bathroom 34012/11/2412/13/242.4w:
607-12    Electrical4012/11/2412/13/240.6w:
607-12-01      Rough in circuits2412/11/2412/13/2424.0h:
607-12-01-L        Labor2412/11/2412/13/240.6w:
607-12-01-L 01          Install overhead lighting circuit412/11/2412/11/244.0h:
607-12-01-L 02          Install wall lighting circuit412/11/2412/11/244.0h:
607-12-01-L 03          Install rope lighting circuit412/12/2412/12/244.0h:
607-12-01-L 04          Install vent fan circuits412/12/2412/12/244.0h:
607-12-01-L 05          Install outlet circuits412/13/2412/13/244.0h:
607-12-01-L 06          Install toilet soleniod cable412/13/2412/13/244.0h:
607-12-02      Install/Connect1212/12/2412/13/2412.0h:
607-12-02-L        Labor1212/12/2412/13/240.3w:
607-12-02-L 01          Install/connect overhead lighting212/12/2412/12/242.0h:
607-12-02-L 02          Install/connect wall lighting212/12/2412/12/242.0h:
607-12-02-L 03          Install/connect rope lighting212/13/2412/13/242.0h:
607-12-02-L 04          Install/connect vent fan212/13/2412/13/242.0h:
607-12-02-L 05          Install/connect outlet212/13/2412/13/242.0h:
607-12-02-L 06          Install/connect toilet soleniod cable212/13/2412/13/242.0h:
607-12-03      Finish trims412/13/2412/13/244.0h:
607-12-03-L        Labor412/13/2412/13/240.1w:
607-12-03-L 01          Install finish trim412/13/2412/13/244.0h:
608  Guest Stateroom 410012/10/2412/13/242.9w:
608-12    Electrical10012/10/2412/13/240.8w:
608-12-01      Rough in3212/10/2412/13/2432.0h:
608-12-01-L        Labor3212/10/2412/13/240.8w:
608-12-01-L 01          Install overhead lighting circuit412/10/2412/10/244.0h:
608-12-01-L 02          Install wall lighting circuit412/10/2412/10/244.0h:
608-12-01-L 03          Install rope lighting circuit412/11/2412/11/244.0h:
608-12-01-L 04          Install emergency lighting circuit412/11/2412/11/244.0h:
608-12-01-L 05          Install outlet circuits412/12/2412/12/244.0h:
608-12-01-L 06          Install AC supply circuit412/12/2412/12/244.0h:
608-12-01-L 07          Install AC Keypad cable412/13/2412/13/244.0h:
608-12-01-L 08          Install fire monitoring cable412/13/2412/13/244.0h:
608-12-02      Intsall/ Connect3212/10/2412/13/2432.0h:
608-12-02-L        Labor3212/10/2412/13/240.8w:
608-12-02-L 01          Connect AC supply412/10/2412/10/244.0h:
608-12-02-L 02          Connect AC keypad412/10/2412/10/244.0h:
608-12-02-L 03          Install/connect overhead lighting412/11/2412/11/244.0h:
608-12-02-L 04          Install/connect wall lighting412/11/2412/11/244.0h:
608-12-02-L 05          Install/connect rope lighting412/12/2412/12/244.0h:
608-12-02-L 06          Install/connect emergency lighting412/12/2412/12/244.0h:
608-12-02-L 07          Install/connect outlet412/13/2412/13/244.0h:
608-12-02-L 08          Install/connect fire monitoring sensor412/13/2412/13/244.0h:
608-12-03      TV/Audio3212/12/2412/13/2416.0h:
608-12-03-L        Labor3212/12/2412/13/240.4w:
608-12-03-L 01          Install TV power supply412/12/2412/12/244.0h:
608-12-03-L 02          Install stereo power supply412/12/2412/12/244.0h:
608-12-03-L 03          Install TV signal cable412/13/2412/13/244.0h:
608-12-03-L 04          Install speaker cables412/13/2412/13/244.0h:
608-12-03-L 05          Connect TV power supply412/12/2412/12/244.0h:
608-12-03-L 06          Connect stereo power supply412/12/2412/12/244.0h:
608-12-03-L 07          Connect TV signal cable412/13/2412/13/244.0h:
608-12-03-L 08          Connect speaker cables412/13/2412/13/244.0h:
608-12-04      Finish trims412/13/2412/13/244.0h:
608-12-04-L        Labor412/13/2412/13/240.1w:
608-12-04-L 01          Install finish trim412/13/2412/13/244.0h:
609  Guest Bathroom 44012/11/2412/13/242.4w:
609-12    Electrical4012/11/2412/13/240.6w:
609-12-01      Rough in circuits2412/11/2412/13/2424.0h:
609-12-01-L        Labor2412/11/2412/13/240.6w:
609-12-01-L 01          Install overhead lighting circuit412/11/2412/11/244.0h:
609-12-01-L 02          Install wall lighting circuit412/11/2412/11/244.0h:
609-12-01-L 03          Install rope lighting circuit412/12/2412/12/244.0h:
609-12-01-L 04          Install vent fan circuits412/12/2412/12/244.0h:
609-12-01-L 05          Install outlet circuits412/13/2412/13/244.0h:
609-12-01-L 06          Install toilet soleniod cable412/13/2412/13/244.0h:
609-12-02      Install/Connect1212/12/2412/13/2412.0h:
609-12-02-L        Labor1212/12/2412/13/240.3w:
609-12-02-L 01          Install/connect overhead lighting212/12/2412/12/242.0h:
609-12-02-L 02          Install/connect wall lighting212/12/2412/12/242.0h:
609-12-02-L 03          Install/connect rope lighting212/13/2412/13/242.0h:
609-12-02-L 04          Install/connect vent fan212/13/2412/13/242.0h:
609-12-02-L 05          Install/connect outlet212/13/2412/13/242.0h:
609-12-02-L 06          Install/connect toilet soleniod cable212/13/2412/13/242.0h:
609-12-03      Finish trims412/13/2412/13/244.0h:
609-12-03-L        Labor412/13/2412/13/240.1w:
609-12-03-L 01          Install finish trim412/13/2412/13/244.0h:
615  Lower Guest Foyer - STBD4812/10/2412/13/241.3w:
615-12    Electrical4812/10/2412/13/240.7w:
615-12-01      Rough in2812/10/2412/13/2428.0h:
615-12-01-L        Labor2812/10/2412/13/240.7w:
615-12-01-L 01          Install overhead lighting circuit812/10/2412/11/248.0h:
615-12-01-L 02          Install rope lighting circuit812/11/2412/12/248.0h:
615-12-01-L 03          Install emergency lighting circuit412/12/2412/12/244.0h:
615-12-01-L 04          Install outlet circuits412/13/2412/13/244.0h:
615-12-01-L 05          Install fire monitoring cable412/13/2412/13/244.0h:
615-12-02      Intsall/ Connect1612/12/2412/13/2416.0h:
615-12-02-L        Labor1612/12/2412/13/240.4w:
615-12-02-L 01          Install/connect overhead lighting412/12/2412/12/244.0h:
615-12-02-L 02          Install/connect rope lighting412/12/2412/12/244.0h:
615-12-02-L 03          Install/connect emergency lighting412/13/2412/13/244.0h:
615-12-02-L 04          Install/connect outlet412/13/2412/13/244.0h:
615-12-03      Finish trims412/13/2412/13/244.0h:
615-12-03-L        Labor412/13/2412/13/240.1w:
615-12-03-L 01          Install finish trim412/13/2412/13/244.0h:
620  Captain's cabin 110012/10/2412/13/242.9w:
620-12    Electrical10012/10/2412/13/240.8w:
620-12-01      Rough in3212/10/2412/13/2432.0h:
620-12-01-L        Labor3212/10/2412/13/240.8w:
620-12-01-L 01          Install overhead lighting circuit412/10/2412/10/244.0h:
620-12-01-L 02          Install wall lighting circuit412/10/2412/10/244.0h:
620-12-01-L 03          Install rope lighting circuit412/11/2412/11/244.0h:
620-12-01-L 04          Install emergency lighting circuit412/11/2412/11/244.0h:
620-12-01-L 05          Install outlet circuits412/12/2412/12/244.0h:
620-12-01-L 06          Install AC supply circuit412/12/2412/12/244.0h:
620-12-01-L 07          Install AC Keypad cable412/13/2412/13/244.0h:
620-12-01-L 08          Install fire monitoring cable412/13/2412/13/244.0h:
620-12-02      Intsall/ Connect3212/10/2412/13/2432.0h:
620-12-02-L        Labor3212/10/2412/13/240.8w:
620-12-02-L 01          Connect AC supply412/10/2412/10/244.0h:
620-12-02-L 02          Connect AC keypad412/10/2412/10/244.0h:
620-12-02-L 03          Install/connect overhead lighting412/11/2412/11/244.0h:
620-12-02-L 04          Install/connect wall lighting412/11/2412/11/244.0h:
620-12-02-L 05          Install/connect rope lighting412/12/2412/12/244.0h:
620-12-02-L 06          Install/connect emergency lighting412/12/2412/12/244.0h:
620-12-02-L 07          Install/connect outlet412/13/2412/13/244.0h:
620-12-02-L 08          Install/connect fire monitoring sensor412/13/2412/13/244.0h:
620-12-03      TV/Audio3212/12/2412/13/2416.0h:
620-12-03-L        Labor3212/12/2412/13/240.4w:
620-12-03-L 01          Install TV power supply412/12/2412/12/244.0h:
620-12-03-L 02          Install stereo power supply412/12/2412/12/244.0h:
620-12-03-L 03          Install TV signal cable412/13/2412/13/244.0h:
620-12-03-L 04          Install speaker cables412/13/2412/13/244.0h:
620-12-03-L 05          Connect TV power supply412/12/2412/12/244.0h:
620-12-03-L 06          Connect stereo power supply412/12/2412/12/244.0h:
620-12-03-L 07          Connect TV signal cable412/13/2412/13/244.0h:
620-12-03-L 08          Connect speaker cables412/13/2412/13/244.0h:
620-12-04      Finish trims412/13/2412/13/244.0h:
620-12-04-L        Labor412/13/2412/13/240.1w:
620-12-04-L 01          Install finish trim412/13/2412/13/244.0h:
621  Captain's Bathroom4012/11/2412/13/241.9w:
621-12    Electrical4012/11/2412/13/240.6w:
621-12-01      Rough in circuits2412/11/2412/13/2424.0h:
621-12-01-L        Labor2412/11/2412/13/240.6w:
621-12-01-L 01          Install overhead lighting circuit412/11/2412/11/244.0h:
621-12-01-L 02          Install wall lighting circuit412/11/2412/11/244.0h:
621-12-01-L 03          Install rope lighting circuit412/12/2412/12/244.0h:
621-12-01-L 04          Install vent fan circuits412/12/2412/12/244.0h:
621-12-01-L 05          Install outlet circuits412/13/2412/13/244.0h:
621-12-01-L 06          Install toilet soleniod cable412/13/2412/13/244.0h:
621-12-02      Install/Connect1212/12/2412/13/2412.0h:
621-12-02-L        Labor1212/12/2412/13/240.3w:
621-12-02-L 01          Install/connect overhead lighting212/12/2412/12/242.0h:
621-12-02-L 02          Install/connect wall lighting212/12/2412/12/242.0h:
621-12-02-L 03          Install/connect rope lighting212/13/2412/13/242.0h:
621-12-02-L 04          Install/connect vent fan212/13/2412/13/242.0h:
621-12-02-L 05          Install/connect outlet212/13/2412/13/242.0h:
621-12-02-L 06          Install/connect toilet soleniod cable212/13/2412/13/242.0h:
621-12-03      Finish trims412/13/2412/13/244.0h:
621-12-03-L        Labor412/13/2412/13/240.1w:
621-12-03-L 01          Install finish trim412/13/2412/13/244.0h:
622  Crew cabin 110012/10/2412/13/242.9w:
622-12    Electrical10012/10/2412/13/240.8w:
622-12-01      Rough in3212/10/2412/13/2432.0h:
622-12-01-L        Labor3212/10/2412/13/240.8w:
622-12-01-L 01          Install overhead lighting circuit412/10/2412/10/244.0h:
622-12-01-L 02          Install wall lighting circuit412/10/2412/10/244.0h:
622-12-01-L 03          Install rope lighting circuit412/11/2412/11/244.0h:
622-12-01-L 04          Install emergency lighting circuit412/11/2412/11/244.0h:
622-12-01-L 05          Install outlet circuits412/12/2412/12/244.0h:
622-12-01-L 06          Install AC supply circuit412/12/2412/12/244.0h:
622-12-01-L 07          Install AC Keypad cable412/13/2412/13/244.0h:
622-12-01-L 08          Install fire monitoring cable412/13/2412/13/244.0h:
622-12-02      Intsall/ Connect3212/10/2412/13/2432.0h:
622-12-02-L        Labor3212/10/2412/13/240.8w:
622-12-02-L 01          Connect AC supply412/10/2412/10/244.0h:
622-12-02-L 02          Connect AC keypad412/10/2412/10/244.0h:
622-12-02-L 03          Install/connect overhead lighting412/11/2412/11/244.0h:
622-12-02-L 04          Install/connect wall lighting412/11/2412/11/244.0h:
622-12-02-L 05          Install/connect rope lighting412/12/2412/12/244.0h:
622-12-02-L 06          Install/connect emergency lighting412/12/2412/12/244.0h:
622-12-02-L 07          Install/connect outlet412/13/2412/13/244.0h:
622-12-02-L 08          Install/connect fire monitoring sensor412/13/2412/13/244.0h:
622-12-03      TV/Audio3212/12/2412/13/2416.0h:
622-12-03-L        Labor3212/12/2412/13/240.4w:
622-12-03-L 01          Install TV power supply412/12/2412/12/244.0h:
622-12-03-L 02          Install stereo power supply412/12/2412/12/244.0h:
622-12-03-L 03          Install TV signal cable412/13/2412/13/244.0h:
622-12-03-L 04          Install speaker cables412/13/2412/13/244.0h:
622-12-03-L 05          Connect TV power supply412/12/2412/12/244.0h:
622-12-03-L 06          Connect stereo power supply412/12/2412/12/244.0h:
622-12-03-L 07          Connect TV signal cable412/13/2412/13/244.0h:
622-12-03-L 08          Connect speaker cables412/13/2412/13/244.0h:
622-12-04      Finish trims412/13/2412/13/244.0h:
622-12-04-L        Labor412/13/2412/13/240.1w:
622-12-04-L 01          Install finish trim412/13/2412/13/244.0h:
623  Crew Bathroom 4012/11/2412/13/241.9w:
623-12    Electrical4012/11/2412/13/240.6w:
623-12-01      Rough in circuits2412/11/2412/13/2424.0h:
623-12-01-L        Labor2412/11/2412/13/240.6w:
623-12-01-L 01          Install overhead lighting circuit412/11/2412/11/244.0h:
623-12-01-L 02          Install wall lighting circuit412/11/2412/11/244.0h:
623-12-01-L 03          Install rope lighting circuit412/12/2412/12/244.0h:
623-12-01-L 04          Install vent fan circuits412/12/2412/12/244.0h:
623-12-01-L 05          Install outlet circuits412/13/2412/13/244.0h:
623-12-01-L 06          Install toilet soleniod cable412/13/2412/13/244.0h:
623-12-02      Install/Connect1212/12/2412/13/2412.0h:
623-12-02-L        Labor1212/12/2412/13/240.3w:
623-12-02-L 01          Install/connect overhead lighting212/12/2412/12/242.0h:
623-12-02-L 02          Install/connect wall lighting212/12/2412/12/242.0h:
623-12-02-L 03          Install/connect rope lighting212/13/2412/13/242.0h:
623-12-02-L 04          Install/connect vent fan212/13/2412/13/242.0h:
623-12-02-L 05          Install/connect outlet212/13/2412/13/242.0h:
623-12-02-L 06          Install/connect toilet soleniod cable212/13/2412/13/242.0h:
623-12-03      Finish trims412/13/2412/13/244.0h:
623-12-03-L        Labor412/13/2412/13/240.1w:
623-12-03-L 01          Install finish trim412/13/2412/13/244.0h:
624  Crew cabin 210012/10/2412/13/242.9w:
624-12    Electrical10012/10/2412/13/240.8w:
624-12-01      Rough in3212/10/2412/13/2432.0h:
624-12-01-L        Labor3212/10/2412/13/240.8w:
624-12-01-L 01          Install overhead lighting circuit412/10/2412/10/244.0h:
624-12-01-L 02          Install wall lighting circuit412/10/2412/10/244.0h:
624-12-01-L 03          Install rope lighting circuit412/11/2412/11/244.0h:
624-12-01-L 04          Install emergency lighting circuit412/11/2412/11/244.0h:
624-12-01-L 05          Install outlet circuits412/12/2412/12/244.0h:
624-12-01-L 06          Install AC supply circuit412/12/2412/12/244.0h:
624-12-01-L 07          Install AC Keypad cable412/13/2412/13/244.0h:
624-12-01-L 08          Install fire monitoring cable412/13/2412/13/244.0h:
624-12-02      Intsall/ Connect3212/10/2412/13/2432.0h:
624-12-02-L        Labor3212/10/2412/13/240.8w:
624-12-02-L 01          Connect AC supply412/10/2412/10/244.0h:
624-12-02-L 02          Connect AC keypad412/10/2412/10/244.0h:
624-12-02-L 03          Install/connect overhead lighting412/11/2412/11/244.0h:
624-12-02-L 04          Install/connect wall lighting412/11/2412/11/244.0h:
624-12-02-L 05          Install/connect rope lighting412/12/2412/12/244.0h:
624-12-02-L 06          Install/connect emergency lighting412/12/2412/12/244.0h:
624-12-02-L 07          Install/connect outlet412/13/2412/13/244.0h:
624-12-02-L 08          Install/connect fire monitoring sensor412/13/2412/13/244.0h:
624-12-03      TV/Audio3212/12/2412/13/2416.0h:
624-12-03-L        Labor3212/12/2412/13/240.4w:
624-12-03-L 01          Install TV power supply412/12/2412/12/244.0h:
624-12-03-L 02          Install stereo power supply412/12/2412/12/244.0h:
624-12-03-L 03          Install TV signal cable412/13/2412/13/244.0h:
624-12-03-L 04          Install speaker cables412/13/2412/13/244.0h:
624-12-03-L 05          Connect TV power supply412/12/2412/12/244.0h:
624-12-03-L 06          Connect stereo power supply412/12/2412/12/244.0h:
624-12-03-L 07          Connect TV signal cable412/13/2412/13/244.0h:
624-12-03-L 08          Connect speaker cables412/13/2412/13/244.0h:
624-12-04      Finish trims412/13/2412/13/244.0h:
624-12-04-L        Labor412/13/2412/13/240.1w:
624-12-04-L 01          Install finish trim412/13/2412/13/244.0h:
625  Crew Bathroom 24012/11/2412/13/241.9w:
625-12    Electrical4012/11/2412/13/240.6w:
625-12-01      Rough in circuits2412/11/2412/13/2424.0h:
625-12-01-L        Labor2412/11/2412/13/240.6w:
625-12-01-L 01          Install overhead lighting circuit412/11/2412/11/244.0h:
625-12-01-L 02          Install wall lighting circuit412/11/2412/11/244.0h:
625-12-01-L 03          Install rope lighting circuit412/12/2412/12/244.0h:
625-12-01-L 04          Install vent fan circuits412/12/2412/12/244.0h:
625-12-01-L 05          Install outlet circuits412/13/2412/13/244.0h:
625-12-01-L 06          Install toilet soleniod cable412/13/2412/13/244.0h:
625-12-02      Install/Connect1212/12/2412/13/2412.0h:
625-12-02-L        Labor1212/12/2412/13/240.3w:
625-12-02-L 01          Install/connect overhead lighting212/12/2412/12/242.0h:
625-12-02-L 02          Install/connect wall lighting212/12/2412/12/242.0h:
625-12-02-L 03          Install/connect rope lighting212/13/2412/13/242.0h:
625-12-02-L 04          Install/connect vent fan212/13/2412/13/242.0h:
625-12-02-L 05          Install/connect outlet212/13/2412/13/242.0h:
625-12-02-L 06          Install/connect toilet soleniod cable212/13/2412/13/242.0h:
625-12-03      Finish trims412/13/2412/13/244.0h:
625-12-03-L        Labor412/13/2412/13/240.1w:
625-12-03-L 01          Install finish trim412/13/2412/13/244.0h:
635  Laundry4812/10/2412/13/241.3w:
635-12    Electrical4812/10/2412/13/240.7w:
635-12-01      Rough in2812/10/2412/13/2428.0h:
635-12-01-L        Labor2812/10/2412/13/240.7w:
635-12-01-L 01          Install overhead lighting circuit812/10/2412/11/248.0h:
635-12-01-L 02          Install rope lighting circuit812/11/2412/12/248.0h:
635-12-01-L 03          Install emergency lighting circuit412/12/2412/12/244.0h:
635-12-01-L 04          Install outlet circuits412/13/2412/13/244.0h:
635-12-01-L 05          Install fire monitoring cable412/13/2412/13/244.0h:
635-12-02      Intsall/ Connect1612/12/2412/13/2416.0h:
635-12-02-L        Labor1612/12/2412/13/240.4w:
635-12-02-L 01          Install/connect overhead lighting412/12/2412/12/244.0h:
635-12-02-L 02          Install/connect rope lighting412/12/2412/12/244.0h:
635-12-02-L 03          Install/connect emergency lighting412/13/2412/13/244.0h:
635-12-02-L 04          Install/connect outlet412/13/2412/13/244.0h:
635-12-03      Finish trims412/13/2412/13/244.0h:
635-12-03-L        Labor412/13/2412/13/240.1w:
635-12-03-L 01          Install finish trim412/13/2412/13/244.0h:
636  Crew Lounge area8412/10/2412/13/242.0w:
636-12    Electrical8412/10/2412/13/240.8w:
636-12-01      Rough-in circuits3612/10/2412/13/2428.0h:
636-12-01-L        Labor3612/10/2412/13/240.7w:
636-12-01-L 01          Install overhead lighting circuit412/13/2412/13/244.0h:
636-12-01-L 02          Install emergency lighting circuit412/13/2412/13/244.0h:
636-12-01-L 03          Install fridge/freezer circuits412/10/2412/10/244.0h:
636-12-01-L 04          Install small appliance circuits412/11/2412/11/244.0h:
636-12-01-L 05          Install GFI outlet circuits412/11/2412/11/244.0h:
636-12-01-L 06          Install AC supply circuit412/12/2412/12/244.0h:
636-12-01-L 07          Install AC Keypad cable412/12/2412/12/244.0h:
636-12-01-L 08          Install DC charging staion412/13/2412/13/244.0h:
636-12-01-L 09          Install fire monitoring cable412/13/2412/13/244.0h:
636-12-02      Install/Connect3612/11/2412/13/2430.0h:
636-12-02-L        Labor3612/11/2412/13/240.5w:
636-12-02-L 01          Connect AC supply412/12/2412/12/244.0h:
636-12-02-L 02          Connect AC keypad412/13/2412/13/244.0h:
636-12-02-L 03          Install/connect overhead lighting412/13/2412/13/244.0h:
636-12-02-L 04          Install/connect emergency lighting412/13/2412/13/244.0h:
636-12-02-L 05          Install/connect fridge/freezer412/11/2412/11/244.0h:
636-12-02-L 06          Install/connect small appliance412/12/2412/12/244.0h:
636-12-02-L 07          Install/connect outlet412/12/2412/12/244.0h:
636-12-02-L 08          Install/connect DC charging staion412/13/2412/13/244.0h:
636-12-02-L 09          Install/connect fire monitoring sensor412/13/2412/13/244.0h:
636-12-03      TV/Audio412/13/2412/13/244.0h:
636-12-03-L        Labor412/13/2412/13/240.1w:
636-12-03-L 01          Install finish trim412/13/2412/13/244.0h:
636-12-04      Finish Trims812/13/2412/13/248.0h:
636-12-04-L        Labor812/13/2412/13/240.2w:
636-12-04-L 01          Install finish trim812/13/2412/13/248.0h:
641  Owners Stateroom13612/05/2412/13/243.2w:
641-12    Electrical13612/05/2412/13/241.4w:
641-12-01      Rough in5612/05/2412/13/2456.0h:
641-12-01-L        Labor5612/05/2412/13/241.4w:
641-12-01-L 01          Install overhead lighting circuit1212/05/2412/06/2412.0h:
641-12-01-L 02          Install wall lighting circuit412/06/2412/06/244.0h:
641-12-01-L 03          Install rope lighting circuit812/09/2412/09/248.0h:
641-12-01-L 04          Install emergency lighting circuit412/10/2412/10/244.0h:
641-12-01-L 05          Install outlet circuits812/10/2412/11/248.0h:
641-12-01-L 06          Install AC supply circuit412/11/2412/11/244.0h:
641-12-01-L 07          Install AC Keypad cable412/12/2412/12/244.0h:
641-12-01-L 08          Install DC charging staion812/12/2412/13/248.0h:
641-12-01-L 09          Install fire monitoring cable412/13/2412/13/244.0h:
641-12-02      Intsall/ Connect4412/06/2412/13/2444.0h:
641-12-02-L        Labor4412/06/2412/13/241.1w:
641-12-02-L 01          Connect AC supply412/06/2412/06/244.0h:
641-12-02-L 02          Connect AC keypad412/09/2412/09/244.0h:
641-12-02-L 03          Install/connect overhead lighting812/09/2412/10/248.0h:
641-12-02-L 04          Install/connect wall lighting412/10/2412/10/244.0h:
641-12-02-L 05          Install/connect rope lighting812/11/2412/11/248.0h:
641-12-02-L 06          Install/connect emergency lighting412/12/2412/12/244.0h:
641-12-02-L 07          Install/connect outlet412/12/2412/12/244.0h:
641-12-02-L 08          Install/connect DC charging staion412/13/2412/13/244.0h:
641-12-02-L 09          Install/connect fire monitoring sensor412/13/2412/13/244.0h:
641-12-03      TV/Audio3212/12/2412/13/2416.0h:
641-12-03-L        Labor3212/12/2412/13/240.4w:
641-12-03-L 01          Install TV power supply412/12/2412/12/244.0h:
641-12-03-L 02          Install stereo power supply412/12/2412/12/244.0h:
641-12-03-L 03          Install TV signal cable412/13/2412/13/244.0h:
641-12-03-L 04          Install speaker cables412/13/2412/13/244.0h:
641-12-03-L 05          Connect TV power supply412/12/2412/12/244.0h:
641-12-03-L 06          Connect stereo power supply412/12/2412/12/244.0h:
641-12-03-L 07          Connect TV signal cable412/13/2412/13/244.0h:
641-12-03-L 08          Connect speaker cables412/13/2412/13/244.0h:
641-12-04      Finish trims412/13/2412/13/244.0h:
641-12-04-L        Labor412/13/2412/13/240.1w:
641-12-04-L 01          Install finish trim412/13/2412/13/244.0h:
642  Owners Closet3612/12/2412/13/241.5w:
642-12    Electrical3612/12/2412/13/240.4w:
642-12-01      Rough in1612/12/2412/13/2416.0h:
642-12-01-L        Labor1612/12/2412/13/240.4w:
642-12-01-L 01          Install overhead lighting circuit (P)412/12/2412/12/244.0h:
642-12-01-L 02          Install rope lighting circuit (P)412/12/2412/12/244.0h:
642-12-01-L 03          Install emergency lighting circuit (P)412/13/2412/13/244.0h:
642-12-01-L 04          Install closet light cable (P)412/13/2412/13/244.0h:
642-12-02      Intsall/ Connect1612/12/2412/13/2416.0h:
642-12-02-L        Labor1612/12/2412/13/240.4w:
642-12-02-L 01          Install/connect overhead lighting (P)412/12/2412/12/244.0h:
642-12-02-L 02          Install/connect rope lighting (P)412/12/2412/12/244.0h:
642-12-02-L 03          Install/connect closet lighting (P)412/13/2412/13/244.0h:
642-12-02-L 04          Install/connect emergency lighting (P)412/13/2412/13/244.0h:
642-12-03      Finish trims412/13/2412/13/244.0h:
642-12-03-L        Labor412/13/2412/13/240.1w:
642-12-03-L 01          Install finish trim412/13/2412/13/244.0h:
643  Owners Bathroom5612/10/2412/13/243.8w:
643-12    Electrical5612/10/2412/13/240.7w:
643-12-01      Rough in circuits2812/10/2412/13/2428.0h:
643-12-01-L        Labor2812/10/2412/13/240.7w:
643-12-01-L 01          Install overhead lighting circuit812/10/2412/11/248.0h:
643-12-01-L 02          Install wall lighting circuit412/11/2412/11/244.0h:
643-12-01-L 03          Install rope lighting circuit412/12/2412/12/244.0h:
643-12-01-L 04          Install vent fan circuits412/12/2412/12/244.0h:
643-12-01-L 05          Install outlet circuits412/13/2412/13/244.0h:
643-12-01-L 06          Install toilet soleniod cable412/13/2412/13/244.0h:
643-12-02      Install/Connect2412/11/2412/13/2424.0h:
643-12-02-L        Labor2412/11/2412/13/240.6w:
643-12-02-L 01          Install/connect overhead lighting412/11/2412/11/244.0h:
643-12-02-L 02          Install/connect wall lighting412/11/2412/11/244.0h:
643-12-02-L 03          Install/connect rope lighting412/12/2412/12/244.0h:
643-12-02-L 04          Install/connect vent fan412/12/2412/12/244.0h:
643-12-02-L 05          Install/connect outlet412/13/2412/13/244.0h:
643-12-02-L 06          Install/connect toilet soleniod cable412/13/2412/13/244.0h:
643-12-03      Finish trims412/13/2412/13/244.0h:
643-12-03-L        Labor412/13/2412/13/240.1w:
643-12-03-L 01          Install finish trim412/13/2412/13/244.0h:
645  Galley14012/04/2412/13/242.0w:
645-12    Electrical14012/04/2412/13/241.6w:
645-12-01      Rough-in circuits6412/04/2412/13/2464.0h:
645-12-01-L        Labor6412/04/2412/13/241.6w:
645-12-01-L 01          Install overhead lighting circuit1212/04/2412/05/2412.0h:
645-12-01-L 02          Install rope lighting circuit812/05/2412/06/248.0h:
645-12-01-L 03          Install emergency lighting circuit412/06/2412/06/244.0h:
645-12-01-L 04          Install cooktop circuits412/09/2412/09/244.0h:
645-12-01-L 05          Install double ovens circuits412/09/2412/09/244.0h:
645-12-01-L 06          Install fridge/freezer circuits412/10/2412/10/244.0h:
645-12-01-L 07          Install small appliance circuits412/10/2412/10/244.0h:
645-12-01-L 08          Install GFI outlet circuits412/11/2412/11/244.0h:
645-12-01-L 09          Install AC supply circuit412/11/2412/11/244.0h:
645-12-01-L 10          Install AC Keypad cable412/12/2412/12/244.0h:
645-12-01-L 11          Install DC charging staion412/12/2412/12/244.0h:
645-12-01-L 12          Install fire monitoring cable812/13/2412/13/248.0h:
645-12-02      Install/Connect6012/04/2412/13/2460.0h:
645-12-02-L        Labor6012/04/2412/13/241.5w:
645-12-02-L 01          Connect AC supply412/04/2412/04/244.0h:
645-12-02-L 02          Connect AC keypad412/05/2412/05/244.0h:
645-12-02-L 03          Install/connect overhead lighting812/05/2412/06/248.0h:
645-12-02-L 04          Install/connect rope lighting812/06/2412/09/248.0h:
645-12-02-L 05          Install/connect emergency lighting412/09/2412/09/244.0h:
645-12-02-L 06          Install/connect cooktop412/10/2412/10/244.0h:
645-12-02-L 07          Install/connect double ovens412/10/2412/10/244.0h:
645-12-02-L 08          Install/connect fridge/freezer412/11/2412/11/244.0h:
645-12-02-L 09          Install/connect small appliance412/11/2412/11/244.0h:
645-12-02-L 10          Install/connect outlet812/12/2412/12/248.0h:
645-12-02-L 11          Install/connect DC charging staion412/13/2412/13/244.0h:
645-12-02-L 12          Install/connect fire monitoring sensor412/13/2412/13/244.0h:
645-12-03      TV/Audio812/13/2412/13/248.0h:
645-12-03-L        Labor812/13/2412/13/240.2w:
645-12-03-L 01          Install finish trim812/13/2412/13/248.0h:
645-12-04      Finish Trims812/13/2412/13/248.0h:
645-12-04-L        Labor812/13/2412/13/240.2w:
645-12-04-L 01          Install finish trim812/13/2412/13/248.0h:
647  Powder room4012/11/2412/13/241.9w:
647-12    Electrical4012/11/2412/13/240.6w:
647-12-01      Rough in circuits2412/11/2412/13/2424.0h:
647-12-01-L        Labor2412/11/2412/13/240.6w:
647-12-01-L 01          Install overhead lighting circuit412/11/2412/11/244.0h:
647-12-01-L 02          Install wall lighting circuit412/11/2412/11/244.0h:
647-12-01-L 03          Install rope lighting circuit412/12/2412/12/244.0h:
647-12-01-L 04          Install vent fan circuits412/12/2412/12/244.0h:
647-12-01-L 05          Install outlet circuits412/13/2412/13/244.0h:
647-12-01-L 06          Install toilet soleniod cable412/13/2412/13/244.0h:
647-12-02      Install/Connect1212/12/2412/13/2412.0h:
647-12-02-L        Labor1212/12/2412/13/240.3w:
647-12-02-L 01          Install/connect overhead lighting212/12/2412/12/242.0h:
647-12-02-L 02          Install/connect wall lighting212/12/2412/12/242.0h:
647-12-02-L 03          Install/connect rope lighting212/13/2412/13/242.0h:
647-12-02-L 04          Install/connect vent fan212/13/2412/13/242.0h:
647-12-02-L 05          Install/connect outlet212/13/2412/13/242.0h:
647-12-02-L 06          Install/connect toilet soleniod cable212/13/2412/13/242.0h:
647-12-03      Finish trims412/13/2412/13/244.0h:
647-12-03-L        Labor412/13/2412/13/240.1w:
647-12-03-L 01          Install finish trim412/13/2412/13/244.0h:
648  Port Main Foyer4412/12/2412/13/241.7w:
648-12    Electrical4412/12/2412/13/240.3w:
648-12-01      Rough in (P)1212/12/2412/13/2412.0h:
648-12-01-L        Labor1212/12/2412/13/240.3w:
648-12-01-L 01          Install overhead lighting circuit812/12/2412/13/248.0h:
648-12-01-L 02          Install emergency lighting circuit412/13/2412/13/244.0h:
648-12-02      Rough in (S)1212/12/2412/13/2412.0h:
648-12-02-L        Labor1212/12/2412/13/240.3w:
648-12-02-L 01          Install overhead lighting circuit812/12/2412/13/248.0h:
648-12-02-L 02          Install emergency lighting circuit412/13/2412/13/244.0h:
648-12-03      Intsall/ Connect (P)612/13/2412/13/246.0h:
648-12-03-L        Labor612/13/2412/13/240.2w:
648-12-03-L 01          Install/connect overhead lighting212/13/2412/13/242.0h:
648-12-03-L 02          Install/connect emergency lighting212/13/2412/13/242.0h:
648-12-03-L 03          Install/connect fire monitoring sensor212/13/2412/13/242.0h:
648-12-04      Intsall/ Connect (S)612/13/2412/13/246.0h:
648-12-04-L        Labor612/13/2412/13/240.2w:
648-12-04-L 01          Install/connect overhead lighting212/13/2412/13/242.0h:
648-12-04-L 02          Install/connect emergency lighting212/13/2412/13/242.0h:
648-12-04-L 03          Install/connect fire monitoring sensor212/13/2412/13/242.0h:
648-12-05      Finish trims (P)412/13/2412/13/244.0h:
648-12-05-L        Labor412/13/2412/13/240.1w:
648-12-05-L 01          Install finish trim412/13/2412/13/244.0h:
648-12-06      Finish trims (S)412/13/2412/13/244.0h:
648-12-06-L        Labor412/13/2412/13/240.1w:
648-12-06-L 01          Install finish trim412/13/2412/13/244.0h:
649  STBD Main Foyer4412/12/2412/13/241.7w:
649-12    Electrical4412/12/2412/13/240.3w:
649-12-01      Rough in (P)1212/12/2412/13/2412.0h:
649-12-01-L        Labor1212/12/2412/13/240.3w:
649-12-01-L 01          Install overhead lighting circuit812/12/2412/13/248.0h:
649-12-01-L 02          Install emergency lighting circuit412/13/2412/13/244.0h:
649-12-02      Rough in (S)1212/12/2412/13/2412.0h:
649-12-02-L        Labor1212/12/2412/13/240.3w:
649-12-02-L 01          Install overhead lighting circuit812/12/2412/13/248.0h:
649-12-02-L 02          Install emergency lighting circuit412/13/2412/13/244.0h:
649-12-03      Intsall/ Connect (P)612/13/2412/13/246.0h:
649-12-03-L        Labor612/13/2412/13/240.2w:
649-12-03-L 01          Install/connect overhead lighting212/13/2412/13/242.0h:
649-12-03-L 02          Install/connect emergency lighting212/13/2412/13/242.0h:
649-12-03-L 03          Install/connect fire monitoring sensor212/13/2412/13/242.0h:
649-12-04      Intsall/ Connect (S)612/13/2412/13/246.0h:
649-12-04-L        Labor612/13/2412/13/240.2w:
649-12-04-L 01          Install/connect overhead lighting212/13/2412/13/242.0h:
649-12-04-L 02          Install/connect emergency lighting212/13/2412/13/242.0h:
649-12-04-L 03          Install/connect fire monitoring sensor212/13/2412/13/242.0h:
649-12-05      Finish trims (P)412/13/2412/13/244.0h:
649-12-05-L        Labor412/13/2412/13/240.1w:
649-12-05-L 01          Install finish trim412/13/2412/13/244.0h:
649-12-06      Finish trims (S)412/13/2412/13/244.0h:
649-12-06-L        Labor412/13/2412/13/240.1w:
649-12-06-L 01          Install finish trim412/13/2412/13/244.0h:
652  Main Salon18011/22/2412/13/243.3w:
652-12    Electrical18011/22/2412/13/243.1w:
652-12-01      Rough-in Circuits7212/03/2412/13/2472.0h:
652-12-01-L        Labor7212/03/2412/13/241.8w:
652-12-01-L 01          Install overhead lighting circuit812/03/2412/03/248.0h:
652-12-01-L 02          Install wall lighting circuit812/04/2412/04/248.0h:
652-12-01-L 03          Install rope lighting circuit812/05/2412/05/248.0h:
652-12-01-L 04          Install motorized blind circuit812/06/2412/06/248.0h:
652-12-01-L 05          Install emergency lighting circuit812/09/2412/09/248.0h:
652-12-01-L 06          Install TV/Audio circuits812/10/2412/10/248.0h:
652-12-01-L 07          Install outlet circuits812/11/2412/11/248.0h:
652-12-01-L 08          Install AC supply circuit412/12/2412/12/244.0h:
652-12-01-L 09          Install AC Keypad cable412/12/2412/12/244.0h:
652-12-01-L 10          Install DC charging staion412/13/2412/13/244.0h:
652-12-01-L 11          Install fire monitoring cable412/13/2412/13/244.0h:
652-12-02      Install/Connect5612/05/2412/13/2456.0h:
652-12-02-L        Labor5612/05/2412/13/241.4w:
652-12-02-L 01          Connect AC supply412/05/2412/05/244.0h:
652-12-02-L 02          Connect AC keypad412/05/2412/05/244.0h:
652-12-02-L 03          Install/connect overhead lighting812/06/2412/06/248.0h:
652-12-02-L 04          Install/connect wall lighting812/09/2412/09/248.0h:
652-12-02-L 05          Install/connect rope lighting812/10/2412/10/248.0h:
652-12-02-L 06          Install/connect motorized blind812/11/2412/11/248.0h:
652-12-02-L 07          Install/connect emergency lighting412/12/2412/12/244.0h:
652-12-02-L 08          Install/connect outlet412/12/2412/12/244.0h:
652-12-02-L 09          Install/connect DC charging staion412/13/2412/13/244.0h:
652-12-02-L 10          Install/connect fire monitoring sensor412/13/2412/13/244.0h:
652-12-03      TV/Audio4812/10/2412/13/2428.0h:
652-12-03-L        Labor4812/10/2412/13/240.7w:
652-12-03-L 01          Install TV power supply412/10/2412/10/244.0h:
652-12-03-L 02          Install stereo power supply412/11/2412/11/244.0h:
652-12-03-L 03          Install TV signal cable412/11/2412/11/244.0h:
652-12-03-L 04          Install zone cables812/12/2412/12/248.0h:
652-12-03-L 05          Install speaker cables812/13/2412/13/248.0h:
652-12-03-L 06          Connect TV power supply412/11/2412/11/244.0h:
652-12-03-L 07          Connect stereo power supply412/12/2412/12/244.0h:
652-12-03-L 08          Connect TV signal cable412/12/2412/12/244.0h:
652-12-03-L 09          Connect speaker cables812/13/2412/13/248.0h:
652-12-04      Finish Trim411/22/2411/22/24124.0h:
652-12-04-L        Labor411/22/2411/22/240.1w:
652-12-04-L 01          Install finish trim411/22/2411/22/244.0h:
661  Pilothouse14012/04/2412/13/242.0w:
661-12    Electrical14012/04/2412/13/241.6w:
661-12-01      Rough-in circuits6412/04/2412/13/2464.0h:
661-12-01-L        Labor6412/04/2412/13/241.6w:
661-12-01-L 01          Install overhead lighting circuit1212/04/2412/05/2412.0h:
661-12-01-L 02          Install rope lighting circuit812/05/2412/06/248.0h:
661-12-01-L 03          Install emergency lighting circuit412/06/2412/06/244.0h:
661-12-01-L 04          Install cooktop circuits412/09/2412/09/244.0h:
661-12-01-L 05          Install double ovens circuits412/09/2412/09/244.0h:
661-12-01-L 06          Install fridge/freezer circuits412/10/2412/10/244.0h:
661-12-01-L 07          Install small appliance circuits412/10/2412/10/244.0h:
661-12-01-L 08          Install GFI outlet circuits412/11/2412/11/244.0h:
661-12-01-L 09          Install AC supply circuit412/11/2412/11/244.0h:
661-12-01-L 10          Install AC Keypad cable412/12/2412/12/244.0h:
661-12-01-L 11          Install DC charging staion412/12/2412/12/244.0h:
661-12-01-L 12          Install fire monitoring cable812/13/2412/13/248.0h:
661-12-02      Install/Connect6012/04/2412/13/2460.0h:
661-12-02-L        Labor6012/04/2412/13/241.5w:
661-12-02-L 01          Connect AC supply412/04/2412/04/244.0h:
661-12-02-L 02          Connect AC keypad412/05/2412/05/244.0h:
661-12-02-L 03          Install/connect overhead lighting812/05/2412/06/248.0h:
661-12-02-L 04          Install/connect rope lighting812/06/2412/09/248.0h:
661-12-02-L 05          Install/connect emergency lighting412/09/2412/09/244.0h:
661-12-02-L 06          Install/connect cooktop412/10/2412/10/244.0h:
661-12-02-L 07          Install/connect double ovens412/10/2412/10/244.0h:
661-12-02-L 08          Install/connect fridge/freezer412/11/2412/11/244.0h:
661-12-02-L 09          Install/connect small appliance412/11/2412/11/244.0h:
661-12-02-L 10          Install/connect outlet812/12/2412/12/248.0h:
661-12-02-L 11          Install/connect DC charging staion412/13/2412/13/244.0h:
661-12-02-L 12          Install/connect fire monitoring sensor412/13/2412/13/244.0h:
661-12-03      TV/Audio812/13/2412/13/248.0h:
661-12-03-L        Labor812/13/2412/13/240.2w:
661-12-03-L 01          Install finish trim812/13/2412/13/248.0h:
661-12-04      Finish Trims812/13/2412/13/248.0h:
661-12-04-L        Labor812/13/2412/13/240.2w:
661-12-04-L 01          Install finish trim812/13/2412/13/248.0h:
7MECHANICAL SPACES39212/02/2412/13/243.0w:
701  Chain locker2412/12/2412/13/243.0w:
701-12    Electrical2412/12/2412/13/2416.0h:
701-12-01      Rough-in circuits1612/12/2412/13/2416.0h:
701-12-01-L        Labor1612/12/2412/13/240.4w:
701-12-01-L 01          Install overhead lighting circuit1612/12/2412/13/2416.0h:
701-12-02      Install/Connect812/13/2412/13/248.0h:
701-12-02-L        Labor812/13/2412/13/240.2w:
701-12-02-L 01          Install/connect overhead lighting812/13/2412/13/248.0h:
702  Machinery room - FWD4412/10/2412/13/243.0w:
702-12    Electrical4412/10/2412/13/2428.0h:
702-12-01      Rough-in circuits2812/10/2412/13/2428.0h:
702-12-01-L        Labor2812/10/2412/13/240.7w:
702-12-01-L 01          Install overhead lighting circuit1612/10/2412/12/2416.0h:
702-12-01-L 02          Install outlet circuits1212/12/2412/13/2412.0h:
702-12-02      Install/Connect1612/12/2412/13/2416.0h:
702-12-02-L        Labor1612/12/2412/13/240.4w:
702-12-02-L 01          Install/connect overhead lighting812/12/2412/12/248.0h:
702-12-02-L 02          Install/connect outlet812/13/2412/13/248.0h:
703  Machinery room - MID4412/10/2412/13/243.0w:
703-12    Electrical4412/10/2412/13/2428.0h:
703-12-01      Rough-in circuits2812/10/2412/13/2428.0h:
703-12-01-L        Labor2812/10/2412/13/240.7w:
703-12-01-L 01          Install overhead lighting circuit1612/10/2412/12/2416.0h:
703-12-01-L 02          Install outlet circuits1212/12/2412/13/2412.0h:
703-12-02      Install/Connect1612/12/2412/13/2416.0h:
703-12-02-L        Labor1612/12/2412/13/240.4w:
703-12-02-L 01          Install/connect overhead lighting812/12/2412/12/248.0h:
703-12-02-L 02          Install/connect outlet812/13/2412/13/248.0h:
710  Garage13212/10/2412/13/243.0w:
710-12    Electrical13212/10/2412/13/2428.0h:
710-12-01      Rough-in circuits8412/10/2412/13/2428.0h:
710-12-01-L        Labor8412/10/2412/13/240.7w:
710-12-01-L 01          Install overhead lighting circuit1612/10/2412/12/2416.0h:
710-12-01-L 02          Install outlet circuits1212/12/2412/13/2412.0h:
710-12-01-L 03          Install overhead lighting circuit1612/10/2412/12/2416.0h:
710-12-01-L 04          Install outlet circuits1212/12/2412/13/2412.0h:
710-12-01-L 05          Install overhead lighting circuit1612/10/2412/12/2416.0h:
710-12-01-L 06          Install outlet circuits1212/12/2412/13/2412.0h:
710-12-03      Install/Connect4812/12/2412/13/2416.0h:
710-12-03-L        Labor4812/12/2412/13/240.4w:
710-12-03-L 01          Install/connect overhead lighting812/12/2412/12/248.0h:
710-12-03-L 02          Install/connect outlet812/13/2412/13/248.0h:
710-12-03-L 03          Install/connect overhead lighting812/12/2412/12/248.0h:
710-12-03-L 04          Install/connect outlet812/13/2412/13/248.0h:
710-12-03-L 05          Install/connect overhead lighting812/12/2412/12/248.0h:
710-12-03-L 06          Install/connect outlet812/13/2412/13/248.0h:
711  Lazzerette14812/02/2412/13/243.0w:
711-12    Electrical14812/02/2412/13/2476.0h:
711-12-01      Lazzerette door7212/03/2412/13/2472.0h:
711-12-01-L        Labor7212/03/2412/13/241.8w:
711-12-01-L 01          Rough in wiring to windlass 1612/03/2412/04/2416.0h:
711-12-01-L 02          Rough in wiring to windlass switches1612/05/2412/06/2416.0h:
711-12-01-L 03          Rough in wiring to control unit2412/09/2412/11/2424.0h:
711-12-01-L 04          Rough in monitor wiring1612/12/2412/13/2416.0h:
711-12-02      Install/Connect7612/02/2412/13/2476.0h:
711-12-02-L        Labor7612/02/2412/13/241.9w:
711-12-02-L 01          Connect control unit1612/02/2412/04/2416.0h:
711-12-02-L 02          Connect anchor windlass 1612/04/2412/06/2416.0h:
711-12-02-L 03          Connect anchor switches1612/06/2412/10/2416.0h:
711-12-02-L 04          Connect control panels1612/10/2412/12/2416.0h:
711-12-02-L 05          Connect monitor wiring1212/12/2412/13/2412.0h:
8EXTERIOR68012/04/2412/13/2433.2w:
802  Main deck - FWD3212/12/2412/13/244.6w:
802-12    Electrical3212/12/2412/13/240.3w:
802-12-01      Rough-in circuits1212/12/2412/13/2412.0h:
802-12-01-L        Labor1212/12/2412/13/240.3w:
802-12-01-L 01          Install deck lighting circuit1212/12/2412/13/2412.0h:
802-12-02      Install/Connect412/13/2412/13/244.0h:
802-12-02-L        Labor412/13/2412/13/240.1w:
802-12-02-L 01          Install/connect deck lighting412/13/2412/13/244.0h:
802-12-03      TV/Audio1612/13/2412/13/245.0h:
802-12-03-L        Labor1612/13/2412/13/240.1w:
802-12-03-L 01          Install stereo power supply412/13/2412/13/244.0h:
802-12-03-L 02          Install speaker cables412/13/2412/13/244.0h:
802-12-03-L 03          Connect stereo power supply412/13/2412/13/244.0h:
802-12-03-L 04          Connect speaker cables412/13/2412/13/244.0h:
803  Main deck Walkway - Port2012/12/2412/13/241.7w:
803-12    Electrical2012/12/2412/13/2412.0h:
803-12-01      Rough-in circuits1212/12/2412/13/2412.0h:
803-12-01-L        Labor1212/12/2412/13/240.3w:
803-12-01-L 01          Install deck lighting circuit1212/12/2412/13/2412.0h:
803-12-02      Install/Connect812/13/2412/13/248.0h:
803-12-02-L        Labor812/13/2412/13/240.2w:
803-12-02-L 01          Install/connect deck lighting812/13/2412/13/248.0h:
804  Main deck Walkway - STBD2012/12/2412/13/241.7w:
804-12    Electrical2012/12/2412/13/2412.0h:
804-12-01      Rough-in circuits1212/12/2412/13/2412.0h:
804-12-01-L        Labor1212/12/2412/13/240.3w:
804-12-01-L 01          Install deck lighting circuit1212/12/2412/13/2412.0h:
804-12-02      Install/Connect812/13/2412/13/248.0h:
804-12-02-L        Labor812/13/2412/13/240.2w:
804-12-02-L 01          Install/connect deck lighting812/13/2412/13/248.0h:
805  Main deck - Aft10012/05/2412/13/244.0w:
805-12    Electrical10012/05/2412/13/2456.0h:
805-12-01      Rough-in circuits5612/05/2412/13/2456.0h:
805-12-01-L        Labor5612/05/2412/13/241.4w:
805-12-01-L 01          Install overhead lighting circuit2412/05/2412/09/2424.0h:
805-12-01-L 02          Install emergency lighting circuit812/10/2412/10/248.0h:
805-12-01-L 03          Install deck lighting circuit1212/11/2412/12/2412.0h:
805-12-01-L 04          Install outlet circuits812/12/2412/13/248.0h:
805-12-01-L 05          Install phone/Cat 5 cables412/13/2412/13/244.0h:
805-12-02      Install/Connect1212/12/2412/13/2412.0h:
805-12-02-L        Labor1212/12/2412/13/240.3w:
805-12-02-L 01          Install/connect overhead lighting412/12/2412/12/244.0h:
805-12-02-L 02          Install/connect deck lighting412/13/2412/13/244.0h:
805-12-02-L 03          Install/connect outlet412/13/2412/13/244.0h:
805-12-03      TV/Audio3212/12/2412/13/2416.0h:
805-12-03-L        Labor3212/12/2412/13/240.4w:
805-12-03-L 01          Install TV power supply412/12/2412/12/244.0h:
805-12-03-L 02          Install stereo power supply412/12/2412/12/244.0h:
805-12-03-L 03          Install TV signal cable412/13/2412/13/244.0h:
805-12-03-L 04          Install speaker cables412/13/2412/13/244.0h:
805-12-03-L 05          Connect TV power supply412/12/2412/12/244.0h:
805-12-03-L 06          Connect stereo power supply412/12/2412/12/244.0h:
805-12-03-L 07          Connect TV signal cable412/13/2412/13/244.0h:
805-12-03-L 08          Connect speaker cables412/13/2412/13/244.0h:
806  Transom13212/10/2412/13/242.5w:
806-12    Electrical13212/10/2412/13/2428.0h:
806-12-01      Rough-in circuits8412/10/2412/13/2428.0h:
806-12-01-L        Labor8412/10/2412/13/240.7w:
806-12-01-L 01          Install overhead lighting circuit1612/10/2412/12/2416.0h:
806-12-01-L 02          Install outlet circuits1212/12/2412/13/2412.0h:
806-12-01-L 03          Install overhead lighting circuit1612/10/2412/12/2416.0h:
806-12-01-L 04          Install outlet circuits1212/12/2412/13/2412.0h:
806-12-01-L 05          Install overhead lighting circuit1612/10/2412/12/2416.0h:
806-12-01-L 06          Install outlet circuits1212/12/2412/13/2412.0h:
806-12-02      Install/Connect4812/12/2412/13/2416.0h:
806-12-02-L        Labor4812/12/2412/13/240.4w:
806-12-02-L 01          Install/connect overhead lighting812/12/2412/12/248.0h:
806-12-02-L 02          Install/connect outlet812/13/2412/13/248.0h:
806-12-02-L 03          Install/connect overhead lighting812/12/2412/12/248.0h:
806-12-02-L 04          Install/connect outlet812/13/2412/13/248.0h:
806-12-02-L 05          Install/connect overhead lighting812/12/2412/12/248.0h:
806-12-02-L 06          Install/connect outlet812/13/2412/13/248.0h:
807  Beach Club14412/04/2412/13/241.6w:
807-12    Electrical14412/04/2412/13/2464.0h:
807-12-01      Rough-in circuits2812/10/2412/13/2428.0h:
807-12-01-L        Labor2812/10/2412/13/240.7w:
807-12-01-L 01          Install deck lighting circuit1612/10/2412/12/2416.0h:
807-12-01-L 02          Install overhead lighting circuit1212/12/2412/13/2412.0h:
807-12-02      TV/Audio3212/12/2412/13/2416.0h:
807-12-02-L        Labor3212/12/2412/13/240.4w:
807-12-02-L 01          Install TV power supply412/12/2412/12/244.0h:
807-12-02-L 02          Install stereo power supply412/12/2412/12/244.0h:
807-12-02-L 03          Install TV signal cable412/13/2412/13/244.0h:
807-12-02-L 04          Install speaker cables412/13/2412/13/244.0h:
807-12-02-L 05          Connect TV power supply412/12/2412/12/244.0h:
807-12-02-L 06          Connect stereo power supply412/12/2412/12/244.0h:
807-12-02-L 07          Connect TV signal cable412/13/2412/13/244.0h:
807-12-02-L 08          Connect speaker cables412/13/2412/13/244.0h:
807-12-03      Install/Connect8412/04/2412/13/2464.0h:
807-12-03-L        Labor8412/04/2412/13/241.6w:
807-12-03-L 01          Connect Main control station6412/04/2412/13/2464.0h:
807-12-03-L 02          Install/connect deck lighting1212/11/2412/12/2412.0h:
807-12-03-L 03          Connect lights/outlets812/13/2412/13/248.0h:
815  Flybridge deck14412/04/2412/13/246.3w:
815-12    Electrical14412/04/2412/13/2464.0h:
815-12-01      Rough-in circuits2812/10/2412/13/2428.0h:
815-12-01-L        Labor2812/10/2412/13/240.7w:
815-12-01-L 01          Install deck lighting circuit1612/10/2412/12/2416.0h:
815-12-01-L 02          Install overhead lighting circuit1212/12/2412/13/2412.0h:
815-12-02      TV/Audio3212/12/2412/13/2416.0h:
815-12-02-L        Labor3212/12/2412/13/240.4w:
815-12-02-L 01          Install TV power supply412/12/2412/12/244.0h:
815-12-02-L 02          Install stereo power supply412/12/2412/12/244.0h:
815-12-02-L 03          Install TV signal cable412/13/2412/13/244.0h:
815-12-02-L 04          Install speaker cables412/13/2412/13/244.0h:
815-12-02-L 05          Connect TV power supply412/12/2412/12/244.0h:
815-12-02-L 06          Connect stereo power supply412/12/2412/12/244.0h:
815-12-02-L 07          Connect TV signal cable412/13/2412/13/244.0h:
815-12-02-L 08          Connect speaker cables412/13/2412/13/244.0h:
815-12-03      Install/Connect8412/04/2412/13/2464.0h:
815-12-03-L        Labor8412/04/2412/13/241.6w:
815-12-03-L 01          Connect Main control station6412/04/2412/13/2464.0h:
815-12-03-L 02          Install/connect deck lighting1212/11/2412/12/2412.0h:
815-12-03-L 03          Connect lights/outlets812/13/2412/13/248.0h:
816  Hardtop2412/12/2412/13/242.8w:
816-12    Electrical2412/12/2412/13/2416.0h:
816-12-01      Rough-in circuits1612/12/2412/13/2416.0h:
816-12-01-L        Labor1612/12/2412/13/240.4w:
816-12-01-L 01          Install overhead lighting circuit1612/12/2412/13/2416.0h:
816-12-02      Install/Connect812/13/2412/13/248.0h:
816-12-02-L        Labor812/13/2412/13/240.2w:
816-12-02-L 01          Connect lights/outlets812/13/2412/13/248.0h:
818  Electronics mast6412/09/2412/13/241.0w:
818-12    Electrical6412/09/2412/13/2440.0h:
818-12-01      Install navigation equipment6412/09/2412/13/2440.0h:
818-12-01-L        Labor6412/09/2412/13/241.0w:
818-12-01-L 01          Install cabling throrugh mast2412/11/2412/13/2424.0h:
818-12-01-L 02          Install components4012/09/2412/13/2440.0h:
******** *********************************************************************************